EP3672382 - PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT [Right-click to bookmark this link] | |||
Former [2020/26] | PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT | ||
[2020/28] | Status | No opposition filed within time limit Status updated on 09.06.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 01.07.2022 | ||
Former | Grant of patent is intended Status updated on 24.02.2022 | ||
Former | Request for examination was made Status updated on 18.12.2020 | ||
Former | The application has been published Status updated on 22.05.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Valeo eAutomotive France SAS 14 Avenue des Béguines 95800 Cergy / FR | [2022/41] |
Former [2020/26] | For all designated states Valeo Siemens eAutomotive France SAS 14 Avenue des Béguines 95800 Cergy / FR | Inventor(s) | 01 /
LEGENDRE, Alexandre 7 cour du Mûrier 95280 Jouy-le-Moutier / FR | 02 /
POUILLY, Aurélien 71 avenue du Maréchal Foch 78300 Poissy / FR | [2022/31] |
Former [2020/26] | 01 /
LEGENDRE, Alexandre 7 cour du Mûrier 95280 JOUY-LE-MOUTIER / FR | ||
02 /
POUILLY, Aurélien 71 avenue du Maréchal Foch 78300 POISSY / FR | Representative(s) | Valeo Powertrain Systems Service Propriété Intellectuelle Immeuble le Delta 14, avenue des Béguines 95892 Cergy Pontoise / FR | [N/P] |
Former [2022/31] | (deleted) | ||
Former [2020/26] | Argyma 14 Boulevard de Strasbourg 31000 Toulouse / FR | Application number, filing date | 19213473.2 | 04.12.2019 | [2020/26] | Priority number, date | FR20180073801 | 21.12.2018 Original published format: FR 1873801 | [2020/26] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3672382 | Date: | 24.06.2020 | Language: | FR | [2020/26] | Type: | B1 Patent specification | No.: | EP3672382 | Date: | 03.08.2022 | Language: | FR | [2022/31] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.05.2020 | Classification | IPC: | H05K7/20 | [2020/26] | CPC: |
H05K7/2049 (EP);
H05K7/20 (CN);
H05K7/209 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/03] |
Former [2020/26] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PRESSELEMENT, MONTAGE UND ELEKTRISCHE AUSRÜSTUNG | [2022/11] | English: | PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT | [2022/11] | French: | ORGANE DE PLAQUAGE, ENSEMBLE ET EQUIPEMENT ELECTRIQUE | [2020/26] |
Former [2020/26] | PRESSELEMENT, MONTAGE UND ELEKTRISCHE AUSRÜSTUNG | ||
Former [2020/26] | PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT | Examination procedure | 16.12.2020 | Amendment by applicant (claims and/or description) | 16.12.2020 | Examination requested [2021/03] | 16.12.2020 | Date on which the examining division has become responsible | 25.02.2022 | Communication of intention to grant the patent | 28.06.2022 | Fee for grant paid | 28.06.2022 | Fee for publishing/printing paid | 28.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 04.05.2023 | No opposition filed within time limit [2023/28] | Fees paid | Renewal fee | 30.11.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.12.2019 | AL | 03.08.2022 | AT | 03.08.2022 | BG | 03.08.2022 | CY | 03.08.2022 | CZ | 03.08.2022 | DK | 03.08.2022 | EE | 03.08.2022 | ES | 03.08.2022 | FI | 03.08.2022 | HR | 03.08.2022 | IT | 03.08.2022 | LT | 03.08.2022 | LV | 03.08.2022 | MC | 03.08.2022 | MK | 03.08.2022 | MT | 03.08.2022 | NL | 03.08.2022 | PL | 03.08.2022 | RO | 03.08.2022 | RS | 03.08.2022 | SE | 03.08.2022 | SI | 03.08.2022 | SK | 03.08.2022 | SM | 03.08.2022 | NO | 03.11.2022 | GR | 04.11.2022 | IS | 03.12.2022 | IE | 04.12.2022 | LU | 04.12.2022 | PT | 05.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | [2024/44] |
Former [2024/34] | HU | 04.12.2019 | |
AL | 03.08.2022 | ||
AT | 03.08.2022 | ||
BG | 03.08.2022 | ||
CY | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
IT | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
MC | 03.08.2022 | ||
MK | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/29] | HU | 04.12.2019 | |
AL | 03.08.2022 | ||
AT | 03.08.2022 | ||
CY | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
IT | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
MC | 03.08.2022 | ||
MK | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/27] | HU | 04.12.2019 | |
AL | 03.08.2022 | ||
AT | 03.08.2022 | ||
CY | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
IT | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
MK | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/26] | HU | 04.12.2019 | |
AL | 03.08.2022 | ||
AT | 03.08.2022 | ||
CY | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
IT | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/21] | HU | 04.12.2019 | |
AL | 03.08.2022 | ||
AT | 03.08.2022 | ||
CY | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2024/18] | HU | 04.12.2019 | |
AL | 03.08.2022 | ||
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/49] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/48] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
IE | 04.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/47] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
Former [2023/38] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
LU | 04.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/37] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SI | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/29] | AL | 03.08.2022 | |
AT | 03.08.2022 | ||
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/23] | AT | 03.08.2022 | |
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
EE | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SK | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/22] | AT | 03.08.2022 | |
CZ | 03.08.2022 | ||
DK | 03.08.2022 | ||
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RO | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/21] | DK | 03.08.2022 | |
ES | 03.08.2022 | ||
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/20] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
SM | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/12] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
IS | 03.12.2022 | ||
PT | 05.12.2022 | ||
Former [2023/11] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
PL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
PT | 05.12.2022 | ||
Former [2023/10] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
HR | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | ||
GR | 04.11.2022 | ||
PT | 05.12.2022 | ||
Former [2023/09] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
LT | 03.08.2022 | ||
LV | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | ||
PT | 05.12.2022 | ||
Former [2023/08] | ES | 03.08.2022 | |
FI | 03.08.2022 | ||
LT | 03.08.2022 | ||
NL | 03.08.2022 | ||
RS | 03.08.2022 | ||
SE | 03.08.2022 | ||
NO | 03.11.2022 | Documents cited: | Search | [A]JP2000223630 (SHARP KK) [A] 1-14 * paragraph [0028] - paragraph [0034]; figures 5-12 *; | [A]DE10142987 (CONTI TEMIC MICROELECTRONIC [DE]) [A] 1-14 * paragraph [0020] - paragraph [0025]; figures 4-7 *; | [XI]JP2005116650 (SANYO ELECTRIC CO, et al) [X] 1,3,8 * paragraph [0012] - paragraph [0001]; figures 1-4 * [I] 2,4-7,9-14; | [AD]WO2014033382 (VALEO SYS CONTROLE MOTEUR SAS [FR]) [AD] 1-14 * the whole document *; | [A]EP3197035 (VALEO SYSTEMES DE CONTROLE MOTEUR [FR]) [A] 1-14* paragraph [0041] - paragraph [0072]; figures 1-3 * | by applicant | WO2014033382 |