blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3753178

EP3753178 - BANDWIDTH PART SWITCHING AND PHY CONFIGURATION ALIGNMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  26.05.2023
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  17.06.2022
FormerGrant of patent is intended
Status updated on  18.04.2022
FormerExamination is in progress
Status updated on  15.04.2021
FormerRequest for examination was made
Status updated on  20.11.2020
FormerThe international publication has been made
Status updated on  24.08.2019
Formerunknown
Status updated on  11.03.2019
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
164 83 Stockholm / SE
[2020/52]
Inventor(s)01 / ORSINO, Antonino
Kääntökuja 3 C 9
02430 MASALA / FI
02 / YILMAZ, Osman Nuri Can
Puolarkuja 3 D 8
02280 ESPOO / FI
 [2020/52]
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2020/52]
Application number, filing date19707894.215.02.2019
[2020/52]
WO2019SE50136
Priority number, dateUS201862631230P15.02.2018         Original published format: US 201862631230 P
[2020/52]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019160493
Date:22.08.2019
Language:EN
[2019/34]
Type: A1 Application with search report 
No.:EP3753178
Date:23.12.2020
Language:EN
The application published by WIPO in one of the EPO official languages on 22.08.2019 takes the place of the publication of the European patent application.
[2020/52]
Type: B1 Patent specification 
No.:EP3753178
Date:20.07.2022
Language:EN
[2022/29]
Search report(s)International search report - published on:EP22.08.2019
ClassificationIPC:H04L5/00, H04W72/04
[2020/52]
CPC:
H04L5/0094 (EP,RU,US); H04L5/0007 (EP,KR,RU); H04L5/0096 (KR);
H04L1/0026 (US); H04L25/0226 (US); H04L5/0051 (RU,US);
H04L5/0053 (EP,KR,RU); H04L5/0057 (EP); H04W72/04 (RU);
H04W72/0453 (KR); H04W72/23 (KR); H04W80/02 (RU,US);
Y02D30/70 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/52]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:BANDBREITENTEILUMSCHALTUNG UND AUSRICHTUNG DER PHY-KONFIGURATION[2020/52]
English:BANDWIDTH PART SWITCHING AND PHY CONFIGURATION ALIGNMENT[2020/52]
French:CHANGEMENT DE PARTIE DE BANDE PASSANTE ET ALIGNEMENT DE CONFIGURATION PHY[2020/52]
Entry into regional phase18.08.2020National basic fee paid 
18.08.2020Designation fee(s) paid 
18.08.2020Examination fee paid 
Examination procedure09.12.2019Request for preliminary examination filed
International Preliminary Examining Authority: EP
18.08.2020Amendment by applicant (claims and/or description)
18.08.2020Examination requested  [2020/52]
18.08.2020Date on which the examining division has become responsible
14.04.2021Despatch of a communication from the examining division (Time limit: M04)
12.08.2021Reply to a communication from the examining division
19.04.2022Communication of intention to grant the patent
13.06.2022Fee for grant paid
13.06.2022Fee for publishing/printing paid
13.06.2022Receipt of the translation of the claim(s)
Opposition(s)21.04.2023No opposition filed within time limit [2023/26]
Fees paidRenewal fee
25.02.2021Renewal fee patent year 03
25.02.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
IT20.07.2022
LT20.07.2022
LV20.07.2022
MC20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SI20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
IE15.02.2023
LU15.02.2023
BE28.02.2023
CH28.02.2023
FR28.02.2023
LI28.02.2023
[2024/26]
Former [2024/11]AL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
MC20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SI20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
IE15.02.2023
LU15.02.2023
BE28.02.2023
CH28.02.2023
FR28.02.2023
LI28.02.2023
Former [2024/08]AL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
MC20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SI20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
IE15.02.2023
LU15.02.2023
CH28.02.2023
LI28.02.2023
Former [2023/49]AL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
MC20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SI20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
LU15.02.2023
CH28.02.2023
LI28.02.2023
Former [2023/48]AL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
MC20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SI20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
CH28.02.2023
LI28.02.2023
Former [2023/44]AL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
MC20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SI20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/37]AL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SI20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/29]AL20.07.2022
AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/23]AT20.07.2022
CZ20.07.2022
DK20.07.2022
EE20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SK20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/22]AT20.07.2022
CZ20.07.2022
DK20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RO20.07.2022
RS20.07.2022
SE20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/21]DK20.07.2022
ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RS20.07.2022
SE20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/20]ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RS20.07.2022
SE20.07.2022
SM20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/12]ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RS20.07.2022
SE20.07.2022
NO20.10.2022
GR21.10.2022
IS20.11.2022
PT21.11.2022
Former [2023/11]ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
PL20.07.2022
RS20.07.2022
SE20.07.2022
NO20.10.2022
GR21.10.2022
PT21.11.2022
Former [2023/10]ES20.07.2022
FI20.07.2022
HR20.07.2022
LT20.07.2022
LV20.07.2022
RS20.07.2022
SE20.07.2022
NO20.10.2022
GR21.10.2022
PT21.11.2022
Former [2023/09]ES20.07.2022
FI20.07.2022
LT20.07.2022
LV20.07.2022
RS20.07.2022
SE20.07.2022
NO20.10.2022
PT21.11.2022
Former [2023/08]ES20.07.2022
FI20.07.2022
LT20.07.2022
RS20.07.2022
SE20.07.2022
NO20.10.2022
Cited inInternational search[XI]  - NEC, "Clarifications on BWP set configuration", vol. RAN WG2, no. Reno, USA; 20171127 - 20171201, (20171117), 3GPP DRAFT; R2-1713729_BWP SET, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F100/Docs/, (20171117), XP051372387 [X] 1,2,4,15,18,19,21,32,35,37,38 * section 2.1;; figures 1,2 * [I] 3,9,20,26
 [XI]  - INTERDIGITAL ET AL, "Details of BWP switching operation", vol. RAN WG1, no. Vancouver, Canada; 20180122 - 20180126, (20180112), 3GPP DRAFT; R1-1800603 (R15 NR WI AI 7341 DETAILS OF BWP SWITCHING OPERATION), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5FAH/NR%5FAH%5F1801/Docs/, (20180112), XP051384478 [X] 1,2,4,15,18,19,21,32,35,37,38 * section 2.1;; figure 2 * [I] 3,9,20,26
 [X]  - VIVO, "Other aspects on bandwidth Parts", vol. RAN WG1, no. Reno, USA; 20171127 - 20171201, (20171118), 3GPP DRAFT; R1-1719800_BWP_FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F91/Docs/, (20171118), XP051369543 [X] 1,13,14,18,30,31,35,37,38 * section 3.1;; figure 1 *
 [A]  - VIVO, "Remaining issues and text proposals on SRS design", vol. RAN WG1, no. Vancouver, Canada; 20180122 - 20180126, (20180113), 3GPP DRAFT; R1-1800192_REMAINING ISSUES AND TEXT PROPOSALS ON SRS DESIGN, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5FAH/NR%5FAH%5F1801/Docs/, (20180113), XP051384682 [A] 1-38 * section 2.1 *
 [A]  - AT&T, "CSI measurement for dynamic BWP switching", vol. RAN WG1, no. Vancouver, Canada; 20180122 - 20180126, (20180113), 3GPP DRAFT; R1-1800580 CSI MEASUREMENT FOR DYNAMIC BWP SWITCHING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANC, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5FAH/NR%5FAH%5F1801/Docs/, (20180113), XP051384939 [A] 1-38 * section 2 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.