| EP3850641 - METHOD FOR OPERATING A NUCLEAR REACTOR WITH CALCULATION OF THE CTFR ON LINE, CORRESPONDING NUCLEAR REACTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.02.2025 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 15.03.2024 | ||
| Former | Grant of patent is intended Status updated on 28.11.2023 | ||
| Former | Examination is in progress Status updated on 26.01.2023 | ||
| Former | Request for examination was made Status updated on 18.06.2021 | ||
| Former | The international publication has been made Status updated on 21.03.2020 | ||
| Former | unknown Status updated on 17.09.2019 | Most recent event Tooltip | 30.01.2026 | Lapse of the patent in a contracting state New state(s): CY | published on 04.03.2026 [2026/10] | Applicant(s) | For all designated states Framatome 1 place Jean Millier Tour Areva 92400 Courbevoie / FR | [2021/29] | Inventor(s) | 01 /
SEGOND, Mathieu 50 rue Corvisart 75013 Paris / FR | [2023/52] |
| Former [2021/29] | 01 /
SEGOND, Mathieu 50 rue Corvisart 75013 PARIS / FR | Representative(s) | Lavoix 2, place d'Estienne d'Orves 75441 Paris Cedex 09 / FR | [2021/29] | Application number, filing date | 19765509.5 | 12.09.2019 | [2021/29] | WO2019EP74373 | Priority number, date | FR20180058157 | 12.09.2018 Original published format: FR 1858157 | [2021/29] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2020053339 | Date: | 19.03.2020 | Language: | FR | [2020/12] | Type: | A1 Application with search report | No.: | EP3850641 | Date: | 21.07.2021 | Language: | FR | The application published by WIPO in one of the EPO official languages on 19.03.2020 takes the place of the publication of the European patent application. | [2021/29] | Type: | B1 Patent specification | No.: | EP3850641 | Date: | 17.04.2024 | Language: | FR | [2024/16] | Search report(s) | International search report - published on: | EP | 19.03.2020 | Classification | IPC: | G21C9/00, G21D3/00, G06N3/045, G06N3/082, // G21C17/108 | [2023/51] | CPC: |
G21D3/001 (EP,KR,US);
G06N3/045 (EP,KR,US);
G06N3/0464 (EP);
G06N3/082 (EP,KR,US);
G06N3/09 (EP);
G06N3/0985 (EP);
G21C17/108 (EP,KR,US);
G21C9/00 (EP,KR,US);
Y02E30/00 (EP);
Y02E30/30 (EP,KR)
(-)
|
| Former IPC [2021/29] | G21C9/00, G21D3/00, G21C17/00, G06N3/02, G21C17/108 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUM BETRIEB EINES KERNREAKTORS MIT ONLINE-BERECHNUNG DES CTFR, ZUGEHÖRIGER KERNREAKTOR | [2021/29] | English: | METHOD FOR OPERATING A NUCLEAR REACTOR WITH CALCULATION OF THE CTFR ON LINE, CORRESPONDING NUCLEAR REACTOR | [2021/29] | French: | PROCÉDÉ D'EXPLOITATION D'UN RÉACTEUR NUCLÉAIRE AVEC CALCUL DU RFTC EN LIGNE, RÉACTEUR NUCLÉAIRE CORRESPONDANT | [2021/29] | Entry into regional phase | 12.03.2021 | National basic fee paid | 12.03.2021 | Designation fee(s) paid | 12.03.2021 | Examination fee paid | Examination procedure | 12.03.2021 | Examination requested [2021/29] | 12.03.2021 | Date on which the examining division has become responsible | 20.10.2021 | Amendment by applicant (claims and/or description) | 25.01.2023 | Despatch of a communication from the examining division (Time limit: M04) | 21.04.2023 | Reply to a communication from the examining division | 29.11.2023 | Communication of intention to grant the patent | 08.03.2024 | Fee for grant paid | 08.03.2024 | Fee for publishing/printing paid | 08.03.2024 | Receipt of the translation of the claim(s) | Opposition(s) | 20.01.2025 | No opposition filed within time limit [2025/13] | Fees paid | Renewal fee | 30.08.2021 | Renewal fee patent year 03 | 26.08.2022 | Renewal fee patent year 04 | 22.08.2023 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 12.09.2019 | AT | 17.04.2024 | BG | 17.04.2024 | DK | 17.04.2024 | EE | 17.04.2024 | ES | 17.04.2024 | HR | 17.04.2024 | IT | 17.04.2024 | LV | 17.04.2024 | MC | 17.04.2024 | RO | 17.04.2024 | SM | 17.04.2024 | NO | 17.07.2024 | RS | 17.07.2024 | GR | 18.07.2024 | IS | 17.08.2024 | PT | 19.08.2024 | IE | 12.09.2024 | LU | 12.09.2024 | FR | 30.09.2024 | [2026/10] |
| Former [2025/36] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| EE | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| IT | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| MC | 17.04.2024 | ||
| RO | 17.04.2024 | ||
| SM | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| IE | 12.09.2024 | ||
| LU | 12.09.2024 | ||
| FR | 30.09.2024 | ||
| Former [2025/35] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| EE | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| IT | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| MC | 17.04.2024 | ||
| RO | 17.04.2024 | ||
| SM | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| LU | 12.09.2024 | ||
| FR | 30.09.2024 | ||
| Former [2025/26] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| EE | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| IT | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| MC | 17.04.2024 | ||
| RO | 17.04.2024 | ||
| SM | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| LU | 12.09.2024 | ||
| Former [2025/22] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| EE | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| IT | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| MC | 17.04.2024 | ||
| RO | 17.04.2024 | ||
| SM | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2025/11] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| EE | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| IT | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| RO | 17.04.2024 | ||
| SM | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2025/10] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| EE | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| RO | 17.04.2024 | ||
| SM | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2025/09] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| EE | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2025/08] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| DK | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2024/49] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| LV | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| RS | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2024/48] | AT | 17.04.2024 | |
| BG | 17.04.2024 | ||
| ES | 17.04.2024 | ||
| HR | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2024/47] | BG | 17.04.2024 | |
| HR | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| GR | 18.07.2024 | ||
| IS | 17.08.2024 | ||
| PT | 19.08.2024 | ||
| Former [2024/46] | BG | 17.04.2024 | |
| HR | 17.04.2024 | ||
| NO | 17.07.2024 | ||
| IS | 17.08.2024 | Cited in | International search | [Y] US4330367 (MUSICK CHARLES R et al.) [Y] 1-21 * abstract * * column 2, line 23 - column 3, line 49 * * column 11, line 50 - column 19, line 2 * * column 23, line 30 - column 25, line 26 * | [Y] US2016180976 (PARK YOUNG HO et al.) [Y] 1-21 * abstract * | [A] US2010119026 (GAUTIER ANTOINE et al.) [A] 1,21 * abstract * * paragraphs [0036] - [0056] - [0061] - [0066] * | [A] KEE IN W ET AL: "Assessment of core protection and monitoring systems for an advanced reactor SMART", ANNALS OF NUCLEAR ENERGY, PERGAMON PRESS, OXFORD, GB, vol. 29, no. 5, 1 March 2002 (2002-03-01), pages 609 - 621, XP027339864, ISSN: 0306-4549, [retrieved on 20020301] [A] 1,21 * abstract * * sections 1, 2.2, 3.3, 4.2 * |