| EP3810389 - METHOD FOR COMPUTATIONALLY DESIGNING A RE-USABLE TWO-PIECED MOLD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.11.2022 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 03.12.2021 | ||
| Former | Grant of patent is intended Status updated on 04.11.2021 | ||
| Former | Request for examination was made Status updated on 26.03.2021 | ||
| Former | The international publication has been made Status updated on 27.12.2019 | ||
| Former | unknown Status updated on 23.08.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Institute of Science and Technology Austria Am Campus 1 3400 Klosterneuburg / AT | [2021/17] | Inventor(s) | 01 /
BICKEL, Bernd Am Campus 1 3400 Klosterneuburg / AT | 02 /
AUZINGER, Thomas Am Campus 1 3400 Klosterneuburg / AT | 03 /
NAKASHIMA, Kazutaka 7-3-1 Hongo, Bunkyo-ku Tokyo, Tokyo 113--0033 / JP | 04 /
IGARASHI, Takeo 7-3-1 Hongo, Bunkyo-ku 113-0033, Tokyo Tokyo / JP | [2021/17] | Representative(s) | Patentanwaltskanzlei Matschnig & Forsthuber OG Biberstraße 22 Postfach 36 1010 Wien / AT | [2021/17] | Application number, filing date | 19752911.8 | 21.06.2019 | [2021/17] | WO2019AT60205 | Priority number, date | AT20180060090 | 21.06.2018 Original published format: AT 600902018 | [2021/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019241818 | Date: | 26.12.2019 | Language: | EN | [2019/52] | Type: | A1 Application with search report | No.: | EP3810389 | Date: | 28.04.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.12.2019 takes the place of the publication of the European patent application. | [2021/17] | Type: | B1 Patent specification | No.: | EP3810389 | Date: | 05.01.2022 | Language: | EN | [2022/01] | Search report(s) | International search report - published on: | EP | 26.12.2019 | Classification | IPC: | B29C33/38, G06F113/22, G06F30/00 | [2021/46] | CPC: |
B29C33/3835 (EP,US);
G06F30/00 (EP,US);
G06F2113/22 (EP,US)
|
| Former IPC [2021/17] | B29C33/38, G06F17/50 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN FÜR DEN COMPUTERGESTÜTZTEN ENTWURF EINER WIEDERVERWENDBAREN ZWEITEILIGEN FORM | [2021/17] | English: | METHOD FOR COMPUTATIONALLY DESIGNING A RE-USABLE TWO-PIECED MOLD | [2021/17] | French: | PROCÉDÉ DE CONCEPTION INFORMATIQUE D'UN MOULE BIPARTI RÉUTILISABLE | [2021/17] | Entry into regional phase | 02.12.2020 | National basic fee paid | 02.12.2020 | Designation fee(s) paid | 02.12.2020 | Examination fee paid | Examination procedure | 02.12.2020 | Examination requested [2021/17] | 02.12.2020 | Date on which the examining division has become responsible | 05.11.2021 | Communication of intention to grant the patent | 24.11.2021 | Fee for grant paid | 24.11.2021 | Fee for publishing/printing paid | 24.11.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 06.10.2022 | No opposition filed within time limit [2022/50] | Fees paid | Renewal fee | 24.06.2021 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.06.2019 | AL | 05.01.2022 | CY | 05.01.2022 | CZ | 05.01.2022 | DK | 05.01.2022 | EE | 05.01.2022 | ES | 05.01.2022 | FI | 05.01.2022 | HR | 05.01.2022 | LT | 05.01.2022 | LV | 05.01.2022 | MC | 05.01.2022 | MK | 05.01.2022 | MT | 05.01.2022 | NL | 05.01.2022 | PL | 05.01.2022 | RO | 05.01.2022 | RS | 05.01.2022 | SE | 05.01.2022 | SI | 05.01.2022 | SK | 05.01.2022 | SM | 05.01.2022 | TR | 05.01.2022 | BG | 05.04.2022 | NO | 05.04.2022 | GR | 06.04.2022 | IS | 05.05.2022 | IE | 21.06.2022 | LU | 21.06.2022 | BE | 30.06.2022 | [2024/44] |
| Former [2024/29] | HU | 21.06.2019 | |
| AL | 05.01.2022 | ||
| CY | 05.01.2022 | ||
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| MK | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| TR | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| IE | 21.06.2022 | ||
| LU | 21.06.2022 | ||
| BE | 30.06.2022 | ||
| Former [2024/25] | HU | 21.06.2019 | |
| AL | 05.01.2022 | ||
| CY | 05.01.2022 | ||
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| MK | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| IE | 21.06.2022 | ||
| LU | 21.06.2022 | ||
| BE | 30.06.2022 | ||
| Former [2024/23] | AL | 05.01.2022 | |
| CY | 05.01.2022 | ||
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| MK | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| IE | 21.06.2022 | ||
| LU | 21.06.2022 | ||
| BE | 30.06.2022 | ||
| Former [2024/20] | AL | 05.01.2022 | |
| CY | 05.01.2022 | ||
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| IE | 21.06.2022 | ||
| LU | 21.06.2022 | ||
| BE | 30.06.2022 | ||
| Former [2023/26] | AL | 05.01.2022 | |
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| IE | 21.06.2022 | ||
| LU | 21.06.2022 | ||
| BE | 30.06.2022 | ||
| Former [2023/21] | AL | 05.01.2022 | |
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| IE | 21.06.2022 | ||
| LU | 21.06.2022 | ||
| Former [2023/20] | AL | 05.01.2022 | |
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| IE | 21.06.2022 | ||
| Former [2023/10] | AL | 05.01.2022 | |
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SI | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2023/08] | AL | 05.01.2022 | |
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| MC | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2023/01] | AL | 05.01.2022 | |
| CZ | 05.01.2022 | ||
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2022/49] | CZ | 05.01.2022 | |
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SK | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2022/48] | CZ | 05.01.2022 | |
| DK | 05.01.2022 | ||
| EE | 05.01.2022 | ||
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2022/47] | DK | 05.01.2022 | |
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RO | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| SM | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2022/46] | DK | 05.01.2022 | |
| ES | 05.01.2022 | ||
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2022/42] | ES | 05.01.2022 | |
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| IS | 05.05.2022 | ||
| Former [2022/39] | ES | 05.01.2022 | |
| FI | 05.01.2022 | ||
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| Former [2022/36] | ES | 05.01.2022 | |
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| LV | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| PL | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| GR | 06.04.2022 | ||
| Former [2022/35] | ES | 05.01.2022 | |
| HR | 05.01.2022 | ||
| LT | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| RS | 05.01.2022 | ||
| SE | 05.01.2022 | ||
| BG | 05.04.2022 | ||
| NO | 05.04.2022 | ||
| Former [2022/34] | ES | 05.01.2022 | |
| LT | 05.01.2022 | ||
| NL | 05.01.2022 | ||
| NO | 05.04.2022 | ||
| Former [2022/33] | LT | 05.01.2022 | |
| NL | 05.01.2022 | ||
| NO | 05.04.2022 | ||
| Former [2022/31] | NL | 05.01.2022 | Cited in | International search | [AD] EP3301597 (INSTITUTE OF SCIENCE AND TECH AUSTRIA et al.) | by applicant | EP3301597 |