blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3653164

EP3653164 - DENTAL ANALYSIS WITH MISSING TEETH PREDICTION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.07.2022
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  23.07.2021
FormerGrant of patent is intended
Status updated on  29.03.2021
FormerRequest for examination was made
Status updated on  20.11.2020
FormerThe application has been published
Status updated on  17.04.2020
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Align Technology, Inc.
2820 Orchard Parkway
San Jose, CA 95134 / US
[2020/21]
Inventor(s)01 / PIMENOV, Alexander
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
02 / STERENTAL, Rene M.
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
03 / PROKOSHEV, Valery
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
04 / IVANOVA, Irina
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
05 / MEDNIKOV, Dmitry
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
06 / LIKHTMAN, Boris
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
07 / STRIZHEV, Alexander
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
08 / MAKARENKOVA, Svetlana
c/o Align Technology, Inc.
2820 Orchard Parkway
San Jose, California 95134 / US
 [2020/21]
Representative(s)Hancox, Jonathan Christopher
Venner Shipley LLP
Windsor House
6-10 Mount Ephraim Road
Tunbridge Wells, Kent TN1 1EE / GB
[2021/34]
Former [2020/21]Brookes IP
Windsor House
6-10 Mount Ephraim Road
Tunbridge Wells, Kent TN1 1EE / GB
Application number, filing date19209384.715.11.2019
[2020/21]
Priority number, dateUS201862768806P16.11.2018         Original published format: US 201862768806 P
US20191668361614.11.2019         Original published format: US201916683616
[2020/21]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3653164
Date:20.05.2020
Language:EN
[2020/21]
Type: B1 Patent specification 
No.:EP3653164
Date:25.08.2021
Language:EN
[2021/34]
Search report(s)(Supplementary) European search report - dispatched on:EP07.04.2020
ClassificationIPC:A61C7/00
[2020/21]
CPC:
A61C7/002 (EP,US); A61C19/04 (CN,US); A61C9/0053 (US);
G06T17/20 (US); G06T7/0012 (US); G06T7/60 (US);
G06T2200/24 (US); G06T2207/30036 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/52]
Former [2020/21]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ZAHNÄRZTLICHE ANALYSE MIT VORHERSAGE FEHLENDER ZÄHNE[2020/21]
English:DENTAL ANALYSIS WITH MISSING TEETH PREDICTION[2020/21]
French:ANALYSE DENTAIRE COMPORTANT UNE PRÉDICTION DE DENTS MANQUANTES[2020/21]
Examination procedure13.11.2020Amendment by applicant (claims and/or description)
13.11.2020Examination requested  [2020/52]
13.11.2020Date on which the examining division has become responsible
30.03.2021Communication of intention to grant the patent
20.07.2021Fee for grant paid
20.07.2021Fee for publishing/printing paid
20.07.2021Receipt of the translation of the claim(s)
Divisional application(s)EP21192908.8  / EP3954320
Opposition(s)27.05.2022No opposition filed within time limit [2022/31]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.11.2019
AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
MK25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
TR25.08.2021
IE15.11.2021
LU15.11.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
[2024/29]
Former [2024/23]HU15.11.2019
AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
MK25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE15.11.2021
LU15.11.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
Former [2023/33]HU15.11.2019
AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE15.11.2021
LU15.11.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
Former [2023/30]AL25.08.2021
AT25.08.2021
CY25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE15.11.2021
LU15.11.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/48]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
IE15.11.2021
LU15.11.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/36]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
IT25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SI25.08.2021
SK25.08.2021
SM25.08.2021
LU15.11.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/34]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
LU15.11.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/33]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
MC25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
BE30.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/29]AL25.08.2021
AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/25]AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
SM25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/24]AT25.08.2021
CZ25.08.2021
DK25.08.2021
EE25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RO25.08.2021
RS25.08.2021
SE25.08.2021
SK25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/21]AT25.08.2021
DK25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/10]AT25.08.2021
ES25.08.2021
FI25.08.2021
HR25.08.2021
LT25.08.2021
LV25.08.2021
PL25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
GR26.11.2021
IS25.12.2021
PT27.12.2021
Former [2022/09]AT25.08.2021
ES25.08.2021
FI25.08.2021
LT25.08.2021
RS25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
PT27.12.2021
Former [2022/08]AT25.08.2021
ES25.08.2021
FI25.08.2021
LT25.08.2021
SE25.08.2021
BG25.11.2021
NO25.11.2021
Former [2022/07]AT25.08.2021
LT25.08.2021
NO25.11.2021
Documents cited:Search[A]US2007218418  (RABY RICHARD E [US], et al) [A] 1 * abstract ** paragraph [0041] *;
 [A]WO2012112867  (3M INNOVATIVE PROPERTIES CO [US], et al) [A] 1 * abstract * * page 8, lines 6-12 *;
 [AP]WO2019217559  (ALIGN TECHNOLOGY INC [US]) [AP] 1 * abstract * * paragraphs [0003] - [0009] - [0 12] - [0016] - [0 23] , [0030] , [0079] , [0088] , [0116] - [0127] *
by applicantWO9858596
 US5975893
 WO2018US37849
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.