blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3769560

EP3769560 - QOS SUPPORT IN WIRELESS BACKHAUL NETWORKS USING CELLULAR RADIO-ACCESS TECHNOLOGIES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.02.2024
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  10.03.2023
FormerGrant of patent is intended
Status updated on  15.11.2022
FormerRequest for examination was made
Status updated on  25.12.2020
FormerThe international publication has been made
Status updated on  28.09.2019
Formerunknown
Status updated on  22.03.2019
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, CA 92121-1714 / US
[2021/04]
Inventor(s)01 / HAMPEL, Karl Georg
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
02 / CHENG, Hong
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
03 / LI, Junyi
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
04 / ABEDINI, Navid
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
05 / ISLAM, Muhammad Nazmul
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
06 / LUO, Jianghong
QUALCOMM Incorporated
5775 Morehouse Drive
San Diego, California 92121-1714 / US
 [2021/04]
Representative(s)Bardehle Pagenberg Partnerschaft mbB Patentanwälte Rechtsanwälte
Prinzregentenplatz 7
81675 München / DE
[2021/04]
Application number, filing date19710515.813.02.2019
[2021/04]
WO2019US17865
Priority number, dateUS201862645095P19.03.2018         Original published format: US 201862645095 P
US20191627361012.02.2019         Original published format: US201916273610
[2021/04]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019182694
Date:26.09.2019
Language:EN
[2019/39]
Type: A1 Application with search report 
No.:EP3769560
Date:27.01.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 26.09.2019 takes the place of the publication of the European patent application.
[2021/04]
Type: B1 Patent specification 
No.:EP3769560
Date:12.04.2023
Language:EN
[2023/15]
Search report(s)International search report - published on:EP26.09.2019
ClassificationIPC:H04B7/155, H04W28/02, H04W40/22, H04W28/24, H04W28/08
[2022/48]
CPC:
H04W28/24 (EP,KR,US); H04W28/0268 (EP,KR,US); H04B7/15542 (EP,KR);
H04W28/0252 (EP,KR,US); H04W28/0263 (EP,US); H04W40/22 (EP,KR,US);
H04W72/56 (US); H04W76/11 (US); H04W76/12 (US);
H04W84/047 (KR); H04W88/14 (US); H04W88/18 (US);
Y02D30/70 (EP) (-)
Former IPC [2021/04]H04W28/24, H04W28/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/04]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:QOS-UNTERSTÜTZUNG IN DRAHTLOSEN BACKHAUL-NETZEN UNTER VERWENDUNG VON MOBILFUNKZUGANGSTECHNOLOGIEN[2021/04]
English:QOS SUPPORT IN WIRELESS BACKHAUL NETWORKS USING CELLULAR RADIO-ACCESS TECHNOLOGIES[2021/04]
French:PRISE EN CHARGE DE QOS DANS DES RÉSEAUX DE RACCORDEMENT SANS FIL À L'AIDE DE TECHNOLOGIES D'ACCÈS RADIO CELLULAIRE[2021/04]
Entry into regional phase14.10.2020National basic fee paid 
14.10.2020Designation fee(s) paid 
14.10.2020Examination fee paid 
Examination procedure14.10.2020Examination requested  [2021/04]
14.10.2020Date on which the examining division has become responsible
28.04.2021Amendment by applicant (claims and/or description)
16.11.2022Communication of intention to grant the patent
28.02.2023Fee for grant paid
28.02.2023Fee for publishing/printing paid
28.02.2023Receipt of the translation of the claim(s)
Opposition(s)15.01.2024No opposition filed within time limit [2024/12]
Fees paidRenewal fee
14.10.2020Renewal fee patent year 03
09.02.2022Renewal fee patent year 04
09.02.2023Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL12.04.2023
AT12.04.2023
CZ12.04.2023
DK12.04.2023
EE12.04.2023
ES12.04.2023
FI12.04.2023
HR12.04.2023
IT12.04.2023
LT12.04.2023
LV12.04.2023
