blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3749906

EP3749906 - CALCINER OF A CEMENT PRODUCTION SYSTEM, AND METHOD FOR OPERATING A CALCINER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.07.2022
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  30.07.2021
FormerGrant of patent is intended
Status updated on  15.06.2021
FormerRequest for examination was made
Status updated on  13.11.2020
FormerThe international publication has been made
Status updated on  17.08.2019
Formerunknown
Status updated on  19.02.2019
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
thyssenkrupp Industrial Solutions AG
ThyssenKrupp Allee 1
45143 Essen / DE
For all designated states
thyssenkrupp AG
ThyssenKrupp Allee 1
45143 Essen / DE
[2021/10]
Former [2020/51]For all designated states
thyssenkrupp Industrial Solutions AG
ThyssenKrupp Allee 1
45143 Essen / DE
For all designated states
thyssenkrupp AG
Thyssenkrupp Allee 1
45143 Essen / DE
Inventor(s)01 / ADLER, Klaus
Köchlingstr. 20
33378 Rheda-Wiedenbrück / DE
02 / VECKENSTEDT, Ines
Waldenburger Straße 2
33397 Rietberg / DE
03 / LEMKE, Jost
Eschenweg 8
59320 Ennigerloh / DE
04 / STREFFING, Michael
Im Löttenkamp 17
59510 Lippetal / DE
 [2020/51]
Representative(s)thyssenkrupp Intellectual Property GmbH
ThyssenKrupp Allee 1
45143 Essen / DE
[2020/51]
Application number, filing date19703661.901.02.2019
[2020/51]
WO2019EP52462
Priority number, dateDE20181020206309.02.2018         Original published format: DE102018202063
[2020/51]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2019154723
Date:15.08.2019
Language:DE
[2019/33]
Type: A1 Application with search report 
No.:EP3749906
Date:16.12.2020
Language:DE
The application published by WIPO in one of the EPO official languages on 15.08.2019 takes the place of the publication of the European patent application.
[2020/51]
Type: B1 Patent specification 
No.:EP3749906
Date:01.09.2021
Language:DE
[2021/35]
Search report(s)International search report - published on:EP15.08.2019
ClassificationIPC:F27B7/20, F27B7/42, F27D19/00, F27D21/00
[2020/51]
CPC:
F27B7/42 (EP); F27B7/2033 (EP); F27D19/00 (EP);
F27D21/0014 (EP); F27D2019/0018 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/51]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:CALCINATOR EINER ZEMENTHERSTELLUNGSANLAGE UND VERFAHREN ZUM BETREIBEN EINES CALCINATORS[2020/51]
English:CALCINER OF A CEMENT PRODUCTION SYSTEM, AND METHOD FOR OPERATING A CALCINER[2020/51]
French:CALCINATEUR D'UNE INSTALLATION DE FABRICATION DE CIMENT ET PROCÉDÉ POUR L'EXPLOITATION D'UN CALCINATEUR[2020/51]
Entry into regional phase09.09.2020National basic fee paid 
09.09.2020Designation fee(s) paid 
09.09.2020Examination fee paid 
Examination procedure09.09.2020Examination requested  [2020/51]
09.09.2020Date on which the examining division has become responsible
18.02.2021Amendment by applicant (claims and/or description)
16.06.2021Communication of intention to grant the patent
22.07.2021Fee for grant paid
22.07.2021Fee for publishing/printing paid
22.07.2021Receipt of the translation of the claim(s)
Opposition(s)02.06.2022No opposition filed within time limit [2022/32]
Fees paidRenewal fee
22.02.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.02.2019
AL01.09.2021
CY01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
MK01.09.2021
MT01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE01.02.2022
LU01.02.2022
BE28.02.2022
CH28.02.2022
FR28.02.2022
LI28.02.2022
[2024/44]
Former [2024/25]HU01.02.2019
AL01.09.2021
CY01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
MK01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE01.02.2022
LU01.02.2022
BE28.02.2022
CH28.02.2022
FR28.02.2022
LI28.02.2022
Former [2024/23]AL01.09.2021
CY01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
MK01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE01.02.2022
LU01.02.2022
BE28.02.2022
CH28.02.2022
FR28.02.2022
LI28.02.2022
Former [2024/20]AL01.09.2021
CY01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE01.02.2022
LU01.02.2022
BE28.02.2022
CH28.02.2022
FR28.02.2022
LI28.02.2022
Former [2023/10]AL01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE01.02.2022
LU01.02.2022
BE28.02.2022
CH28.02.2022
FR28.02.2022
LI28.02.2022
Former [2023/09]AL01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
IE01.02.2022
LU01.02.2022
CH28.02.2022
FR28.02.2022
LI28.02.2022
Former [2023/03]AL01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
LU01.02.2022
FR28.02.2022
Former [2022/47]AL01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
LU01.02.2022
Former [2022/44]AL01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
MC01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/36]AL01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
IT01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/29]AL01.09.2021
EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/25]EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
SM01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/24]EE01.09.2021
ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
NL01.09.2021
PL01.09.2021
RO01.09.2021
RS01.09.2021
SE01.09.2021
SK01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
IS01.01.2022
PT03.01.2022
Former [2022/10]ES01.09.2021
FI01.09.2021
HR01.09.2021
LT01.09.2021
LV01.09.2021
PL01.09.2021
RS01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
GR02.12.2021
Former [2022/09]ES01.09.2021
FI01.09.2021
LT01.09.2021
RS01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
Former [2022/08]ES01.09.2021
FI01.09.2021
LT01.09.2021
SE01.09.2021
BG01.12.2021
NO01.12.2021
Former [2022/07]LT01.09.2021
NO01.12.2021
Cited inInternational search[A]DE3433786  (KLOECKNER HUMBOLDT DEUTZ AG [DE]) [A] 1-15 * figures 1,2 *;
 [A]DE102013006237  (KHD HUMBOLDT WEDAG GMBH [DE]) [A] 1-15 * figure 1 ** paragraph [0025] *
by applicantUS1234567
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.