| EP3712552 - METHOD FOR CALIBRATING A TOUCH PROBE IN A GEAR CUTTING MACHINE [Right-click to bookmark this link] | |||
| Former [2020/39] | METHOD FOR CALIBRATING A MEASUREMENT SENSOR IN A GEAR CUTTING MACHINE | ||
| [2020/49] | Status | No opposition filed within time limit Status updated on 14.01.2022 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 05.02.2021 | ||
| Former | Grant of patent is intended Status updated on 10.11.2020 | ||
| Former | Request for examination was made Status updated on 11.09.2020 | ||
| Former | The application has been published Status updated on 21.08.2020 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Liebherr-Verzahntechnik GmbH Kaufbeurer Straße 141 87437 Kempten / DE | [2020/39] | Inventor(s) | 01 /
van Hauth, Johannes Feichtmayrstraße 4 87435 Kempten / DE | [2020/39] | Representative(s) | Behr, Wolfgang Lorenz Seidler Gossel Rechtsanwälte Patentanwälte Partnerschaft mbB Widenmayerstraße 23 80538 München / DE | [2020/39] | Application number, filing date | 19216879.7 | 17.12.2019 | [2020/39] | Priority number, date | DE201910104891 | 26.02.2019 Original published format: DE102019104891 | [2020/39] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3712552 | Date: | 23.09.2020 | Language: | DE | [2020/39] | Type: | B1 Patent specification | No.: | EP3712552 | Date: | 10.03.2021 | Language: | DE | [2021/10] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.08.2020 | Classification | IPC: | G01B5/20, G01B21/04, B23F23/12, B24B19/00, // B24B49/02 | [2020/49] | CPC: |
G01B21/042 (EP,KR);
G01B5/00 (CN);
G01B5/202 (EP,KR,US);
B23F1/06 (US);
B23F23/12 (EP);
B23F23/1218 (EP);
B24B19/009 (EP);
G01B5/0004 (US);
G01M13/021 (KR);
B24B49/02 (EP)
(-)
|
| Former IPC [2020/39] | G01B5/20, G01B21/04, B23Q17/20, B23F23/12, B24B19/00, // B24B49/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/39] | Title | German: | VERFAHREN ZUM KALIBRIEREN EINES MESSTASTERS IN EINER VERZAHNMASCHINE | [2020/39] | English: | METHOD FOR CALIBRATING A TOUCH PROBE IN A GEAR CUTTING MACHINE | [2020/49] | French: | PROCÉDÉ D'ÉTALONNAGE D'UN PALPEUR DE MESURE DANS UNE MACHINE À TAILLER LES ENGRENAGES | [2020/39] |
| Former [2020/39] | METHOD FOR CALIBRATING A MEASUREMENT SENSOR IN A GEAR CUTTING MACHINE | Examination procedure | 09.09.2020 | Examination requested [2020/42] | 09.09.2020 | Date on which the examining division has become responsible | 11.11.2020 | Communication of intention to grant the patent | 29.01.2021 | Fee for grant paid | 29.01.2021 | Fee for publishing/printing paid | 29.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 13.12.2021 | No opposition filed within time limit [2022/07] |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.12.2019 | AL | 10.03.2021 | CY | 10.03.2021 | CZ | 10.03.2021 | DK | 10.03.2021 | EE | 10.03.2021 | ES | 10.03.2021 | FI | 10.03.2021 | HR | 10.03.2021 | LT | 10.03.2021 | LV | 10.03.2021 | MC | 10.03.2021 | MK | 10.03.2021 | MT | 10.03.2021 | NL | 10.03.2021 | PL | 10.03.2021 | RO | 10.03.2021 | RS | 10.03.2021 | SE | 10.03.2021 | SI | 10.03.2021 | SK | 10.03.2021 | SM | 10.03.2021 | TR | 10.03.2021 | BG | 10.06.2021 | NO | 10.06.2021 | GR | 11.06.2021 | IS | 10.07.2021 | PT | 12.07.2021 | [2026/05] |
| Former [2024/42] | HU | 17.12.2019 | |
| AL | 10.03.2021 | ||
| CY | 10.03.2021 | ||
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| MC | 10.03.2021 | ||
| MK | 10.03.2021 | ||
| MT | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SI | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2024/23] | HU | 17.12.2019 | |
| AL | 10.03.2021 | ||
| CY | 10.03.2021 | ||
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| MC | 10.03.2021 | ||
| MK | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SI | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2023/41] | HU | 17.12.2019 | |
| AL | 10.03.2021 | ||
| CY | 10.03.2021 | ||
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| MC | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SI | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2023/33] | HU | 17.12.2019 | |
| AL | 10.03.2021 | ||
| CY | 10.03.2021 | ||
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| MC | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2023/30] | AL | 10.03.2021 | |
| CY | 10.03.2021 | ||
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| MC | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2022/33] | AL | 10.03.2021 | |
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| MC | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2022/23] | AL | 10.03.2021 | |
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2022/10] | AL | 10.03.2021 | |
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| PT | 12.07.2021 | ||
| Former [2022/08] | AL | 10.03.2021 | |
| CZ | 10.03.2021 | ||
| DK | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| ES | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2022/07] | AL | 10.03.2021 | |
| CZ | 10.03.2021 | ||
| EE | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2021/52] | CZ | 10.03.2021 | |
| EE | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| PL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2021/51] | CZ | 10.03.2021 | |
| EE | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| IS | 10.07.2021 | ||
| PT | 12.07.2021 | ||
| Former [2021/50] | CZ | 10.03.2021 | |
| EE | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| RO | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SK | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| PT | 12.07.2021 | ||
| Former [2021/48] | CZ | 10.03.2021 | |
| EE | 10.03.2021 | ||
| FI | 10.03.2021 | ||
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| Former [2021/46] | FI | 10.03.2021 | |
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| SM | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| Former [2021/43] | FI | 10.03.2021 | |
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| NL | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| Former [2021/38] | FI | 10.03.2021 | |
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| SE | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| Former [2021/37] | FI | 10.03.2021 | |
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| LV | 10.03.2021 | ||
| RS | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| Former [2021/36] | FI | 10.03.2021 | |
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| BG | 10.06.2021 | ||
| NO | 10.06.2021 | ||
| GR | 11.06.2021 | ||
| Former [2021/35] | FI | 10.03.2021 | |
| HR | 10.03.2021 | ||
| LT | 10.03.2021 | ||
| NO | 10.06.2021 | ||
| Former [2021/33] | FI | 10.03.2021 | |
| LT | 10.03.2021 | ||
| NO | 10.06.2021 | Documents cited: | Search | [AD] EP2554938 (MITSUBISHI HEAVY IND MACHINE TOOL CO LTD et al.) | [AD] DE102013003585 (LIEBHERR VERZAHNTECH GMBH et al.) [AD] 1-15 * abstract * * paragraphs [0001] - [0017]; figures 1-8 * | [A] JP2013011443 (MITSUBISHI HEAVY IND LTD et al.) [A] 1-15 * abstract * | [A] EP2016370 (RENISHAW PLC et al.) [A] 1-15 * abstract * | [A] US2013139660 (MAXTED PAUL et al.) [A] 1-15 * the whole document * | by applicant | EP2554938 |