blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3675309

EP3675309 - WIND FARM CONTROL SYSTEM AND ASSOCIATED METHOD [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  28.05.2021
Database last updated on 18.10.2024
FormerRequest for examination was made
Status updated on  01.01.2021
FormerThe application has been published
Status updated on  29.05.2020
Most recent event   Tooltip22.12.2023New entry: Renewal fee paid 
Applicant(s)For all designated states
Nordex Energy Spain, S.A.U.
Polígono Industrial Barasoain Parcela 2
31395 Barasoain (Navarra) / ES
[2020/27]
Inventor(s)01 / GARCÍA SAYÉS, José Miguel
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
02 / BERIAIN GUEMBE, Guillermo
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
03 / GARCÍA BARACE, Alberto
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
04 / GIL GURUCEAGA, Javier
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
05 / ORTIZ IRIGOYEN, Javier Daniel
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
06 / ARLABÁN GABEIRAS, Teresa
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
07 / GONZALEZ MURUA, Alejandro
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
08 / ROYO GARCÍA, Ricardo
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
09 / NUÑEZ POLO, Miguel
NORDEX ENERGY SPAIN, S.A.U.
POLIGONO INDUSTRIAL BARASOAIN PARCELA 2
31395 BARASOAIN (NAVARRA) / ES
 [2020/27]
Representative(s)Pons
Glorieta Rubén Darío 4
28010 Madrid / ES
[N/P]
Former [2020/27]Pons
Glorieta Ruben Dario 4
28010 Madrid / ES
Application number, filing date19383220.131.12.2019
[2020/27]
Priority number, dateEP2018038301031.12.2018         Original published format: EP 18383010
[2020/27]
Filing languageES
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3675309
Date:01.07.2020
Language:EN
[2020/27]
Search report(s)(Supplementary) European search report - dispatched on:EP28.05.2020
ClassificationIPC:H02J3/38, H02J3/50
[2020/27]
CPC:
H02J3/38 (EP); F03D7/0272 (US); F03D7/0284 (US);
F03D7/0288 (US); F03D7/048 (US); F03D9/257 (US);
H02J3/381 (US); H02J3/50 (EP); F03D17/00 (US);
H02J2300/28 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/05]
Former [2020/27]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:WINDFARMSTEUERUNGSSYSTEM UND ZUGEHÖRIGES VERFAHREN[2020/27]
English:WIND FARM CONTROL SYSTEM AND ASSOCIATED METHOD[2020/27]
French:SYSTÈME DE CONTRÔLE D'UNE CENTRALE ÉOLIENNE ET PROCÉDÉ ASSOCIÉ[2020/27]
Examination procedure24.12.2020Amendment by applicant (claims and/or description)
24.12.2020Examination requested  [2021/05]
24.12.2020Date on which the examining division has become responsible
31.05.2021Despatch of a communication from the examining division (Time limit: M06)
09.12.2021Reply to a communication from the examining division
21.03.2022Despatch of a communication from the examining division (Time limit: M06)
30.09.2022Reply to a communication from the examining division
03.03.2023Despatch of a communication from the examining division (Time limit: M06)
13.09.2023Reply to a communication from the examining division
Fees paidRenewal fee
17.12.2021Renewal fee patent year 03
20.12.2022Renewal fee patent year 04
21.12.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]US2010025994  (CARDINAL MARK E [US], et al) [X] 1-18 * paragraphs [0024] - [0032]; figure 3 *;
 [X]EP2256341  (ACCIONA WINDPOWER SA [ES]) [X] 1,17 * paragraphs [0048] - [0059]; figures 5,6 *;
 [X]WO2012016585  (ALSTOM WIND SLU [ES], et al) [X] 1,17* page 13, line 2 - page 16, line 26; figure 2b *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.