EP3686143 - ELEVATOR CALL REGISTRATION WHEN A CAR IS FULL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.10.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 04.11.2022 | ||
Former | Grant of patent is intended Status updated on 28.08.2022 | ||
Former | Examination is in progress Status updated on 27.08.2021 | ||
Former | Request for examination was made Status updated on 05.02.2021 | ||
Former | The application has been published Status updated on 26.06.2020 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Otis Elevator Company One Carrier Place Farmington, Connecticut 06032 / US | [2020/31] | Inventor(s) | 01 /
SUDI, Sandeep 5 Farm Springs Farmington, CT Connecticut 06032 / US | 02 /
SCOVILLE, Bradley 5 Farm Springs Farmington, CT Connecticut 06032 / US | [2020/31] | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [2020/31] | Application number, filing date | 19219272.2 | 23.12.2019 | [2020/31] | Priority number, date | US201916258836 | 28.01.2019 Original published format: US201916258836 | [2020/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3686143 | Date: | 29.07.2020 | Language: | EN | [2020/31] | Type: | B1 Patent specification | No.: | EP3686143 | Date: | 07.12.2022 | Language: | EN | [2022/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.06.2020 | Classification | IPC: | B66B1/24 | [2020/31] | CPC: |
B66B1/2458 (EP,US);
B66B1/06 (CN);
B66B1/3423 (CN);
B66B1/3446 (CN);
B66B1/3476 (US);
B66B1/46 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/10] |
Former [2020/31] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | AUFZUGSRUFREGISTRIERUNG BEI VOLLER KABINE | [2020/31] | English: | ELEVATOR CALL REGISTRATION WHEN A CAR IS FULL | [2020/31] | French: | ENREGISTREMENT D'APPELS D'ASCENSEUR LORSQU'UNE CABINE EST PLEINE | [2020/31] | Examination procedure | 29.01.2021 | Amendment by applicant (claims and/or description) | 29.01.2021 | Examination requested [2021/10] | 29.01.2021 | Date on which the examining division has become responsible | 31.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 10.01.2022 | Reply to a communication from the examining division | 29.08.2022 | Communication of intention to grant the patent | 01.11.2022 | Fee for grant paid | 01.11.2022 | Fee for publishing/printing paid | 01.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 08.09.2023 | No opposition filed within time limit [2023/46] | Fees paid | Renewal fee | 16.12.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.12.2019 | AL | 07.12.2022 | AT | 07.12.2022 | CY | 07.12.2022 | CZ | 07.12.2022 | DK | 07.12.2022 | EE | 07.12.2022 | ES | 07.12.2022 | FI | 07.12.2022 | HR | 07.12.2022 | IT | 07.12.2022 | LT | 07.12.2022 | LV | 07.12.2022 | MC | 07.12.2022 | MK | 07.12.2022 | NL | 07.12.2022 | PL | 07.12.2022 | RO | 07.12.2022 | RS | 07.12.2022 | SE | 07.12.2022 | SI | 07.12.2022 | SK | 07.12.2022 | SM | 07.12.2022 | IE | 23.12.2022 | LU | 23.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | LI | 31.12.2022 | NO | 07.03.2023 | GR | 08.03.2023 | IS | 07.04.2023 | PT | 10.04.2023 | [2024/27] |
Former [2024/26] | HU | 23.12.2019 | |
AL | 07.12.2022 | ||
AT | 07.12.2022 | ||
CY | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
IT | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2024/21] | HU | 23.12.2019 | |
AL | 07.12.2022 | ||
AT | 07.12.2022 | ||
CY | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2024/18] | HU | 23.12.2019 | |
AL | 07.12.2022 | ||
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/51] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/49] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/48] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
IE | 23.12.2022 | ||
LU | 23.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/47] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
LU | 23.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/46] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
LU | 23.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/44] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
LU | 23.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/39] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
LU | 23.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/38] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
LU | 23.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/37] | AL | 07.12.2022 | |
AT | 07.12.2022 | ||
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/35] | AT | 07.12.2022 | |
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/34] | EE | 07.12.2022 | |
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/33] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
Former [2023/29] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
NL | 07.12.2022 | ||
PL | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
Former [2023/25] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
Former [2023/23] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
SE | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
Former [2023/22] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
LT | 07.12.2022 | ||
SE | 07.12.2022 | ||
NO | 07.03.2023 | ||
Former [2023/20] | LT | 07.12.2022 | |
NO | 07.03.2023 | Documents cited: | Search | [X]JPH0597333 (TOSHIBA CORP) [X] 1-3,9-11* paragraphs [0028] , [0030]; figure 5 *; | [XA]US2019016557 (BALDI EMILY [US]) [X] 1-3,8-11,15 * paragraphs [0014] , [0015] , [0031] , [0032] , [0056] , [0059]; figures 1-4 * [A] 4-7,12-14 |