EP3712620 - ACOUSTIC AIR DATA SENSING SYSTEM WITH SKIN FRICTION SENSOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.09.2022 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 24.09.2021 | ||
Former | Grant of patent is intended Status updated on 01.06.2021 | ||
Former | Request for examination was made Status updated on 22.01.2021 | ||
Former | The application has been published Status updated on 21.08.2020 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states ROSEMOUNT AEROSPACE INC. 14300 Judicial Road Burnsville, MN 55306-4898 / US | [2020/39] | Inventor(s) | 01 /
MATHEIS, Brian Daniel 10369 Upper 178th Street West Lakeville, MN 55044 / US | 02 /
SHANNON, Daniel W. 43 Nye Road Glastonbury, CT 06033 / US | 03 /
KOUSHIK, Surdarshan N. 15 Rye Ridge Parkway West Hartford, CT 06117 / US | [2021/26] |
Former [2020/39] | 01 /
MATHEIS, Brian Daniel 10369 Upper 178th Street West Lakeville, MN Minnesota 55044 / US | ||
02 /
SHANNON, Daniel W. 43 Nye Road Glastonbury, CT Connecticut 06033 / US | |||
03 /
KOUSHIK, Surdarshan N. 15 Rye Ridge Parkway West Hartford, CT Connecticut 06117 / US | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2020/39] | Application number, filing date | 19213156.3 | 03.12.2019 | [2020/39] | Priority number, date | US201916361005 | 21.03.2019 Original published format: US201916361005 | [2020/39] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3712620 | Date: | 23.09.2020 | Language: | EN | [2020/39] | Type: | B1 Patent specification | No.: | EP3712620 | Date: | 27.10.2021 | Language: | EN | [2021/43] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.06.2020 | Classification | IPC: | G01P5/24, G01P5/04, G01P5/10, G01P13/02, G01P13/00, G01H5/00, G01N13/00, G01N19/02, G01N29/00 | [2021/23] | CPC: |
G01H5/00 (EP,BR);
G01P5/245 (EP,BR,US);
G01N29/00 (EP);
G01P13/025 (EP,BR);
G01P5/02 (US);
G01N13/00 (EP);
|
Former IPC [2020/39] | G01P5/24, G01P5/04, G01P5/10, G01P13/02, G01P13/00, G01H5/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/08] |
Former [2020/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SYSTEM ZUR ERFASSUNG AKUSTISCHER LUFTDATEN MIT OBERFLÄCHENREIBUNGSSENSOR | [2020/39] | English: | ACOUSTIC AIR DATA SENSING SYSTEM WITH SKIN FRICTION SENSOR | [2020/39] | French: | SYSTÈME DE DÉTECTION ACOUSTIQUE DE DONNÉES D'AIR DOTÉ DE CAPTEUR DE FROTTEMENT DE SURFACE | [2020/39] | Examination procedure | 18.01.2021 | Examination requested [2021/08] | 18.01.2021 | Date on which the examining division has become responsible | 02.06.2021 | Communication of intention to grant the patent | 21.09.2021 | Fee for grant paid | 21.09.2021 | Fee for publishing/printing paid | 21.09.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 28.07.2022 | No opposition filed within time limit [2022/40] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.12.2019 | AL | 27.10.2021 | AT | 27.10.2021 | CY | 27.10.2021 | CZ | 27.10.2021 | DK | 27.10.2021 | EE | 27.10.2021 | ES | 27.10.2021 | FI | 27.10.2021 | HR | 27.10.2021 | IT | 27.10.2021 | LT | 27.10.2021 | LV | 27.10.2021 | MC | 27.10.2021 | MK | 27.10.2021 | NL | 27.10.2021 | PL | 27.10.2021 | RO | 27.10.2021 | RS | 27.10.2021 | SE | 27.10.2021 | SI | 27.10.2021 | SK | 27.10.2021 | SM | 27.10.2021 | IE | 03.12.2021 | LU | 03.12.2021 | BE | 31.12.2021 | BG | 27.01.2022 | NO | 27.01.2022 | GR | 28.01.2022 | IS | 27.02.2022 | PT | 28.02.2022 | [2024/23] |
Former [2023/33] | HU | 03.12.2019 | |
AL | 27.10.2021 | ||
AT | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 03.12.2021 | ||
LU | 03.12.2021 | ||
BE | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/30] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CY | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 03.12.2021 | ||
LU | 03.12.2021 | ||
BE | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/27] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
IT | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 03.12.2021 | ||
LU | 03.12.2021 | ||
BE | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2023/01] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SI | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 03.12.2021 | ||
LU | 03.12.2021 | ||
BE | 31.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/49] | AL | 27.10.2021 | |
AT | 27.10.2021 | ||
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 03.12.2021 | ||
LU | 03.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/48] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
IE | 03.12.2021 | ||
LU | 03.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/46] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
LU | 03.12.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/35] | AT | 27.10.2021 | |
CZ | 27.10.2021 | ||
DK | 27.10.2021 | ||
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SK | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/34] | AT | 27.10.2021 | |
EE | 27.10.2021 | ||
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RO | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/33] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
MC | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
SM | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/25] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
BG | 27.01.2022 | ||
NO | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/24] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
NL | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
SE | 27.10.2021 | ||
BG | 27.01.2022 | ||
GR | 28.01.2022 | ||
IS | 27.02.2022 | ||
PT | 28.02.2022 | ||
Former [2022/23] | AT | 27.10.2021 | |
ES | 27.10.2021 | ||
FI | 27.10.2021 | ||
HR | 27.10.2021 | ||
LT | 27.10.2021 | ||
LV | 27.10.2021 | ||
PL | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
PT | 28.02.2022 | ||
Former [2022/22] | AT | 27.10.2021 | |
FI | 27.10.2021 | ||
LT | 27.10.2021 | ||
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
Former [2022/21] | AT | 27.10.2021 | |
RS | 27.10.2021 | ||
BG | 27.01.2022 | ||
Former [2022/19] | BG | 27.01.2022 | Documents cited: | Search | [A]FR3027398 (AER [FR]) [A] 1-15 * abstract * * pages 11,21,22 * * pages 24-27 *; | [A]FR2974908 (AER [FR]) [A] 1-15 * abstract * * pages 6,12,14 *; | [A]CN107202746 (SUPER HIGH SPEED AIR FORCE RES INSTITUTE OF CHINA AERODYNAMICS RES AND DEVELOPMENT CENTER) [A] 1,9 * the whole document *; | [E]EP3633388 (ROSEMOUNT AEROSPACE INC [US]) [E] 1,4,9 * abstract * * paragraphs [0002] - [0009] - [0027] , [0041] - [0042] * |