| EP3791059 - REVERSIBLE PUMP TURBINE AND GUIDE WHEEL FOR THE REVERSIBLE PUMP TURBINE [Right-click to bookmark this link] | |||
| Former [2021/11] | REVERSIBLE PUMP TURBINE AND GUIDE VANE FOR THE REVERSIBLE PUMP TURBINE | ||
| [2021/49] | Status | No opposition filed within time limit Status updated on 09.12.2022 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 31.12.2021 | ||
| Former | Grant of patent is intended Status updated on 23.11.2021 | ||
| Former | Request for examination was made Status updated on 12.02.2021 | ||
| Former | The international publication has been made Status updated on 24.02.2020 | ||
| Former | unknown Status updated on 27.08.2019 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Andritz AG Stattegger Strasse 18 8045 Graz / AT | [2021/11] | Inventor(s) | 01 /
LENARCIC, Markus Rembrandtstraße 1/26 1020 Wien / AT | [2021/11] | Representative(s) | Tschinder, Thomas Stattegger Straße 18 8045 Graz / AT | [2021/11] | Application number, filing date | 19755568.3 | 12.08.2019 | [2021/11] | WO2019EP71603 | Priority number, date | AT20180050690 | 14.08.2018 Original published format: AT 506902018 | [2021/11] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2020035452 | Date: | 20.02.2020 | Language: | DE | [2020/08] | Type: | A1 Application with search report | No.: | EP3791059 | Date: | 17.03.2021 | Language: | DE | The application published by WIPO in one of the EPO official languages on 20.02.2020 takes the place of the publication of the European patent application. | [2021/11] | Type: | B1 Patent specification | No.: | EP3791059 | Date: | 02.02.2022 | Language: | DE | [2022/05] | Search report(s) | International search report - published on: | EP | 20.02.2020 | Classification | IPC: | F03B3/10, F03B3/18 | [2021/11] | CPC: |
F03B3/183 (EP,AT,US);
F03B3/16 (AT);
F01D5/141 (AT);
F03B3/10 (EP);
F05B2240/12 (US);
F05B2240/304 (US);
Y02E10/20 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/11] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | REVERSIBLE PUMPTURBINE UND LEITRAD FÜR DIE REVERSIBLE PUMPTURBINE | [2021/49] | English: | REVERSIBLE PUMP TURBINE AND GUIDE WHEEL FOR THE REVERSIBLE PUMP TURBINE | [2021/49] | French: | TURBINE-POMPE RÉVERSIBLE ET ROUE DIRECTRICE POUR LA TURBINE-POMPE RÉVERSIBLE | [2021/49] |
| Former [2021/11] | REVERSIBLE PUMPTURBINE UND LEITSCHAUFEL FÜR DIE REVERSIBLE PUMPTURBINE | ||
| Former [2021/11] | REVERSIBLE PUMP TURBINE AND GUIDE VANE FOR THE REVERSIBLE PUMP TURBINE | ||
| Former [2021/11] | TURBINE-POMPE RÉVERSIBLE ET AUBE DIRECTRICE POUR LA TURBINE-POMPE RÉVERSIBLE | Entry into regional phase | 11.12.2020 | National basic fee paid | 11.12.2020 | Designation fee(s) paid | 11.12.2020 | Examination fee paid | Examination procedure | 04.06.2020 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 11.12.2020 | Examination requested [2021/11] | 11.12.2020 | Date on which the examining division has become responsible | 06.07.2021 | Amendment by applicant (claims and/or description) | 24.11.2021 | Communication of intention to grant the patent | 20.12.2021 | Receipt of the translation of the claim(s) | 24.12.2021 | Fee for grant paid | 24.12.2021 | Fee for publishing/printing paid | Opposition(s) | 03.11.2022 | No opposition filed within time limit [2023/02] | Fees paid | Renewal fee | 24.08.2021 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.08.2019 | AL | 02.02.2022 | CY | 02.02.2022 | DK | 02.02.2022 | EE | 02.02.2022 | FI | 02.02.2022 | HR | 02.02.2022 | LT | 02.02.2022 | LV | 02.02.2022 | MC | 02.02.2022 | MK | 02.02.2022 | MT | 02.02.2022 | NL | 02.02.2022 | PL | 02.02.2022 | RO | 02.02.2022 | RS | 02.02.2022 | SE | 02.02.2022 | SK | 02.02.2022 | SM | 02.02.2022 | TR | 02.02.2022 | BG | 02.05.2022 | GR | 03.05.2022 | IS | 02.06.2022 | IE | 12.08.2022 | LU | 12.08.2022 | BE | 31.08.2022 | [2026/05] |
