EP3632364 - INDICATOR MECHANISM FOR AN ACTUATOR CONTROLLED SURGICAL INSTRUMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 06.12.2020 | ||
Former | Request for examination was made Status updated on 06.03.2020 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states Intuitive Surgical Operations, Inc. 1020 Kifer Road Sunnyvale, CA 94086 / US | [2020/15] | Inventor(s) | 01 /
ALDEN, Donald 1312 Nelson Way Sunnyvale, CA 94087 / US | 02 /
LAMBRECHT, Bram Gilbert Antoon 1153 Clinton St Redwood City, CA 94061 / US | [2021/37] |
Former [2021/35] | 01 /
ALDEN, Donald 1312 Nelson Way Sunnyvale, CA 94087 / US | ||
02 /
LAMBRECHT, Bram Gilbert Antoon 11523 Clinton St Redwood City, CA 94061 / US | |||
Former [2020/15] | 01 /
ALDEN, Donald 1312 Nelson Way Sunnyvale, CA 94087 / US | ||
02 /
LAMBRECHT, Bram Gilbert Antoon 633 Azara Place, Apt 3 Sunnyvale, CA 94086 / US | Representative(s) | Hirsz, Christopher Stanislaw Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [2021/35] |
Former [2020/15] | Hirsz, Christopher Stanislaw Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 19212146.5 | 17.03.2015 | [2020/15] | Priority number, date | US201461954453P | 17.03.2014 Original published format: US 201461954453 P | US201462012081P | 13.06.2014 Original published format: US 201462012081 P | [2020/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3632364 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Type: | B1 Patent specification | No.: | EP3632364 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.01.2020 | Classification | IPC: | A61B34/30, // A61B17/00, A61B90/00 | [2020/15] | CPC: |
A61B34/30 (EP,US);
A61B90/08 (KR);
A61B34/37 (KR);
A61B2017/00477 (EP,KR,US);
A61B2090/0803 (EP,KR,US);
A61B2090/0807 (EP,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/15] | Title | German: | ANZEIGEMECHANISMUS FÜR EIN AKTUATORGESTEUERTES CHIRURGISCHES INSTRUMENT | [2020/15] | English: | INDICATOR MECHANISM FOR AN ACTUATOR CONTROLLED SURGICAL INSTRUMENT | [2020/15] | French: | MÉCANISME INDICATEUR POUR INSTRUMENT CHIRURGICAL COMMANDÉ PAR ACTIONNEUR | [2020/15] | Examination procedure | 03.03.2020 | Examination requested [2020/15] | 03.03.2020 | Date on which the examining division has become responsible | 02.10.2020 | Amendment by applicant (claims and/or description) | 07.12.2020 | Communication of intention to grant the patent | 18.05.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 19.07.2021 | Fee for grant paid | 19.07.2021 | Fee for publishing/printing paid | 19.07.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP15765163.9 / EP3119330 | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 19.07.2021 | Request for further processing filed | 19.07.2021 | Full payment received (date of receipt of payment) Request granted | 30.07.2021 | Decision despatched | Fees paid | Renewal fee | 28.11.2019 | Renewal fee patent year 03 | 28.11.2019 | Renewal fee patent year 04 | 28.11.2019 | Renewal fee patent year 05 | 27.03.2020 | Renewal fee patent year 06 | 29.03.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.03.2015 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | NL | 01.09.2021 | PL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | GB | 17.03.2022 | IE | 17.03.2022 | LU | 17.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | FR | 31.03.2022 | LI | 31.03.2022 | [2024/25] |
Former [2024/23] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 17.03.2022 | ||
IE | 17.03.2022 | ||
LU | 17.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 17.03.2022 | ||
IE | 17.03.2022 | ||
LU | 17.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 17.03.2022 | ||
IE | 17.03.2022 | ||
LU | 17.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 17.03.2022 | ||
IE | 17.03.2022 | ||
LU | 17.03.2022 | ||
CH | 31.03.2022 | ||
FR | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
GB | 17.03.2022 | ||
IE | 17.03.2022 | ||
LU | 17.03.2022 | ||
FR | 31.03.2022 | ||
Former [2023/06] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
FR | 31.03.2022 | ||
Former [2022/47] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Documents cited: | Search | [A]EP1790294 (MAX CO LTD [JP]) [A] 1-13 * paragraph [0029] - paragraph [0032]; figure 2 *; | [A]US2011137323 (MALKOWSKI JAROSLAW T [US], et al) [A] 1-13 * paragraph [0057] - paragraph [0064]; figures 2-8 *; | [A]US2012143211 (KISHI KOSUKE [JP]) [A] 1-13* paragraphs [0038] , [0044] , [0047] * |