EP3702557 - COUNTER LOCK FOR AN INACTIVE LEAF OF A DOUBLE DOOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.11.2022 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 10.12.2021 | ||
Former | Grant of patent is intended Status updated on 23.08.2021 | ||
Former | Request for examination was made Status updated on 12.02.2021 | ||
Former | The application has been published Status updated on 31.07.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Talleres de Escoriaza, S.A.U. B. Ventas, 35 20305 Irun / ES | [2020/36] | Inventor(s) | 01 /
OTEGI ODRIOZOLA, Eduardo Jesús c/Mikeletes, 4 - 9ºC 20008 DONOSTIA / ES | 02 /
GOÑI URBIETA, Fernando c/ Beraun 17 - 9ºD 20100 ERRENTERIA / ES | [2020/36] | Representative(s) | Igartua, Ismael Galbaian S. Coop. Garaia Parke Teknologikoa Goiru Kalea 1 20500 Arrasate-Mondragón / ES | [2020/36] | Application number, filing date | 19382148.5 | 28.02.2019 | [2020/36] | Filing language | ES | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3702557 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Type: | B1 Patent specification | No.: | EP3702557 | Date: | 12.01.2022 | Language: | EN | [2022/02] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.08.2019 | Classification | IPC: | E05B65/10, E05C7/04, E05C9/04, // E05B15/00 | [2020/36] | CPC: |
E05C7/04 (EP);
E05B17/2034 (EP);
E05B65/1006 (EP);
E05C9/042 (EP);
E05B15/004 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/11] |
Former [2020/36] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GEGENSCHLOSS FÜR EINEN INAKTIVEN FLÜGEL EINER DOPPELTÜR | [2020/36] | English: | COUNTER LOCK FOR AN INACTIVE LEAF OF A DOUBLE DOOR | [2020/36] | French: | CONTRE-SERRURE POUR BATTANT INACTIF D'UNE DOUBLE PORTE | [2020/36] | Examination procedure | 10.02.2021 | Amendment by applicant (claims and/or description) | 10.02.2021 | Examination requested [2021/11] | 10.02.2021 | Date on which the examining division has become responsible | 24.08.2021 | Communication of intention to grant the patent | 30.11.2021 | Fee for grant paid | 30.11.2021 | Fee for publishing/printing paid | 30.11.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 13.10.2022 | No opposition filed within time limit [2022/51] | Fees paid | Renewal fee | 12.02.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2019 | AL | 12.01.2022 | AT | 12.01.2022 | CY | 12.01.2022 | CZ | 12.01.2022 | DK | 12.01.2022 | EE | 12.01.2022 | FI | 12.01.2022 | HR | 12.01.2022 | IT | 12.01.2022 | LT | 12.01.2022 | LV | 12.01.2022 | MC | 12.01.2022 | MK | 12.01.2022 | MT | 12.01.2022 | NL | 12.01.2022 | PL | 12.01.2022 | RO | 12.01.2022 | RS | 12.01.2022 | SE | 12.01.2022 | SI | 12.01.2022 | SK | 12.01.2022 | SM | 12.01.2022 | BE | 28.02.2022 | CH | 28.02.2022 | IE | 28.02.2022 | LI | 28.02.2022 | LU | 28.02.2022 | FR | 12.03.2022 | BG | 12.04.2022 | NO | 12.04.2022 | GR | 13.04.2022 | IS | 12.05.2022 | PT | 12.05.2022 | DE | 01.09.2022 | [2024/44] |
Former [2024/25] | HU | 28.02.2019 | |
AL | 12.01.2022 | ||
AT | 12.01.2022 | ||
CY | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
IT | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
MK | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SI | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
DE | 01.09.2022 | ||
Former [2024/23] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CY | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
IT | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
MK | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SI | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
DE | 01.09.2022 | ||
Former [2024/20] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CY | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
IT | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SI | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
DE | 01.09.2022 | ||
Former [2023/35] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
IT | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SI | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
DE | 01.09.2022 | ||
Former [2023/10] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SI | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
DE | 01.09.2022 | ||
Former [2023/09] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
CH | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
DE | 01.09.2022 | ||
Former [2023/08] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
IE | 28.02.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
DE | 01.09.2022 | ||
Former [2023/06] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
LU | 28.02.2022 | ||
FR | 12.03.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
Former [2023/01] | AL | 12.01.2022 | |
AT | 12.01.2022 | ||
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
LU | 28.02.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
Former [2022/49] | AT | 12.01.2022 | |
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SK | 12.01.2022 | ||
SM | 12.01.2022 | ||
LU | 28.02.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
Former [2022/48] | AT | 12.01.2022 | |
CZ | 12.01.2022 | ||
DK | 12.01.2022 | ||
EE | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SM | 12.01.2022 | ||
LU | 28.02.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
Former [2022/47] | AT | 12.01.2022 | |
DK | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
MC | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RO | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
SM | 12.01.2022 | ||
LU | 28.02.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
Former [2022/46] | AT | 12.01.2022 | |
DK | 12.01.2022 | ||
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
Former [2022/42] | AT | 12.01.2022 | |
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
IS | 12.05.2022 | ||
PT | 12.05.2022 | ||
Former [2022/39] | AT | 12.01.2022 | |
FI | 12.01.2022 | ||
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
PT | 12.05.2022 | ||
Former [2022/36] | AT | 12.01.2022 | |
HR | 12.01.2022 | ||
LT | 12.01.2022 | ||
LV | 12.01.2022 | ||
NL | 12.01.2022 | ||
PL | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
GR | 13.04.2022 | ||
PT | 12.05.2022 | ||
Former [2022/35] | HR | 12.01.2022 | |
LT | 12.01.2022 | ||
NL | 12.01.2022 | ||
RS | 12.01.2022 | ||
SE | 12.01.2022 | ||
BG | 12.04.2022 | ||
NO | 12.04.2022 | ||
PT | 12.05.2022 | ||
Former [2022/34] | LT | 12.01.2022 | |
NL | 12.01.2022 | ||
NO | 12.04.2022 | ||
PT | 12.05.2022 | ||
Former [2022/33] | LT | 12.01.2022 | |
NL | 12.01.2022 | ||
NO | 12.04.2022 | ||
Former [2022/31] | NL | 12.01.2022 | Documents cited: | Search | [A]US1346670 (PAGE ALBERT A) [A] 1-12 * the whole document *; | [A]GB2286420 (FRED DUNCOMBE LIMITED [GB]) [A] 1-12 * the whole document *; | [A]EP2703583 (ASSA ABLOY SICHERHEITSTECHNIK [DE]) [A] 1-12* the whole document *; | [XAI]EP2754800 (WILH SCHLECHTENDAHL & SÖHNE GMBH & CO KG [DE]) [X] 1 * paragraph [0037] - paragraph [0043]; figures 1-15 * [A] 2-10,12 [I] 11 | by applicant | EP1813742 |