NL12.04.2023
PL12.04.2023
RO12.04.2023
RS12.04.2023
SE12.04.2023
SI12.04.2023
SK12.04.2023
SM12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
[2024/26]
Former [2024/25]AL12.04.2023
AT12.04.2023
CZ12.04.2023
DK12.04.2023
EE12.04.2023
ES12.04.2023
FI12.04.2023
HR12.04.2023
LT12.04.2023
LV12.04.2023
NL12.04.2023
PL12.04.2023
RO12.04.2023
RS12.04.2023
SE12.04.2023
SI12.04.2023
SK12.04.2023
SM12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
Former [2024/10]AL12.04.2023
AT12.04.2023
CZ12.04.2023
DK12.04.2023
EE12.04.2023
ES12.04.2023
FI12.04.2023
HR12.04.2023
LT12.04.2023
LV12.04.2023
NL12.04.2023
PL12.04.2023
RO12.04.2023
RS12.04.2023
SE12.04.2023
SK12.04.2023
SM12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
Former [2024/08]AL12.04.2023
AT12.04.2023
ES12.04.2023
FI12.04.2023
HR12.04.2023
LT12.04.2023
LV12.04.2023
NL12.04.2023
PL12.04.2023
RS12.04.2023
SE12.04.2023
SK12.04.2023
SM12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
Former [2024/03]AL12.04.2023
AT12.04.2023
ES12.04.2023
FI12.04.2023
HR12.04.2023
LT12.04.2023
LV12.04.2023
NL12.04.2023
PL12.04.2023
RS12.04.2023
SE12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
Former [2024/01]AL12.04.2023
AT12.04.2023
ES12.04.2023
HR12.04.2023
LT12.04.2023
LV12.04.2023
NL12.04.2023
PL12.04.2023
RS12.04.2023
SE12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
Former [2023/51]AL12.04.2023
AT12.04.2023
ES12.04.2023
HR12.04.2023
NL12.04.2023
PL12.04.2023
RS12.04.2023
SE12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
Former [2023/50]AL12.04.2023
AT12.04.2023
ES12.04.2023
NL12.04.2023
PL12.04.2023
SE12.04.2023
NO12.07.2023
GR13.07.2023
IS12.08.2023
PT14.08.2023
Former [2023/48]AT12.04.2023
ES12.04.2023
NL12.04.2023
SE12.04.2023
NO12.07.2023
PT14.08.2023
Former [2023/46]ES12.04.2023
NL12.04.2023
PT14.08.2023
Former [2023/43]NL12.04.2023
Cited inInternational search[XY]  - NOKIA ET AL, "Architecture and Protocols: MAC adaptation layer based IAB", vol. RAN WG3, no. Athens, Greece; 20180226 - 20180302, (20180217), 3GPP DRAFT; R3-180993 MAC ADAPT BASED IAB PROTOCOL ARCHITECTURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG3%5FIu/TSGR3%5F99/Docs/, (20180217), XP051401627 [X] 1-5,10,12-16,21,23-26,31-33,38-40 * the whole document * [Y] 6-9,11,17-20,22,27-30,34-37
 [YA]  - QUALCOMM INCORPORATED, "IAB - User-plane Aspects", vol. RAN WG2, no. Vancouver, Canada; 20180122 - 20180126, (20180111), 3GPP DRAFT; R2-1800413 IAB USER PLANE ASPECTS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5FAHs/2018%5F01%5FNR/Docs/, (20180111), XP051385718 [Y] 6,17,27,34 * the whole document * [A] 1-5,7-16,18-26,28-33,35-40
 [YA]  - HUAWEI, "Adaptation layer based L2 relaying and light L2 relaying", vol. RAN WG3, no. Athens, Greece; 20180226 - 20180302, (20180214), 3GPP DRAFT; R3-180814 ADAPTATION LAYER BASED L2 RELAYING AND LIGHT L2 RELAYING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG3%5FIu/TSGR3%5F99/Docs/, (20180214), XP051401227 [Y] 7-9,11,18-20,22,28-30,35-37 * pages 1-4 * [A] 1-6,10,12-17,21,23-27,31-34,38-40
 [A]  - HUAWEI, "Overview on Support of IAB", vol. RAN WG3, no. Athens, Greece; 20180226 - 20180302, (20180214), 3GPP DRAFT; R3-180815 CONSIDERATIONS ON SUPPORT OF IAB, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG3%5FIu/TSGR3%5F99/Docs/, (20180214), XP051401228 [A] 1-40 * pages 2-4 *
 [A]  - HUAWEI ET AL, "Discussion on IAB topologies", vol. RAN WG2, no. Vancouver, Canada; 20170122 - 20170126, (20180112), 3GPP DRAFT; R2-1801133 DISCUSSION ON IAB TOPOLOGIES, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5FAHs/2018%5F01%5FNR/Docs/, (20180112), XP051386604 [A] 1-40 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.