blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3817454

EP3817454 - SWITCHING A SIDELINK FROM A SOURCE CELL TO A TARGET CELL USING A FALLBACK LINK [Right-click to bookmark this link]
StatusGrant of patent is intended
Status updated on  28.05.2024
Database last updated on 28.06.2024
FormerExamination is in progress
Status updated on  23.12.2022
FormerRequest for examination was made
Status updated on  13.08.2021
FormerThe application has been published
Status updated on  03.04.2021
Most recent event   Tooltip28.05.2024New entry: Communication of intention to grant a patent 
Applicant(s)For:FR 
Mitsubishi Electric R&D Centre Europe B.V.
Capronilaan 46
1119 NS Schiphol Rijk Amsterdam / NL
For:AL  AT  BE  BG  CH  CY  CZ  DE  DK  EE  ES  FI  GB  GR  HR  HU  IE  IS  IT  LI  LT  LU  LV  MC  MK  MT  NL  NO  PL  PT  RO  RS  SE  SI  SK  SM  TR 
Mitsubishi Electric Corporation
7-3, Marunouchi 2-chome
Chiyoda-ku
Tokyo 100-8310 / JP
[2021/18]
Inventor(s)01 / BONNEVILLE, Hervé
C/ Mitsubishi Electric R&D Centre Europe
1 allée de Beaulieu - CS10806
35708 RENNES Cedex 7 / FR
02 / GRESSET, Nicolas
C/ Mitsubishi Electric R&D Centre Europe
1 allée de Beaulieu - CS10806
35708 RENNES Cedex 7 / FR
03 / KHANFOUCI, Mourad
C/ Mitsubishi Electric R&D Centre Europe
1 allée de Beaulieu - CS10806
35708 RENNES Cedex 7 / FR
04 / CIOCHINA, Cristina
C/ Mitsubishi Electric R&D Centre Europe
1 allée de Beaulieu - CS10806
35708 RENNES Cedex 7 / FR
 [2021/18]
Representative(s)Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
[2021/18]
Application number, filing date19306414.431.10.2019
[2021/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3817454
Date:05.05.2021
Language:EN
[2021/18]
Search report(s)(Supplementary) European search report - dispatched on:EP08.01.2020
ClassificationIPC:H04W76/14, H04W36/00, H04W36/14, H04W36/18, // H04W88/06
[2024/24]
CPC:
H04W76/14 (EP,CN); H04W36/0072 (EP,CN); H04W36/03 (US);
H04W36/0033 (CN); H04W36/00837 (US); H04W36/037 (EP,CN);
H04W36/144 (EP,CN); H04W36/18 (EP,CN); H04W36/32 (US);
H04W4/46 (CN); H04W36/322 (EP,CN); H04W88/06 (EP,CN) (-)
Former IPC [2021/18]H04W36/14, H04W76/14, // H04W88/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/37]
Former [2021/18]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:UMSCHALTUNG EINER SEITENVERBINDUNG VON EINER URSPRUNGSZELLE ZU EINER ZIELZELLE UNTER VERWENDUNG EINER RÜCKFALLVERBINDUNG[2021/18]
English:SWITCHING A SIDELINK FROM A SOURCE CELL TO A TARGET CELL USING A FALLBACK LINK[2021/18]
French:COMMUTATION D'UN LIAISON SECONDAIRE D'UNE CELLULE SOURCE À UNE CELLULE CIBLE À L'AIDE D'UNE LIAISON DE RETOUR[2021/18]
Examination procedure11.08.2021Amendment by applicant (claims and/or description)
11.08.2021Examination requested  [2021/37]
11.08.2021Date on which the examining division has become responsible
22.12.2022Despatch of a communication from the examining division (Time limit: M04)
27.02.2023Reply to a communication from the examining division
29.05.2024Communication of intention to grant the patent
Fees paidRenewal fee
27.09.2021Renewal fee patent year 03
23.09.2022Renewal fee patent year 04
21.09.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[I]WO2018202798  (FRAUNHOFER GES FORSCHUNG [DE]) [I] 1-16 * page 12, line 24 - page 15, line 20 * * page 27, line 4 - line 16 * * page 72, line 17 - page 74, line 8 * * figures 11a,11b,15 *;
 [A]US2019182700  (KIM SOYOUNG [KR]) [A] 1,14,15 * paragraph [0062] - paragraph [0065] ** figure 8 *;
 [A]  - HUAWEI ET AL, "Correction on V2X sidelink communication in TS 36.300", vol. RAN WG2, no. Spokane, USA; 20181012 - 20181016, (20181209), 3GPP DRAFT; 36300_CR1199R2_(REL-15)_R2-1816470_CORRECTION ON V2X SIDELINK COMMUNICATION IN TS 36.300, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN/Docs/RP%2D182678%2Ezip, (20181209), XP051553727 [A] 1-16 *Chapter 23.14.1.1 Support for V2X sidelink communication*
 [A]  - ZTE, "Considerations on mobility enhancements for V2V", vol. RAN WG2, no. Nanjing, China; 20160523 - 20160527, (20160522), 3GPP DRAFT; R2-163820_CONSIDERATIONS ON MOBILITY ENHANCEMENTS FOR V2V, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ;, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20160522), XP051105226 [A] 1,14,15 *Chapter 2.1 PC5 interruption time in handover case*
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.