EP3651534 - METHOD FOR ADJUSTING CONTENTION WINDOW SIZE IN WIRELESS COMMUNICATION SYSTEM AND APPARATUS USING METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 25.06.2021 | ||
Former | Grant of patent is intended Status updated on 18.02.2021 | ||
Former | Request for examination was made Status updated on 10.04.2020 | ||
Former | The international publication has been made Status updated on 07.09.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states LG Electronics Inc. 128 Yeoui-daero Yeongdeungpo-Gu 07336 SEOUL / KR | [2021/30] |
Former [2020/20] | For all designated states LG Electronics Inc. 128 Yeoui-daero Yeongdeungpo-Gu 07336 SEOUL / KR | Inventor(s) | 01 /
MYUNG, Sechang IP Center, LG Electronics Inc. 19, Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | 02 /
KIM, Seonwook IP Center, LG Electronics Inc. 19, Yangjae-daero 11-gil Seocho-gu Seoul 06772 / KR | [2020/20] | Representative(s) | Plasseraud IP 66, rue de la Chaussée d'Antin 75440 Paris Cedex 09 / FR | [2020/20] | Application number, filing date | 19761188.2 | 28.02.2019 | [2020/20] | WO2019KR02442 | Priority number, date | US201862636706P | 28.02.2018 Original published format: US 201862636706 P | KR20180030760 | 16.03.2018 Original published format: KR 20180030760 | US201862669959P | 10.05.2018 Original published format: US 201862669959 P | [2020/20] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019168384 | Date: | 06.09.2019 | Language: | KO | [2019/36] | Type: | A1 Application with search report | No.: | EP3651534 | Date: | 13.05.2020 | Language: | EN | [2020/20] | Type: | B1 Patent specification | No.: | EP3651534 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | International search report - published on: | KR | 06.09.2019 | (Supplementary) European search report - dispatched on: | EP | 25.05.2020 | Classification | IPC: | H04W74/08, H04L1/18 | [2020/26] | CPC: |
H04L1/1887 (EP);
H04W74/004 (KR);
H04L1/1614 (EP);
H04L1/1822 (EP);
H04W74/00 (EP);
H04W74/08 (EP);
H04W74/0875 (KR)
(-)
|
Former IPC [2020/20] | H04W74/00, H04W74/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR EINSTELLUNG DER KONFLIKTFENSTERGRÖSSE IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM UND VORRICHTUNG MIT DEM VERFAHREN | [2020/20] | English: | METHOD FOR ADJUSTING CONTENTION WINDOW SIZE IN WIRELESS COMMUNICATION SYSTEM AND APPARATUS USING METHOD | [2020/20] | French: | PROCÉDÉ PERMETTANT D'AJUSTER UNE TAILLE DE FENÊTRE DE CONTENTION DANS UN SYSTÈME DE COMMUNICATION SANS FIL ET APPAREIL UTILISANT LE PROCÉDÉ | [2020/20] | Entry into regional phase | 03.02.2020 | Translation filed | 03.02.2020 | National basic fee paid | 03.02.2020 | Search fee paid | 03.02.2020 | Designation fee(s) paid | 03.02.2020 | Examination fee paid | Examination procedure | 03.02.2020 | Examination requested [2020/20] | 23.11.2020 | Amendment by applicant (claims and/or description) | 19.02.2021 | Communication of intention to grant the patent | 22.06.2021 | Fee for grant paid | 22.06.2021 | Fee for publishing/printing paid | 22.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 22.02.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.02.2019 | AL | 28.07.2021 | AT | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | IT | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | NL | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | TR | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | BE | 28.02.2022 | CH | 28.02.2022 | FR | 28.02.2022 | IE | 28.02.2022 | LI | 28.02.2022 | LU | 28.02.2022 | [2024/29] |
Former [2024/25] | HU | 28.02.2019 | |
AL | 28.07.2021 | ||
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
MK | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2024/23] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
MK | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2024/20] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2023/10] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2023/09] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
IE | 28.02.2022 | ||
LI | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2023/03] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
FR | 28.02.2022 | ||
LU | 28.02.2022 | ||
Former [2022/47] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
LU | 28.02.2022 | ||
Former [2022/44] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/36] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/29] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/25] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/24] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/21] | AT | 28.07.2021 | |
DK | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/10] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/09] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
PT | 29.11.2021 | ||
Former [2022/08] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
Former [2022/07] | AT | 28.07.2021 | |
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
NO | 28.10.2021 | Documents cited: | Search | [X] - LG ELECTRONICS, "Channel access procedure for autonomous UL access", vol. RAN WG1, no. Reno, USA; 20171127 - 20171201, (20171118), 3GPP DRAFT; R1-1719865 LAA LBT_FINAL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F91/Docs/, (20171118), XP051369579 [X] 1,13-15 * paragraph [02.1] * * figure 2 * | [X] - INTEL CORPORATION, "Summary of email discussion [90b-LTE-21] on AUL channel access", vol. RAN WG1, no. Reno, US; 20171127 - 20171201, (20171118), 3GPP DRAFT; R1-1720029, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F91/Docs/, (20171118), XP051369711 [X] 1,13-15 * page 4 - page 5 * * page 8 * | [A] - SAMSUNG, "Channel access for autonomous UL access", vol. RAN WG1, no. Athens, Greece; 20180226 - 20180302, (20180216), 3GPP DRAFT; R1-1801917 LBT FOR AUL, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F92/Docs/, (20180216), XP051397063 [A] 1-15 * paragraph [0002] * | International search | [A]WO2017030417 (LG ELECTRONICS INC [KR]) [A] 1-15* See paragraphs [416]-[423]; and figure 28. *; | [A] - HUAWEI et al., "Remaining details on AUL channel access", R1-1801375. 3GPP TSG RAN WG1 Meeting #92, Athens. Greece, (20180216), XP051397400 [A] 1-15 * See pages 1-7. * | [A] - ERICSSON, "On AUL channel access", R1-1802533. 3GPP TSG RAN WG1 Meeting #92. Athens. Greece, (20180216), XP051397324 [A] 1-15 * See pages 1-6. * | [A] - QUALCOMM INCORPORATED, "Autonomous UL transmission in NR unlicensed", 3GPP TSG RAN WG1 Meeting #92. R1-1802867, Athens. Greece, (20180217), XP051398280 [A] 1-15 * See pages 1-7. * | [A] - WILUS Inc, "Discussion on channel access for AUL transmission", R1-1802933, 3GPP TSC RAN WG1 Meeting #92, Athens. Greece, (20180217), XP051398316 [A] 1-15 * See pages 1-4. * |