| Former [2024/44] | HU | 12.08.2019 | |
| AL | 02.02.2022 | ||
| CY | 02.02.2022 | ||
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| MK | 02.02.2022 | ||
| MT | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| IE | 12.08.2022 | ||
| LU | 12.08.2022 | ||
| BE | 31.08.2022 | ||
| Former [2024/27] | HU | 12.08.2019 | |
| AL | 02.02.2022 | ||
| CY | 02.02.2022 | ||
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| MK | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| IE | 12.08.2022 | ||
| LU | 12.08.2022 | ||
| BE | 31.08.2022 | ||
| Former [2024/25] | HU | 12.08.2019 | |
| AL | 02.02.2022 | ||
| CY | 02.02.2022 | ||
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| IE | 12.08.2022 | ||
| LU | 12.08.2022 | ||
| BE | 31.08.2022 | ||
| Former [2024/21] | AL | 02.02.2022 | |
| CY | 02.02.2022 | ||
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| IE | 12.08.2022 | ||
| LU | 12.08.2022 | ||
| BE | 31.08.2022 | ||
| Former [2023/42] | AL | 02.02.2022 | |
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| IE | 12.08.2022 | ||
| LU | 12.08.2022 | ||
| BE | 31.08.2022 | ||
| Former [2023/33] | AL | 02.02.2022 | |
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| IE | 12.08.2022 | ||
| LU | 12.08.2022 | ||
| Former [2023/21] | AL | 02.02.2022 | |
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| LU | 12.08.2022 | ||
| Former [2023/16] | AL | 02.02.2022 | |
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| MC | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| Former [2023/01] | AL | 02.02.2022 | |
| DK | 02.02.2022 | ||
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| Former [2022/49] | DK | 02.02.2022 | |
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SK | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| Former [2022/48] | DK | 02.02.2022 | |
| EE | 02.02.2022 | ||
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| Former [2022/47] | DK | 02.02.2022 | |
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RO | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| SM | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| Former [2022/46] | DK | 02.02.2022 | |
| FI | 02.02.2022 | ||
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| Former [2022/42] | FI | 02.02.2022 | |
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| IS | 02.06.2022 | ||
| Former [2022/39] | FI | 02.02.2022 | |
| HR | 02.02.2022 | ||
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| Former [2022/36] | HR | 02.02.2022 | |
| LT | 02.02.2022 | ||
| LV | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| PL | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| GR | 03.05.2022 | ||
| Former [2022/35] | HR | 02.02.2022 | |
| LT | 02.02.2022 | ||
| NL | 02.02.2022 | ||
| RS | 02.02.2022 | ||
| SE | 02.02.2022 | ||
| BG | 02.05.2022 | ||
| Former [2022/34] | LT | 02.02.2022 | |
| NL | 02.02.2022 | ||
| Former [2022/33] | LT | 02.02.2022 | Cited in | International search | [X] JP2003090279 (MITSUBISHI HEAVY IND LTD et al.) | [X] AT405756 (EFG TURBINEN UND KRAFTWERKSANL et al.) [X] 1,2 * paragraphs [0001] , [0013] - [0017] * * figures 1a,1b,4 * | [XYI] FR372975 (FRANCISCO MIRAPEIX et al.) [X] 1-4,6-8,13-15 * page 4, line 51 - page 8, line 49 * * figures 1-4,7,8 *[Y] 9,10 [I] 5,11,12 | [XYI] DE19950227 (VOITH HYDRO GMBH & CO KG et al.) [X] 1,2,6-8 * the whole document *[Y] 9,10 [I] 11,12 | by applicant | DE19950227 |