blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3785002

EP3785002 - METHOD OF TESTING AN INTEGRITY OF A STRUCTURE SEPARATING A CHAMBER FROM AN ADJACENT ENVIRONMENT, AND RELATED APPARATUS [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  16.06.2023
Database last updated on 19.10.2024
FormerRequest for examination was made
Status updated on  29.01.2021
FormerThe international publication has been made
Status updated on  01.11.2019
Formerunknown
Status updated on  27.05.2019
Most recent event   Tooltip22.04.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Scanwell Technology AS
Lagerveien 23
4033 Stavanger / NO
[2023/44]
Former [2021/09]For all designated states
Scanwell Technology AS
Luramyrveien 51
4313 Sandnes / NO
Inventor(s)01 / KVERNVOLD, Morten
Lyngnesveien 42
4018 STAVANGER / NO
 [2021/09]
Representative(s)Håmsø Patentbyrå AS
P.O. Box 9
4068 Stavanger / NO
[2021/09]
Application number, filing date19724949.326.04.2019
[2021/09]
WO2019NO50095
Priority number, dateNO2018000059226.04.2018         Original published format: NO 20180592
[2021/09]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019209121
Date:31.10.2019
Language:EN
[2019/44]
Type: A1 Application with search report 
No.:EP3785002
Date:03.03.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 31.10.2019 takes the place of the publication of the European patent application.
[2021/09]
Search report(s)International search report - published on:EP31.10.2019
ClassificationIPC:G01M3/28, E21B47/10
[2021/09]
CPC:
G01M3/2815 (EP,NO); E21B47/117 (EP); G01M3/2892 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/09]
TitleGerman:VERFAHREN ZUR PRÜFUNG DER INTEGRITÄT EINER STRUKTUR, DIE EINE KAMMER VON EINER BENACHBARTEN UMGEBUNG TRENNT, UND ZUGEHÖRIGE VORRICHTUNG[2021/09]
English:METHOD OF TESTING AN INTEGRITY OF A STRUCTURE SEPARATING A CHAMBER FROM AN ADJACENT ENVIRONMENT, AND RELATED APPARATUS[2021/09]
French:PROCÉDÉ DE TEST DE L'INTÉGRITÉ D'UNE STRUCTURE SÉPARANT UNE CHAMBRE D'UN ENVIRONNEMENT ADJACENT, ET APPAREIL ASSOCIÉ[2021/09]
Entry into regional phase16.10.2020National basic fee paid 
16.10.2020Designation fee(s) paid 
16.10.2020Examination fee paid 
Examination procedure16.10.2020Amendment by applicant (claims and/or description)
16.10.2020Examination requested  [2021/09]
16.10.2020Date on which the examining division has become responsible
16.06.2023Despatch of a communication from the examining division (Time limit: M04)
31.08.2023Reply to a communication from the examining division
Fees paidRenewal fee
13.04.2021Renewal fee patent year 03
23.03.2022Renewal fee patent year 04
23.03.2023Renewal fee patent year 05
22.04.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[XAI]US2017023435  (MANGAL LARS NICOLAS [FR], et al) [X] 1-14,17,20,21,24,26-41 * figure 7A * * figures 7B-8 * * figure 2 * * figures 7-10 * * paragraph [0050] * * paragraph [0059] * * paragraph [0055] - paragraph [0057] * * paragraph [0010] * * paragraph [0076] * [A] 22,23 [I] 15,16,18,19,25;
 [XAI]WO2017111608  (4SUBSEA AS [NO]) [X] 1-7,9-11,13,17,24,26,32-36,38-40 * figure 3 * * paragraph [0003] * * page 1, line 4 - line 7 * * page 1, line 9 - line 21 * * page 3, line 1 - line 15 * * page 4, line 1 - line 2 * * page 6, line 1 - line 11 * * page 6, line 19 - line 21 * [A] 22,23,27-31,37 [I] 12,14-16,18-21,25,41;
 [A]  - Raj Mrudhul ET AL, "Well Integrity - Christmas Tree Acceptable Leakage Rate and Sustained Casing Pressure", 24th Symposium on Hazards (Hazards 24), Symposium Series 159, (20140509), pages 1 - 13, URL: https://www.icheme.org/media/8920/xxiv-paper-26.pdf, (20190705), XP055602717 [A] 1-41 * abstract *
by applicantWO2010151144
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.