EP3784540 - CONTROL VALVE, ELECTRONICALLY CONTROLLABLE BRAKING SYSTEM, AND METHOD FOR CONTROLLING THE ELECTRONICALLY CONTROLLABLE BRAKING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.08.2023 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 26.08.2022 | ||
Former | Grant of patent is intended Status updated on 12.07.2022 | ||
Former | Request for examination was made Status updated on 29.01.2021 | ||
Former | The international publication has been made Status updated on 01.11.2019 | ||
Former | unknown Status updated on 17.04.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states ZF CV Systems Europe BV Chaussée de la Hulpe 166 1170 Brussels / BE | [2022/08] |
Former [2021/21] | For all designated states ZF CV Systems Hannover GmbH Am Lindener Hafen 21 30453 Hannover / DE | ||
Former [2021/09] | For all designated states WABCO GmbH Am Lindener Hafen 21 30453 Hannover / DE | Inventor(s) | 01 /
BEIER, Peter Treuburger Str. 3 31515 Wunstorf / DE | 02 /
OTREMBA, Robert Meiergarten 10 30952 Ronnenberg / DE | 03 /
VAN THIEL, Julian Nelkenweg 7 30938 Grossburgwedel / DE | [2021/09] | Representative(s) | Rabe, Dirk-Heinrich ZF CV Systems Hannover GmbH Am Lindener Hafen 21 30453 Hannover / DE | [2022/39] |
Former [2021/09] | Rabe, Dirk-Heinrich Wabco GmbH Am Lindener Hafen 21 30453 Hannover / DE | Application number, filing date | 19716103.7 | 29.03.2019 | [2021/09] | WO2019EP58046 | Priority number, date | DE201810110088 | 26.04.2018 Original published format: DE102018110088 | [2021/09] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2019206565 | Date: | 31.10.2019 | Language: | DE | [2019/44] | Type: | A1 Application with search report | No.: | EP3784540 | Date: | 03.03.2021 | Language: | DE | The application published by WIPO in one of the EPO official languages on 31.10.2019 takes the place of the publication of the European patent application. | [2021/09] | Type: | B1 Patent specification | No.: | EP3784540 | Date: | 28.09.2022 | Language: | DE | [2022/39] | Search report(s) | International search report - published on: | EP | 31.10.2019 | Classification | IPC: | B60T15/20, B60T13/68, B60T8/32 | [2021/09] | CPC: |
B60T8/327 (EP);
B60T13/683 (EP,US);
B60T13/36 (US);
B60T13/385 (US);
B60T15/20 (EP);
B60T15/22 (US);
B60T17/221 (US);
B60T8/17 (US);
B60T8/885 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | STEUERVENTIL, ELEKTRONISCH STEUERBARES BREMSSYSTEM SOWIE VERFAHREN ZUM STEUERN DES ELEKTRONISCH STEUERBAREN BREMSSYSTEMS | [2021/09] | English: | CONTROL VALVE, ELECTRONICALLY CONTROLLABLE BRAKING SYSTEM, AND METHOD FOR CONTROLLING THE ELECTRONICALLY CONTROLLABLE BRAKING SYSTEM | [2021/09] | French: | SOUPAPE DE COMMANDE, SYSTÈME DE FREINAGE À COMMANDE ÉLECTRONIQUE ET PROCÉDÉ DE COMMANDE DU SYSTÈME DE FREINAGE À COMMANDE ÉLECTRONIQUE | [2021/09] | Entry into regional phase | 26.11.2020 | National basic fee paid | 26.11.2020 | Designation fee(s) paid | 26.11.2020 | Examination fee paid | Examination procedure | 26.11.2020 | Examination requested [2021/09] | 26.11.2020 | Date on which the examining division has become responsible | 03.06.2021 | Amendment by applicant (claims and/or description) | 13.07.2022 | Communication of intention to grant the patent | 22.08.2022 | Fee for grant paid | 22.08.2022 | Fee for publishing/printing paid | 22.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 29.06.2023 | No opposition filed within time limit [2023/36] | Fees paid | Renewal fee | 31.03.2021 | Renewal fee patent year 03 | 31.03.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 28.09.2022 | CZ | 28.09.2022 | DK | 28.09.2022 | EE | 28.09.2022 | ES | 28.09.2022 | FI | 28.09.2022 | HR | 28.09.2022 | IT | 28.09.2022 | LT | 28.09.2022 | LV | 28.09.2022 | MC | 28.09.2022 | NL | 28.09.2022 | PL | 28.09.2022 | RO | 28.09.2022 | RS | 28.09.2022 | SE | 28.09.2022 | SI | 28.09.2022 | SK | 28.09.2022 | SM | 28.09.2022 | NO | 28.12.2022 | GR | 29.12.2022 | IS | 28.01.2023 | PT | 30.01.2023 | IE | 29.03.2023 | LU | 29.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | [2024/26] |
Former [2024/12] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
IE | 29.03.2023 | ||
LU | 29.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/09] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
IE | 29.03.2023 | ||
LU | 29.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/08] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
IE | 29.03.2023 | ||
LU | 29.03.2023 | ||
Former [2024/02] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
LU | 29.03.2023 | ||
Former [2023/51] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/48] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/34] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/30] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/29] | AL | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/26] | CZ | 28.09.2022 | |
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/23] | CZ | 28.09.2022 | |
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/22] | CZ | 28.09.2022 | |
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/20] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
Former [2023/10] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
Former [2023/09] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | ||
Former [2023/08] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | Cited in | International search | [A]SU610699 (POLTAV AVTOAGREGATNYJ Z [SU]) [A] 1-12 * figure . *; | [XA]EP0131683 (WABCO WESTINGHOUSE FAHRZEUG [DE]) [X] 1-4,6,9-11 * page 13, line 27 - page 18, line 4; figures 3,4 * [A] 13; | [A]WO2015169418 (WABCO GMBH [DE]) [A] 13,17* the whole document * |