blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3672382

EP3672382 - PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT [Right-click to bookmark this link]
Former [2020/26]PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT
[2020/28]
StatusNo opposition filed within time limit
Status updated on  09.06.2023
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  01.07.2022
FormerGrant of patent is intended
Status updated on  24.02.2022
FormerRequest for examination was made
Status updated on  18.12.2020
FormerThe application has been published
Status updated on  22.05.2020
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Valeo eAutomotive France SAS
14 Avenue des Béguines
95800 Cergy / FR
[2022/41]
Former [2020/26]For all designated states
Valeo Siemens eAutomotive France SAS
14 Avenue des Béguines
95800 Cergy / FR
Inventor(s)01 / LEGENDRE, Alexandre
7 cour du Mûrier
95280 Jouy-le-Moutier / FR
02 / POUILLY, Aurélien
71 avenue du Maréchal Foch
78300 Poissy / FR
 [2022/31]
Former [2020/26]01 / LEGENDRE, Alexandre
7 cour du Mûrier
95280 JOUY-LE-MOUTIER / FR
02 / POUILLY, Aurélien
71 avenue du Maréchal Foch
78300 POISSY / FR
Representative(s)Valeo Powertrain Systems
Service Propriété Intellectuelle
Immeuble le Delta
14, avenue des Béguines
95892 Cergy Pontoise / FR
[N/P]
Former [2022/31](deleted)
Former [2020/26]Argyma
14 Boulevard de Strasbourg
31000 Toulouse / FR
Application number, filing date19213473.204.12.2019
[2020/26]
Priority number, dateFR2018007380121.12.2018         Original published format: FR 1873801
[2020/26]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3672382
Date:24.06.2020
Language:FR
[2020/26]
Type: B1 Patent specification 
No.:EP3672382
Date:03.08.2022
Language:FR
[2022/31]
Search report(s)(Supplementary) European search report - dispatched on:EP07.05.2020
ClassificationIPC:H05K7/20
[2020/26]
CPC:
H05K7/2049 (EP); H05K7/20 (CN); H05K7/209 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/03]
Former [2020/26]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PRESSELEMENT, MONTAGE UND ELEKTRISCHE AUSRÜSTUNG[2022/11]
English:PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT[2022/11]
French:ORGANE DE PLAQUAGE, ENSEMBLE ET EQUIPEMENT ELECTRIQUE[2020/26]
Former [2020/26]PRESSELEMENT, MONTAGE UND ELEKTRISCHE AUSRÜSTUNG
Former [2020/26]PRESSING ELEMENT, ASSEMBLY AND ELECTRICAL EQUIPMENT
Examination procedure16.12.2020Amendment by applicant (claims and/or description)
16.12.2020Examination requested  [2021/03]
16.12.2020Date on which the examining division has become responsible
25.02.2022Communication of intention to grant the patent
28.06.2022Fee for grant paid
28.06.2022Fee for publishing/printing paid
28.06.2022Receipt of the translation of the claim(s)
Opposition(s)04.05.2023No opposition filed within time limit [2023/28]
Fees paidRenewal fee
30.11.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.12.2019
AL03.08.2022
AT03.08.2022
BG03.08.2022
CY03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
IT03.08.2022
LT03.08.2022
LV03.08.2022
MC03.08.2022
MK03.08.2022
MT03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
[2024/44]
Former [2024/34]HU04.12.2019
AL03.08.2022
AT03.08.2022
BG03.08.2022
CY03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
IT03.08.2022
LT03.08.2022
LV03.08.2022
MC03.08.2022
MK03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/29]HU04.12.2019
AL03.08.2022
AT03.08.2022
CY03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
IT03.08.2022
LT03.08.2022
LV03.08.2022
MC03.08.2022
MK03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/27]HU04.12.2019
AL03.08.2022
AT03.08.2022
CY03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
IT03.08.2022
LT03.08.2022
LV03.08.2022
MK03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/26]HU04.12.2019
AL03.08.2022
AT03.08.2022
CY03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
IT03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/21]HU04.12.2019
AL03.08.2022
AT03.08.2022
CY03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2024/18]HU04.12.2019
AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/49]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/48]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
IE04.12.2022
LU04.12.2022
PT05.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/47]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
LU04.12.2022
PT05.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/38]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
LU04.12.2022
PT05.12.2022
Former [2023/37]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SI03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/29]AL03.08.2022
AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/23]AT03.08.2022
CZ03.08.2022
DK03.08.2022
EE03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SK03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/22]AT03.08.2022
CZ03.08.2022
DK03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RO03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/21]DK03.08.2022
ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/20]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
SM03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/12]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
IS03.12.2022
PT05.12.2022
Former [2023/11]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
PL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
PT05.12.2022
Former [2023/10]ES03.08.2022
FI03.08.2022
HR03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
GR04.11.2022
PT05.12.2022
Former [2023/09]ES03.08.2022
FI03.08.2022
LT03.08.2022
LV03.08.2022
NL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
PT05.12.2022
Former [2023/08]ES03.08.2022
FI03.08.2022
LT03.08.2022
NL03.08.2022
RS03.08.2022
SE03.08.2022
NO03.11.2022
Documents cited:Search[A]JP2000223630  (SHARP KK) [A] 1-14 * paragraph [0028] - paragraph [0034]; figures 5-12 *;
 [A]DE10142987  (CONTI TEMIC MICROELECTRONIC [DE]) [A] 1-14 * paragraph [0020] - paragraph [0025]; figures 4-7 *;
 [XI]JP2005116650  (SANYO ELECTRIC CO, et al) [X] 1,3,8 * paragraph [0012] - paragraph [0001]; figures 1-4 * [I] 2,4-7,9-14;
 [AD]WO2014033382  (VALEO SYS CONTROLE MOTEUR SAS [FR]) [AD] 1-14 * the whole document *;
 [A]EP3197035  (VALEO SYSTEMES DE CONTROLE MOTEUR [FR]) [A] 1-14* paragraph [0041] - paragraph [0072]; figures 1-3 *
by applicantWO2014033382
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.