blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3677760

EP3677760 - DEFLECTOR FOR THE FAIRING OF A TURBINE ENGINE PINION, ASSOCIATED GEAR UNIT AND TURBINE ENGINE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.01.2024
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  27.01.2023
FormerGrant of patent is intended
Status updated on  11.09.2022
FormerRequest for examination was made
Status updated on  13.11.2020
FormerThe application has been published
Status updated on  05.06.2020
Most recent event   Tooltip30.08.2024Lapse of the patent in a contracting state
New state(s): MC
published on 02.10.2024 [2024/40]
Applicant(s)For all designated states
Safran Transmission Systems
18 Boulevard Louis Seguin
92700 Colombes / FR
[2020/28]
Inventor(s)01 / GUILLEMONT, Maxence, Gérard, Claude
SAFRAN TRANSMISSION SYSTEMS
C/O SAFRAN AIRCRAFT ENGINES PI (AJI)
Rond-Point
René Ravaud-Réau
77550 MOISSY CRAMAYEL / FR
 [2020/28]
Representative(s)Cabinet Camus Lebkiri
25 rue de Maubeuge
75009 Paris / FR
[2020/28]
Application number, filing date19216997.717.12.2019
[2020/28]
Priority number, dateFR2019000005704.01.2019         Original published format: FR 1900057
[2020/28]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3677760
Date:08.07.2020
Language:FR
[2020/28]
Type: B1 Patent specification 
No.:EP3677760
Date:01.03.2023
Language:FR
[2023/09]
Search report(s)(Supplementary) European search report - dispatched on:EP12.05.2020
ClassificationIPC:F02C7/32, F02C7/36, F16H57/04
[2020/28]
CPC:
F02C7/32 (EP); F16H57/023 (CN); F01D25/24 (US);
F02C7/36 (EP); F04D29/06 (US); F04D29/5806 (US);
F16H55/17 (CN); F16H57/0412 (CN); F16H57/0421 (CN);
F16H57/0423 (EP); F16H57/0456 (EP); F16H57/0495 (EP);
F05D2260/4031 (EP); F05D2260/98 (EP); Y02T50/60 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/51]
Former [2020/28]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:DEFLEKTOR FÜR DAS GEHÄUSE EINES TURBOMASCHINENRITZELS, ENTSPRECHENDES GETRIEBEGEHÄUSE UND ENTSPRECHENDE TURBOMASCHINE[2020/28]
English:DEFLECTOR FOR THE FAIRING OF A TURBINE ENGINE PINION, ASSOCIATED GEAR UNIT AND TURBINE ENGINE[2020/28]
French:DÉFLECTEUR POUR LE CARENAGE D'UN PIGNON DE TURBOMACHINE, BOITIER D'ENGRENAGES ET TURBOMACHINE ASSOCIÉS[2020/28]
Examination procedure09.11.2020Amendment by applicant (claims and/or description)
09.11.2020Examination requested  [2020/51]
09.11.2020Date on which the examining division has become responsible
12.09.2022Communication of intention to grant the patent
17.01.2023Fee for grant paid
17.01.2023Fee for publishing/printing paid
17.01.2023Receipt of the translation of the claim(s)
Opposition(s)04.12.2023No opposition filed within time limit [2024/06]
Fees paidRenewal fee
16.12.2021Renewal fee patent year 03
20.12.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT01.03.2023
CZ01.03.2023
DK01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
IT01.03.2023
LT01.03.2023
LV01.03.2023
MC01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SI01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
[2024/40]
Former [2024/26]AT01.03.2023
CZ01.03.2023
DK01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
IT01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SI01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
Former [2024/10]AT01.03.2023
CZ01.03.2023
DK01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SI01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
Former [2023/50]AT01.03.2023
CZ01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
Former [2023/49]AT01.03.2023
CZ01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
PT03.07.2023
Former [2023/48]AT01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RS01.03.2023
SE01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
PT03.07.2023
Former [2023/46]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RS01.03.2023
SE01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
PT03.07.2023
Former [2023/38]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RS01.03.2023
SE01.03.2023
NO01.06.2023
GR02.06.2023
Former [2023/37]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
RS01.03.2023
SE01.03.2023
NO01.06.2023
GR02.06.2023
Former [2023/36]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
RS01.03.2023
SE01.03.2023
NO01.06.2023
Former [2023/35]ES01.03.2023
HR01.03.2023
LT01.03.2023
RS01.03.2023
NO01.06.2023
Former [2023/34]ES01.03.2023
LT01.03.2023
RS01.03.2023
Former [2023/33]ES01.03.2023
LT01.03.2023
Documents cited:Search[A]EP1610036  (ROLLS ROYCE PLC [GB]) [A] 1-9 * paragraphs [0015] , [0016] , [0019]; figures 1,2 *;
 [A]US2010140019  (IMAI HIDEYUKI [JP], et al) [A] 1-9* paragraph [0042]; figure 6 *;
 [A]US2017146112  (ANGLIN CHRISTOPHER T [US], et al) [A] 1-9 * paragraph [0052]; figure 4 *;
 [A]EP3346099  (UNITED TECHNOLOGIES CORP [US]) [A] 1-9 * column 5, lines 15-18 * * paragraph [0032]; figures 4,5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.