EP3654127 - METHOD FOR PLATOONING OF VEHICLES AND VEHICLE USING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.02.2022 Database last updated on 04.06.2024 | |
Former | The patent has been granted Status updated on 26.02.2021 | ||
Former | Grant of patent is intended Status updated on 17.11.2020 | ||
Former | Request for examination was made Status updated on 17.04.2020 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeouidaero Yeongdeungpogu SEOUL, 07336 / KR | [2020/21] | Inventor(s) | 01 /
YOON, Jaehwan 19, Yangjae-daero 11gil, Seocho-gu 06772 Seoul / KR | 02 /
KI, Hyunho 19, Yangjae-daero 11gil, Seocho-gu 06772 Seoul / KR | 03 /
KIM, Hansung 19, Yangjae-daero 11gil, Seocho-gu 06772 Seoul / KR | 04 /
PARK, Suho 19, Yangjae-daero 11gil, Seocho-gu 06772 Seoul / KR | 05 /
BAE, Jaeseung 19, Yangjae-daero 11gil, Seocho-gu 06772 Seoul / KR | [2020/21] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2020/21] | Application number, filing date | 19213162.1 | 03.01.2018 | [2020/21] | Priority number, date | KR20170117385 | 13.09.2017 Original published format: KR 20170117385 | [2020/21] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3654127 | Date: | 20.05.2020 | Language: | EN | [2020/21] | Type: | B1 Patent specification | No.: | EP3654127 | Date: | 31.03.2021 | Language: | EN | [2021/13] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.04.2020 | Classification | IPC: | G05D1/02, G08G1/00 | [2020/50] | CPC: |
G05D1/0293 (EP);
G08G1/22 (EP,KR);
G05D1/0295 (EP,US);
B60W30/16 (KR);
G05D1/0027 (US);
G05D1/0088 (US);
G05D1/0276 (US);
H04B17/318 (KR);
H04L43/08 (US);
|
Former IPC [2020/21] | G05D1/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/37] |
Former [2020/21] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN FÜR FAHRZEUGE IN EINER KOLONNE UND FAHRZEUG DAMIT | [2020/21] | English: | METHOD FOR PLATOONING OF VEHICLES AND VEHICLE USING SAME | [2020/21] | French: | PROCÉDÉ DE GROUPEMENT DE VÉHICULES ET VÉHICULE L'UTILISANT | [2020/21] | Examination procedure | 03.01.2020 | Examination requested [2020/21] | 18.11.2020 | Communication of intention to grant the patent | 23.02.2021 | Fee for grant paid | 23.02.2021 | Fee for publishing/printing paid | 23.02.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP18150149.5 / EP3457245 | Opposition(s) | 04.01.2022 | No opposition filed within time limit [2022/10] | Fees paid | Renewal fee | 03.01.2020 | Renewal fee patent year 03 | 25.01.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.01.2018 | AL | 31.03.2021 | AT | 31.03.2021 | CY | 31.03.2021 | CZ | 31.03.2021 | DK | 31.03.2021 | EE | 31.03.2021 | ES | 31.03.2021 | FI | 31.03.2021 | HR | 31.03.2021 | IT | 31.03.2021 | LT | 31.03.2021 | LV | 31.03.2021 | MC | 31.03.2021 | MK | 31.03.2021 | NL | 31.03.2021 | PL | 31.03.2021 | RO | 31.03.2021 | RS | 31.03.2021 | SE | 31.03.2021 | SI | 31.03.2021 | SK | 31.03.2021 | SM | 31.03.2021 | BG | 30.06.2021 | NO | 30.06.2021 | IS | 31.07.2021 | PT | 02.08.2021 | GB | 03.01.2022 | IE | 03.01.2022 | LU | 03.01.2022 | [2024/25] |
Former [2024/23] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
MK | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 03.01.2022 | ||
IE | 03.01.2022 | ||
LU | 03.01.2022 | ||
Former [2024/20] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CY | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 03.01.2022 | ||
IE | 03.01.2022 | ||
LU | 03.01.2022 | ||
Former [2023/09] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 03.01.2022 | ||
IE | 03.01.2022 | ||
LU | 03.01.2022 | ||
Former [2022/47] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
GB | 03.01.2022 | ||
LU | 03.01.2022 | ||
Former [2022/46] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
LU | 03.01.2022 | ||
Former [2022/39] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
MC | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/36] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
IT | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/29] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SI | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/23] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/10] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
IS | 24.12.2021 | ||
Former [2022/08] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
DK | 31.03.2021 | ||
EE | 31.03.2021 | ||
ES | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2022/07] | AL | 31.03.2021 | |
AT | 31.03.2021 | ||
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/52] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
PL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/51] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
IS | 31.07.2021 | ||
PT | 02.08.2021 | ||
Former [2021/50] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RO | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SK | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
PT | 02.08.2021 | ||
Former [2021/48] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
EE | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/47] | AT | 31.03.2021 | |
CZ | 31.03.2021 | ||
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
NL | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/46] | AT | 31.03.2021 | |
FI | 31.03.2021 | ||
HR | 31.03.2021 | ||
LT | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
SM | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/38] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
SE | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/37] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
LV | 31.03.2021 | ||
RS | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/36] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
BG | 30.06.2021 | ||
NO | 30.06.2021 | ||
Former [2021/35] | FI | 31.03.2021 | |
HR | 31.03.2021 | ||
NO | 30.06.2021 | ||
Former [2021/33] | FI | 31.03.2021 | |
NO | 30.06.2021 | Documents cited: | Search | [A]WO2010098554 (KOREA ADVANCED INST SCI & TECH [KR], et al) [A] 1-14* paragraphs [0054] - [0056]; figures 15-17 *; | [A]WO2016065055 (ASK Y LLC [US]) [A] 1-14 * paragraphs [0043] , [0 64]; figures 1,2,5 *; | [A]WO2017022881 (LG ELECTRONICS INC [KR]) [A] 1-14 * paragraphs [0148] - [0152] - [ 313] - [0318]; figures 1,7,15-18 * |