EP3750205 - PROCESS FOR MAKING AN ELECTRODE ACTIVE MATERIAL, AND ELECTRODE ACTIVE MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 17.06.2021 | ||
Former | Request for examination was made Status updated on 07.04.2021 | ||
Former | Grant of patent is intended Status updated on 17.01.2021 | ||
Former | Request for examination was made Status updated on 13.11.2020 | ||
Former | The international publication has been made Status updated on 17.08.2019 | ||
Former | unknown Status updated on 15.02.2019 | Most recent event Tooltip | 17.05.2024 | Lapse of the patent in a contracting state New state(s): HU | published on 19.06.2024 [2024/25] | Applicant(s) | For all designated states BASF SE Carl-Bosch-Strasse 38 67056 Ludwigshafen am Rhein / DE | [2020/51] | Inventor(s) | 01 /
SOMMER, Heino Carl-Bosch-Strasse 38 67056 Ludwigshafen / DE | 02 /
AHLF, Maraike Carl-Bosch-Strasse 38 67056 Ludwigshafen / DE | 03 /
HAAG, Jacob 23800 Mercantile Road Beachwood, Ohio 44122 / US | 04 /
VOGELSANG, Regina Carl-Bosch-Strasse 38 67056 Ludwigshafen / DE | 05 /
CETINEL, Fatih Carl-Bosch-Strasse 38 67056 Ludwigshafen / DE | [2020/51] | Representative(s) | BASF IP Association BASF SE GBI-C006 67056 Ludwigshafen / DE | [2020/51] | Application number, filing date | 19702864.0 | 31.01.2019 | [2020/51] | WO2019EP52330 | Priority number, date | EP20180156095 | 09.02.2018 Original published format: EP 18156095 | [2020/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019154702 | Date: | 15.08.2019 | Language: | EN | [2019/33] | Type: | A1 Application with search report | No.: | EP3750205 | Date: | 16.12.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 15.08.2019 takes the place of the publication of the European patent application. | [2020/51] | Type: | B1 Patent specification | No.: | EP3750205 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | International search report - published on: | EP | 15.08.2019 | Classification | IPC: | H01M4/525, H01M10/0525 | [2020/51] | CPC: |
H01M10/0525 (EP,US);
H01M4/366 (KR,US);
H01M4/525 (EP,KR,US);
C01F7/02 (KR);
C01G53/50 (KR,US);
H01M10/052 (KR);
H01M4/505 (KR,US);
H01M4/62 (KR);
H01M4/628 (US);
C01P2002/70 (US);
C01P2004/04 (US);
C01P2004/80 (KR);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES ELEKTRODEN-AKTIVMATERIALS, SOWIE ELEKTRODEN-AKTIVMATERIAL | [2021/03] | English: | PROCESS FOR MAKING AN ELECTRODE ACTIVE MATERIAL, AND ELECTRODE ACTIVE MATERIAL | [2020/51] | French: | LE PROCESSUS POUR RENDRE UNE ÉLECTRODE LA MATIÈRE ACTIVE ET L'ÉLECTRODE LA MATIÈRE ACTIVE | [2021/03] |
Former [2020/51] | VERFAHREN ZUR HERSTELLUNG EINES ELEKTRODENAKTIVMATERIALS UND ELEKTRODENAKTIVMATERIAL | ||
Former [2020/51] | PROCÉDÉ DE FABRICATION D'UN MATÉRIAU ACTIF D'ÉLECTRODE, ET MATÉRIAU ACTIF D'ÉLECTRODE | Entry into regional phase | 09.09.2020 | National basic fee paid | 09.09.2020 | Designation fee(s) paid | 09.09.2020 | Examination fee paid | Examination procedure | 12.07.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 09.09.2020 | Examination requested [2020/51] | 09.09.2020 | Date on which the examining division has become responsible | 18.01.2021 | Communication of intention to grant the patent | 07.04.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 18.06.2021 | Communication of intention to grant the patent | 21.07.2021 | Fee for grant paid | 21.07.2021 | Fee for publishing/printing paid | 21.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Fees paid | Renewal fee | 01.02.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.01.2019 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | NL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | IE | 31.01.2022 | LI | 31.01.2022 | LU | 31.01.2022 | [2024/25] |
Former [2024/23] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
IE | 31.01.2022 | ||
LI | 31.01.2022 | ||
LU | 31.01.2022 | ||
Former [2024/20] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
IE | 31.01.2022 | ||
LI | 31.01.2022 | ||
LU | 31.01.2022 | ||
Former [2023/09] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
IE | 31.01.2022 | ||
LI | 31.01.2022 | ||
LU | 31.01.2022 | ||
Former [2023/03] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
BE | 31.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
LU | 31.01.2022 | ||
Former [2023/01] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
BE | 31.01.2022 | ||
LU | 31.01.2022 | ||
Former [2022/46] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
LU | 31.01.2022 | ||
Former [2022/39] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
RS | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
RS | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Cited in | International search | [XA]KR20180010122 (SAMSUNG SDI CO LTD [KR]) [X] 11-13 * claims 1-15 * * examples 1-16 * * paragraph [0197] - paragraph [0228] * * paragraph [0183] - paragraph [0192] *[A] 1-10; | [XA] - KWANG SOO YOO ET AL, "Surface Modification of Li(Ni0.6Co0.2Mn0.2)O2 Cathode Materials by Nano-Al2O3 to Improve Electrochemical Performance in Lithium-ion Batteries", MATERIALS MDPI AG SWITZERLAND, (201711), vol. 10, no. 11, ISSN 1996-1944, XP002779631 [X] 11-13 * abstract * * page 2, paragraph 3 - page 3, paragraph 3 * * figures 1,4 * [A] 1-10 | by applicant | US8993051 |