EP3803524 - ROBOTIC WORK TOOL SYSTEM AND METHOD FOR DEFINING A WORKING AREA [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.12.2023 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 30.12.2022 | ||
Former | Grant of patent is intended Status updated on 06.10.2022 | ||
Former | Request for examination was made Status updated on 12.03.2021 | ||
Former | The international publication has been made Status updated on 14.12.2019 | ||
Former | unknown Status updated on 14.06.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Husqvarna AB Drottninggatan 2 561 80 Huskvarna / SE | [2021/15] | Inventor(s) | 01 /
GRUFMAN, Stefan Höjdhoppsvägen 44 564 34 BANKERYD / SE | 02 /
MANNEFRED, Björn Skinnersdal 38 555 92 JÖNKÖPING / SE | 03 /
KALLSTRÖM, Fredrik Postgatan 3 561 91 HUSKVARNA / SE | 04 /
JÄGENSTEDT, Patrik Ljungarpsvägen 17 560 27 TENHULT / SE | 05 /
AGERHALL, Jonas Berghemsvägen 9 562 41 TABERG / SE | 06 /
ASKENMALM, Kent Bondegatan 6 561 34 HUSKVARNA / SE | 07 /
CALÅS, Göran Kyrkogatan 13 571 78 FORSERUM / SE | [2021/15] | Application number, filing date | 19728433.4 | 04.06.2019 | [2021/15] | WO2019EP64481 | Priority number, date | SE20180050686 | 07.06.2018 Original published format: SE 1850686 | [2021/15] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019234020 | Date: | 12.12.2019 | Language: | EN | [2019/50] | Type: | A1 Application with search report | No.: | EP3803524 | Date: | 14.04.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.12.2019 takes the place of the publication of the European patent application. | [2021/15] | Type: | B1 Patent specification | No.: | EP3803524 | Date: | 01.02.2023 | Language: | EN | [2023/05] | Search report(s) | International search report - published on: | EP | 12.12.2019 | Classification | IPC: | G05D1/02 | [2022/40] | CPC: |
G05B19/42 (EP,US);
A01D34/008 (SE,US);
G05D1/0219 (US);
G05D1/0227 (US);
G05D1/0246 (US);
G05D1/0265 (EP);
G05D1/0274 (US);
G05D1/246 (SE);
A01D2101/00 (US);
|
Former IPC [2021/15] | G05B19/42 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/15] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ROBOTERARBEITSWERKZEUGSYSTEM UND VERFAHREN ZUR DEFINITION EINES ARBEITSBEREICHS | [2021/15] | English: | ROBOTIC WORK TOOL SYSTEM AND METHOD FOR DEFINING A WORKING AREA | [2021/15] | French: | SYSTÈME D'OUTIL ROBOTIQUE DE TRAVAIL ET PROCÉDÉ DESTINÉ À DÉFINIR UNE ZONE DE TRAVAIL | [2021/15] | Entry into regional phase | 07.12.2020 | National basic fee paid | 07.12.2020 | Designation fee(s) paid | 07.12.2020 | Examination fee paid | Examination procedure | 07.12.2020 | Examination requested [2021/15] | 07.12.2020 | Date on which the examining division has become responsible | 18.08.2021 | Amendment by applicant (claims and/or description) | 07.10.2022 | Communication of intention to grant the patent | 20.12.2022 | Fee for grant paid | 20.12.2022 | Fee for publishing/printing paid | 20.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.11.2023 | No opposition filed within time limit [2024/02] | Fees paid | Renewal fee | 08.06.2021 | Renewal fee patent year 03 | 07.06.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.02.2023 | CZ | 01.02.2023 | DK | 01.02.2023 | EE | 01.02.2023 | ES | 01.02.2023 | FI | 01.02.2023 | HR | 01.02.2023 | IT | 01.02.2023 | LT | 01.02.2023 | LV | 01.02.2023 | MC | 01.02.2023 | NL | 01.02.2023 | PL | 01.02.2023 | RO | 01.02.2023 | RS | 01.02.2023 | SE | 01.02.2023 | SI | 01.02.2023 | SK | 01.02.2023 | SM | 01.02.2023 | NO | 01.05.2023 | GR | 02.05.2023 | IS | 01.06.2023 | PT | 01.06.2023 | IE | 04.06.2023 | LU | 04.06.2023 | BE | 30.06.2023 | CH | 30.06.2023 | [2024/26] |
Former [2024/25] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SI | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
IE | 04.06.2023 | ||
LU | 04.06.2023 | ||
BE | 30.06.2023 | ||
CH | 30.06.2023 | ||
Former [2024/21] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SI | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
IE | 04.06.2023 | ||
LU | 04.06.2023 | ||
Former [2024/15] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SI | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
LU | 04.06.2023 | ||
Former [2024/11] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SI | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2024/09] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
MC | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/50] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SK | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/49] | AT | 01.02.2023 | |
CZ | 01.02.2023 | ||
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RO | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/48] | AT | 01.02.2023 | |
DK | 01.02.2023 | ||
EE | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/46] | AT | 01.02.2023 | |
DK | 01.02.2023 | ||
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
SM | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/39] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
IS | 01.06.2023 | ||
PT | 01.06.2023 | ||
Former [2023/38] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
PL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/37] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
GR | 02.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/36] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
FI | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
LV | 01.02.2023 | ||
NL | 01.02.2023 | ||
RS | 01.02.2023 | ||
SE | 01.02.2023 | ||
NO | 01.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/35] | AT | 01.02.2023 | |
ES | 01.02.2023 | ||
HR | 01.02.2023 | ||
LT | 01.02.2023 | ||
NL | 01.02.2023 | ||
RS | 01.02.2023 | ||
NO | 01.05.2023 | ||
PT | 01.06.2023 | ||
Former [2023/34] | ES | 01.02.2023 | |
LT | 01.02.2023 | ||
RS | 01.02.2023 | ||
PT | 01.06.2023 | ||
Former [2023/33] | ES | 01.02.2023 | |
LT | 01.02.2023 | Cited in | International search | [X]US4600999 (ITO KATSUMI [JP], et al) [X] 1,9,10 * column 2, line 45 - column 3, line 29 * * column 3, line 60 - column 4, line 7 * * column 2, line 14 - line 16 * * figures 1, 3 *; | [A]US6112143 (ALLEN WILLIAM E [US], et al) [A] 1-17* the whole document *; | [XI]US2017150676 (YAMAUCHI BRIAN [US], et al) [X] 1,2,4-6,9-11,13-15 * paragraph [0029] - paragraph [0035] * * paragraph [0040] * * paragraph [0057] - paragraph [0062] * * figures 1A - 1C, 2A, 2B, 6A - 6F * [I] 3,7,8,12,16,17 |