EP3756290 - RECEIVER, TRANSMITTER, METHOD AND SYSTEM FOR RECEIVING AND SENDING A COMBINATION SIGNAL [Right-click to bookmark this link] | |||
Former [2021/01] | RECEIVER, TRANSMITTER, METHOD AND SYSTEM FOR RECEIVING AND TRANSMITTING A COMBINATION SIGNAL | ||
[2022/08] | Status | No opposition filed within time limit Status updated on 02.06.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.06.2022 | ||
Former | Grant of patent is intended Status updated on 07.02.2022 | ||
Former | Request for examination was made Status updated on 27.11.2020 | ||
Former | The international publication has been made Status updated on 31.08.2019 | ||
Former | unknown Status updated on 20.03.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Innovationszentrum für Telekommunikationstechnik GmbH IZT Am Weichselgarten 5 91058 Erlangen / DE | [2021/01] | Inventor(s) | 01 /
HUBER, Johannes Waldstraße 1c 91094 Langensendelbach / DE | [2021/01] | Representative(s) | Burger, Markus, et al Schoppe, Zimmermann, Stöckeler Zinkler, Schenk & Partner mbB Patentanwälte Radlkoferstraße 2 81373 München / DE | [2021/01] | Application number, filing date | 19709635.7 | 21.02.2019 | [2021/01] | WO2019EP54356 | Priority number, date | DE201810202647 | 21.02.2018 Original published format: DE102018202647 | [2021/01] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2019162398 | Date: | 29.08.2019 | Language: | DE | [2019/35] | Type: | A2 Application without search report | No.: | EP3756290 | Date: | 30.12.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 29.08.2019 takes the place of the publication of the European patent application. | [2020/53] | Type: | B1 Patent specification | No.: | EP3756290 | Date: | 27.07.2022 | Language: | DE | [2022/30] | Search report(s) | International search report - published on: | EP | 14.11.2019 | Classification | IPC: | H04J11/00, H04B1/10, H04L25/03, H04L27/38, H04B1/12 | [2021/01] | CPC: |
H04J11/004 (EP,IL);
H04L25/03057 (EP,IL);
H04L25/0328 (EP,IL);
H04L27/389 (EP,IL)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | EMPFÄNGER, SENDER, VERFAHREN UND SYSTEM ZUM EMPFANGEN UND SENDEN EINES KOMBINATIONSSIGNALS | [2021/01] | English: | RECEIVER, TRANSMITTER, METHOD AND SYSTEM FOR RECEIVING AND SENDING A COMBINATION SIGNAL | [2022/08] | French: | RÉCEPTEUR, ÉMETTEUR, PROCÉDÉ ET SYSTÈME DE RÉCEPTION ET D'ENVOI D'UN SIGNAL DE COMBINAISON | [2022/08] |
Former [2021/01] | RECEIVER, TRANSMITTER, METHOD AND SYSTEM FOR RECEIVING AND TRANSMITTING A COMBINATION SIGNAL | ||
Former [2021/01] | RÉCEPTEUR, ÉMETTEUR, PROCÉDÉ ET SYSTÈME POUR RECEVOIR ET ÉMETTRE UN SIGNAL COMBINÉ | Entry into regional phase | 14.09.2020 | National basic fee paid | 14.09.2020 | Designation fee(s) paid | 14.09.2020 | Examination fee paid | Examination procedure | 14.09.2020 | Examination requested [2020/53] | 14.09.2020 | Date on which the examining division has become responsible | 09.04.2021 | Amendment by applicant (claims and/or description) | 08.02.2022 | Communication of intention to grant the patent | 20.06.2022 | Fee for grant paid | 20.06.2022 | Fee for publishing/printing paid | 20.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 02.05.2023 | No opposition filed within time limit [2023/27] | Fees paid | Renewal fee | 02.02.2021 | Renewal fee patent year 03 | 22.02.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 27.07.2022 | CZ | 27.07.2022 | DK | 27.07.2022 | EE | 27.07.2022 | ES | 27.07.2022 | FI | 27.07.2022 | HR | 27.07.2022 | IT | 27.07.2022 | LT | 27.07.2022 | LV | 27.07.2022 | MC | 27.07.2022 | NL | 27.07.2022 | PL | 27.07.2022 | RO | 27.07.2022 | RS | 27.07.2022 | SE | 27.07.2022 | SI | 27.07.2022 | SK | 27.07.2022 | SM | 27.07.2022 | NO | 27.10.2022 | GR | 28.10.2022 | IS | 27.11.2022 | PT | 28.11.2022 | IE | 21.02.2023 | LU | 21.02.2023 | BE | 28.02.2023 | CH | 28.02.2023 | LI | 28.02.2023 | [2024/26] |
Former [2024/12] | AL | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 21.02.2023 | ||
LU | 21.02.2023 | ||
BE | 28.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2024/08] | AL | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
IE | 21.02.2023 | ||
LU | 21.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/49] | AL | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
LU | 21.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/48] | AL | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/44] | AL | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/37] | AL | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/29] | AL | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/23] | CZ | 27.07.2022 | |
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/22] | CZ | 27.07.2022 | |
DK | 27.07.2022 | ||
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/21] | DK | 27.07.2022 | |
ES | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/20] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/12] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/11] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/10] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/09] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/08] | ES | 27.07.2022 | |
FI | 27.07.2022 | ||
LT | 27.07.2022 | ||
NL | 27.07.2022 | ||
RS | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
Former [2023/06] | NL | 27.07.2022 | Cited in | International search | [XAI]US2004170230 (ZIMMERMAN GEORGE A [US], et al) [X] 1,5 * paragraphs [0064] , [0 69]; figures 6, 7 * [A] 7-9[I] 6,10,11,14-16; | [XI]US2009161749 (NANGIA VIJAY [US], et al) [X] 1,3,4,18-21 * figure 2 * * paragraphs [0041] , [0042] , [0044] - [0047] * [I] 2 | by applicant | - "Doubletalk carrier-in-carrier bandwidth compression", Comtech EF Data, (20160725), URL: http://www.comtechefdata.com/technologies/doubletalk | - A. DUEL-HALLEN; C. HEEGARD, "Delayed decision-feedback sequence estimation", IEEE Transactions on Communications, (19890500), vol. 37, doi:doi:10.1109/26.24594, pages 428 - 436, XP000670554 DOI: http://dx.doi.org/10.1109/26.24594 | - "Trelliscodierung: Grundlagen und Anwendungen in der digitalen Übertragungstechnik", J. HUBER, Nachrichtentechnik, Springer-Verlag, (19920000), vol. 21 | - F. JELINEK; L. BAHL; J. COCKE; J. RAVIV, "Optimal decoding of linear codes for minimizing symbol error rate", IEEE Transactions on Information Theory, (19740000), vol. 20, pages 284 - 287 | - STUART P. LLOYD, "Least Squares Quantization in PCM", IEEE Transactions on Information Theory, (19820300), vol. 28, no. 2, pages 129 - 137 | - A. J. VITERBI, "Error bounds for convolutional codes and an asymptotically optimum decoding algorithm", IEEE Transactions on Information Theory, (19670000), vol. 13, doi:doi:10.1109/TIT.1967.1054010, pages 260 - 269, XP011384908 DOI: http://dx.doi.org/10.1109/TIT.1967.1054010 |