blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3821122

EP3821122 - A WAVE-LOCK MARINE ENERGY CONVERTER [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  03.02.2023
Database last updated on 19.10.2024
FormerRequest for examination was made
Status updated on  16.04.2021
FormerThe international publication has been made
Status updated on  18.01.2020
Formerunknown
Status updated on  23.08.2019
Most recent event   Tooltip03.02.2023Withdrawal of applicationpublished on 08.03.2023  [2023/10]
Applicant(s)For all designated states
WALL, Brian
Glengarriff
Bantry
Co. Cork P75YX84 / IE
[2021/20]
Inventor(s)01 / see applicant
...
 [2021/20]
Application number, filing date19753201.305.07.2019
[2021/20]
WO2019IE00007
Priority number, dateIE2018S00021309.07.2018         Original published format: IE S20180213
[2021/20]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020012453
Date:16.01.2020
Language:EN
[2020/03]
Type: A1 Application with search report 
No.:EP3821122
Date:19.05.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 16.01.2020 takes the place of the publication of the European patent application.
[2021/20]
Search report(s)International search report - published on:EP16.01.2020
ClassificationIPC:F03B13/20, F03B13/18
[2021/20]
CPC:
F03B13/20 (EP); F03B13/187 (EP); F05B2270/18 (EP);
F05B2270/20 (EP); F05B2270/202 (EP); Y02E10/30 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/20]
Validation statesMA08.02.2021
TitleGerman:MEERENERGIEUMWANDLER MIT WELLENSPERRE[2021/20]
English:A WAVE-LOCK MARINE ENERGY CONVERTER[2021/20]
French:CONVERTISSEUR D'ÉNERGIE MARINE À BLOCAGE DES VAGUES[2021/20]
Entry into regional phase08.02.2021National basic fee paid 
08.02.2021Designation fee(s) paid 
08.02.2021Examination fee paid 
Examination procedure08.02.2021Examination requested  [2021/20]
08.02.2021Date on which the examining division has become responsible
23.08.2021Amendment by applicant (claims and/or description)
27.01.2023Application withdrawn by applicant  [2023/10]
Fees paidRenewal fee
08.02.2021Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.07.202204   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]US4076463  (WELCZER MORDECHAI);
 [A]WO9820253  (BERG JOHN L [US]);
 [A]US2011225964  (WELCH JR KENNETH W [US], et al);
 [AD]IE86608  (WALL BRIAN [IE])
by applicantIE86608
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.