blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3831911

EP3831911 - COMPOSITE WAVELENGTH CONVERTER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  14.04.2023
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  06.05.2022
FormerGrant of patent is intended
Status updated on  11.01.2022
FormerRequest for examination was made
Status updated on  23.10.2021
FormerThe application has been published
Status updated on  07.05.2021
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Friedrich-Alexander-Universität Erlangen-Nürnberg
Schlossplatz 4
91054 Erlangen / DE
For all designated states
Uniwersytet Kazimierza Wielkiego w Bydgoszczy
ul. Jana Karola Chodkiewicza 30
85-064 Bydgoszcz / PL
[2021/23]
Inventor(s)01 / Prof. Dr. Zorenko, Yuriy
Glogowska str., 20F/1
85-381 Bydgoszcz / PL
02 / Dr. Batentschuk, Miroslaw
Hofreuthackerstr. 111
90482 Nürnberg / DE
03 / Prof. Dr. Brabec, Christoph
Albrecht Dürer Str. 12
90433 Nürnberg / DE
04 / Dr. Osvet, Andres
Isarstr. 6
91052 Erlangen / DE
05 / Dr. Gorbenko, Vitalii
Baczynskiego str., 10/7
85-822 Bydgoszcz / PL
06 / Dr. Ievgen, Levchuk
Westliche Stadtmauerstr. 50
91054 Erlangen / DE
07 / Zorenko, Tetiana
Glogowska str., 20F/1
85-381 Bydgoszcz / PL
08 / Chepyga, Liudmyla
Lorentzlaan 1
3514 HZ Utrecht / NL
09 / Markovskyi, Anton
Jana Kozletulskiego 11/22
85-657 Bydgoszcz / PL
10 / Witkiewicz-Lukaszek, Sandra
Na Skarpie str.,1
85-031 Osielsko / PL
 [2021/23]
Representative(s)Louis Pöhlau Lohrentz
Patentanwälte
Merianstrasse 26
90409 Nürnberg / DE
[2021/23]
Application number, filing date19213887.305.12.2019
[2021/23]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3831911
Date:09.06.2021
Language:EN
[2021/23]
Type: B1 Patent specification 
No.:EP3831911
Date:08.06.2022
Language:EN
[2022/23]
Search report(s)(Supplementary) European search report - dispatched on:EP26.02.2020
ClassificationIPC:C09K11/80, C30B19/02, C30B29/28, H01L33/50
[2021/23]
CPC:
C09K11/7774 (EP); H01L33/504 (EP,US); C09K11/77742 (EP);
C30B19/02 (EP); C30B19/04 (US); C30B19/12 (US);
C30B29/28 (EP,US); C30B31/04 (US); G02B5/208 (US);
H01L33/0041 (EP); H01L2933/0041 (US); Y02B20/00 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/47]
Former [2021/23]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERBUNDWELLENLÄNGENWANDLER[2021/23]
English:COMPOSITE WAVELENGTH CONVERTER[2021/23]
French:CONVERTISSEUR COMPOSITE DE LONGUEUR D'ONDE[2021/23]
Examination procedure14.10.2021Examination requested  [2021/47]
14.10.2021Date on which the examining division has become responsible
12.01.2022Communication of intention to grant the patent
27.04.2022Fee for grant paid
27.04.2022Fee for publishing/printing paid
27.04.2022Receipt of the translation of the claim(s)
Opposition(s)10.03.2023No opposition filed within time limit [2023/20]
Fees paidRenewal fee
25.11.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.12.2019
AL08.06.2022
AT08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
MK08.06.2022
MT08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
BE31.12.2022
[2024/44]
Former [2024/29]HU05.12.2019
AL08.06.2022
AT08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MC08.06.2022
MK08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
BE31.12.2022
Former [2024/27]HU05.12.2019
AL08.06.2022
AT08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
MK08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
BE31.12.2022
Former [2024/25]HU05.12.2019
AL08.06.2022
AT08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
BE31.12.2022
Former [2024/21]AL08.06.2022
AT08.06.2022
CY08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
BE31.12.2022
Former [2024/11]AL08.06.2022
AT08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
IT08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
BE31.12.2022
Former [2023/49]AL08.06.2022
AT08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
BE31.12.2022
Former [2023/38]AL08.06.2022
AT08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
LU05.12.2022
Former [2023/25]AL08.06.2022
AT08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SI08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/21]AL08.06.2022
AT08.06.2022
CZ08.06.2022
DK08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/17]AL08.06.2022
AT08.06.2022
CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/12]AT08.06.2022
CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
IS08.10.2022
PT10.10.2022
Former [2023/11]AT08.06.2022
CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
PL08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
PT10.10.2022
Former [2023/09]AT08.06.2022
CZ08.06.2022
EE08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
RO08.06.2022
RS08.06.2022
SE08.06.2022
SK08.06.2022
SM08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
PT10.10.2022
Former [2023/08]AT08.06.2022
ES08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
RS08.06.2022
SE08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2023/07]AT08.06.2022
FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
RS08.06.2022
SE08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/50]FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
RS08.06.2022
SE08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/49]FI08.06.2022
HR08.06.2022
LT08.06.2022
LV08.06.2022
SE08.06.2022
BG08.09.2022
NO08.09.2022
GR09.09.2022
Former [2022/47]FI08.06.2022
LT08.06.2022
SE08.06.2022
NO08.09.2022
Documents cited:Search[A]US2014361328  (SHIMAMURA KIYOSHI [JP], et al) [A] 1-17* paragraph [0132] - paragraph [0149]; figures 8-10; example 2; claims 1-13 *;
 [A]  - S. WITKIEWICZ-LUKASZEK ET AL, "Epitaxial growth of composite scintillators based on Tb 3 Al 5 O 12 ?:?Ce single crystalline films and Gd 3 Al 2.5 Ga 2.5 O 12 ?:?Ce crystal substrates", CRYSTENGCOMM, (20180101), vol. 20, no. 28, doi:10.1039/C8CE00536B, pages 3994 - 4002, XP055666915 [A] 1-17 * abstract; section 2;; figure 1(a) *

DOI:   http://dx.doi.org/10.1039/C8CE00536B
 [A]  - V. GORBENKO ET AL, "Luminescence of Ce3+ multicenters in Ca2+-Mg2+-Si4+ based garnet phosphors", JOURNAL OF LUMINESCENCE, NL, (20180701), vol. 199, doi:10.1016/j.jlumin.2018.03.058, ISSN 0022-2313, pages 245 - 250, XP055666887 [A] 1-17 * abstract; section 2 *

DOI:   http://dx.doi.org/10.1016/j.jlumin.2018.03.058
by applicantEP2670817
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.