EP3774619 - TROLLEY FOR ROLLS OF MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.11.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 02.12.2022 | ||
Former | Grant of patent is intended Status updated on 14.09.2022 | ||
Former | Request for examination was made Status updated on 15.01.2021 | ||
Former | The international publication has been made Status updated on 19.10.2019 | ||
Former | unknown Status updated on 22.03.2019 | Most recent event Tooltip | 16.02.2024 | Lapse of the patent in a contracting state New state(s): BE, SI | published on 20.03.2024 [2024/12] | Applicant(s) | For all designated states BHS Intralogistics GmbH Rosenhofer Straße 11 93073 Neutraubling / DE | [2022/48] |
Former [2021/07] | For all designated states BHS Intralogistics GmbH Germanenstraße 2 93098 Mintraching / DE | Inventor(s) | 01 /
RUHLAND, Martin Riesengebirgstrasse 8 B 93057 Regensburg - Sallern-Gallingkofen / DE | 02 /
RUHLAND, Karl Kirchsteig 18 92536 Pfreimd / DE | [2021/07] | Representative(s) | Rau, Schneck & Hübner Patentanwälte Rechtsanwälte PartGmbB Königstraße 2 90402 Nürnberg / DE | [2021/07] | Application number, filing date | 19709934.4 | 08.03.2019 | [2021/07] | WO2019EP55899 | Priority number, date | DE201810205290 | 09.04.2018 Original published format: DE102018205290 | [2021/07] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019197089 | Date: | 17.10.2019 | Language: | DE | [2019/42] | Type: | A1 Application with search report | No.: | EP3774619 | Date: | 17.02.2021 | Language: | DE | The application published by WIPO in one of the EPO official languages on 17.10.2019 takes the place of the publication of the European patent application. | [2021/07] | Type: | B1 Patent specification | No.: | EP3774619 | Date: | 04.01.2023 | Language: | DE | [2023/01] | Search report(s) | International search report - published on: | EP | 17.10.2019 | Classification | IPC: | B65H19/30, B65G1/04 | [2021/07] | CPC: |
B65H19/30 (EP);
B60P3/035 (US);
B60L50/60 (US);
B65G1/04 (EP);
G05D1/021 (US);
G05D1/0088 (US);
Y02T10/70 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | MATERIALROLLEN-TRANSPORTWAGEN | [2021/07] | English: | TROLLEY FOR ROLLS OF MATERIAL | [2021/07] | French: | CHARIOT DE TRANSPORT DE ROULEAUX DE MATÉRIAU | [2021/07] | Entry into regional phase | 22.09.2020 | National basic fee paid | 22.09.2020 | Designation fee(s) paid | 22.09.2020 | Examination fee paid | Examination procedure | 22.09.2020 | Examination requested [2021/07] | 22.09.2020 | Date on which the examining division has become responsible | 21.04.2021 | Amendment by applicant (claims and/or description) | 15.09.2022 | Communication of intention to grant the patent | 24.11.2022 | Fee for grant paid | 24.11.2022 | Fee for publishing/printing paid | 24.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 05.10.2023 | No opposition filed within time limit [2023/50] | Fees paid | Renewal fee | 25.03.2021 | Renewal fee patent year 03 | 08.03.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 04.01.2023 | DK | 04.01.2023 | EE | 04.01.2023 | ES | 04.01.2023 | FI | 04.01.2023 | HR | 04.01.2023 | LT | 04.01.2023 | LV | 04.01.2023 | MC | 04.01.2023 | NL | 04.01.2023 | PL | 04.01.2023 | RO | 04.01.2023 | RS | 04.01.2023 | SE | 04.01.2023 | SI | 04.01.2023 | SK | 04.01.2023 | SM | 04.01.2023 | IE | 08.03.2023 | LU | 08.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | NO | 04.04.2023 | GR | 05.04.2023 | IS | 04.05.2023 | PT | 04.05.2023 | [2024/11] |
Former [2024/09] | CZ | 04.01.2023 | |
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
IE | 08.03.2023 | ||
LU | 08.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/08] | CZ | 04.01.2023 | |
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
IE | 08.03.2023 | ||
LU | 08.03.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2024/02] | CZ | 04.01.2023 | |
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
LU | 08.03.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/50] | CZ | 04.01.2023 | |
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SK | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/49] | CZ | 04.01.2023 | |
DK | 04.01.2023 | ||
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RO | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/48] | DK | 04.01.2023 | |
EE | 04.01.2023 | ||
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
MC | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/46] | DK | 04.01.2023 | |
ES | 04.01.2023 | ||
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
SM | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/39] | ES | 04.01.2023 | |
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
IS | 04.05.2023 | ||
PT | 04.05.2023 | ||
Former [2023/38] | ES | 04.01.2023 | |
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
PL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/37] | ES | 04.01.2023 | |
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
GR | 05.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/36] | ES | 04.01.2023 | |
FI | 04.01.2023 | ||
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
LV | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
SE | 04.01.2023 | ||
NO | 04.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/35] | ES | 04.01.2023 | |
HR | 04.01.2023 | ||
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
NO | 04.04.2023 | ||
PT | 04.05.2023 | ||
Former [2023/34] | ES | 04.01.2023 | |
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
RS | 04.01.2023 | ||
PT | 04.05.2023 | ||
Former [2023/33] | ES | 04.01.2023 | |
LT | 04.01.2023 | ||
NL | 04.01.2023 | ||
Former [2023/31] | NL | 04.01.2023 | Cited in | International search | [Y]DE1940426 (VOEST AG) [Y] 5 * page 5, line 10 - line 16 *; | [XAYI]JPS613211 (HITACHI KIDEN KOGYO KK) [X] 1,11,15 * the whole document * [A] 4 [Y] 3,5 [I] 2,6-10,12,13,16-19; | [A]US5451133 (SALSBURG FREDRIC [US], et al) [A] 1* the whole document *; | [Y]US6264417 (SALSBURG FREDRIC S [US]) [Y] 3 * the whole document * | by applicant | DE3731488 | DE102016218106 |