| EP3830945 - BELT CONVEYOR DEVICE AND METHOD FOR STOPPING A BELT OF A BELT CONVEYOR DEVICE [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 16.05.2025 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 05.08.2022 | ||
| Former | Grant of patent is intended Status updated on 28.04.2022 | ||
| Former | Request for examination was made Status updated on 07.05.2021 | ||
| Former | The international publication has been made Status updated on 05.04.2020 | ||
| Former | unknown Status updated on 08.10.2019 | Most recent event Tooltip | 26.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 28.01.2026 [2026/05] | Applicant(s) | For all designated states Innomotics GmbH Vogelweiherstraße 1-15 90441 Nürnberg / DE | [2025/25] |
| Former [2024/03] | For all designated states Innomotics GmbH Vogelweiherstraße 1-15 90441 Nürnberg / DE | ||
| Former [2021/23] | For all designated states Siemens Aktiengesellschaft Werner-von-Siemens-Straße 1 80333 München / DE | Inventor(s) | 01 /
BECKER, Norbert Gartenstr. 14 91341 Röttenbach / DE | 02 /
HELLMUTH, Torsten Stettiner Str. 34 91058 Erlangen / DE | [2021/23] | Representative(s) | Michalski Hüttermann & Partner Patentanwälte mbB Kaistraße 16A 40221 Düsseldorf / DE | [2025/25] | Application number, filing date | 19778868.0 | 17.09.2019 | [2021/23] | WO2019EP74820 | Priority number, date | EP20180197640 | 28.09.2018 Original published format: EP 18197640 | [2021/23] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2020064422 | Date: | 02.04.2020 | Language: | DE | [2020/14] | Type: | A1 Application with search report | No.: | EP3830945 | Date: | 09.06.2021 | Language: | DE | The application published by WIPO in one of the EPO official languages on 02.04.2020 takes the place of the publication of the European patent application. | [2021/23] | Type: | B1 Patent specification | No.: | EP3830945 | Date: | 07.09.2022 | Language: | DE | [2022/36] | Type: | B2 New European patent specification | No.: | EP3830945 | Date: | 18.06.2025 | Language: | DE | [2025/25] | Search report(s) | International search report - published on: | EP | 02.04.2020 | Classification | IPC: | H02P3/18, H02P29/032, H02P6/24, H02J9/00, H02P29/028, H02P29/024, H02P29/00, // B65G43/00, B65G23/24 | [2022/19] | CPC: |
H02P3/18 (EP);
H02J9/00 (EP);
H02P29/0027 (EP);
H02P29/026 (EP);
H02P29/032 (EP);
H02P6/24 (EP);
|
| Former IPC [2021/23] | H02P3/18, H02P29/00, H02P29/024, H02P29/028, H02J9/00, H02P6/24, H02P29/032, B65G43/00, B65G23/24 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/23] | Title | German: | GURTFÖRDEREINRICHTUNG SOWIE VERFAHREN ZUM ANHALTEN EINES GURTES EINER GURTFÖRDEREINRICHTUNG | [2021/23] | English: | BELT CONVEYOR DEVICE AND METHOD FOR STOPPING A BELT OF A BELT CONVEYOR DEVICE | [2021/23] | French: | DISPOSITIF DE TRANSPORT À COURROIE AINSI QUE PROCÉDÉ D'ARRÊT D'UNE COURROIE D'UN DISPOSITIF DE TRANSPORT À COURROIE | [2022/19] |
| Former [2021/23] | CONVOYEUR À BANDE ET PROCÉDÉ POUR ARRÊTER UNE BANDE D'UN CONVOYEUR À BANDE | Entry into regional phase | 01.03.2021 | National basic fee paid | 01.03.2021 | Designation fee(s) paid | 01.03.2021 | Examination fee paid | Examination procedure | 13.07.2020 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 01.03.2021 | Examination requested [2021/23] | 01.03.2021 | Date on which the examining division has become responsible | 29.04.2022 | Communication of intention to grant the patent | 26.07.2022 | Receipt of the translation of the claim(s) | 27.07.2022 | Fee for grant paid | 27.07.2022 | Fee for publishing/printing paid | Opposition(s) | Opponent(s) | 01
31.05.2023
01.06.2023
ADMISSIBLE SEW-EURODRIVE GmbH & Co. KG Ernst-Blickle Strasse 42 76646 Bruchsal / DE | [2023/27] | 22.06.2023 | Invitation to proprietor to file observations on the notice of opposition | 31.10.2023 | Reply of patent proprietor to notice(s) of opposition | 22.10.2024 | Legal effect of interlocutory decision in opposition | 22.10.2024 | Date of oral proceedings | 14.11.2024 | Despatch of interlocutory decision in opposition | 14.11.2024 | Despatch of minutes of oral proceedings | 19.02.2025 | Despatch of communication that the patent will be maintained as amended | Fees paid | Renewal fee | 17.09.2021 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.09.2019 | AL | 07.09.2022 | BG | 07.09.2022 | CY | 07.09.2022 | CZ | 07.09.2022 | DK | 07.09.2022 | EE | 07.09.2022 | ES | 07.09.2022 | FI | 07.09.2022 | HR | 07.09.2022 | IT | 07.09.2022 | LT | 07.09.2022 | LV | 07.09.2022 | MC | 07.09.2022 | MK | 07.09.2022 | MT | 07.09.2022 | NL | 07.09.2022 | PL | 07.09.2022 | RO | 07.09.2022 | SE | 07.09.2022 | SI | 07.09.2022 | SK | 07.09.2022 | SM | 07.09.2022 | TR | 07.09.2022 | IE | 17.09.2022 | LU | 17.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | LI | 30.09.2022 | FR | 07.11.2022 | NO | 07.12.2022 | GR | 08.12.2022 | IS | 07.01.2023 | PT | 09.01.2023 | GB | 17.09.2023 | [2026/05] |
| Former [2024/44] | HU | 17.09.2019 | |
| AL | 07.09.2022 | ||
| BG | 07.09.2022 | ||
| CY | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| MK | 07.09.2022 | ||
| MT | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 17.09.2023 | ||
| Former [2024/34] | HU | 17.09.2019 | |
| AL | 07.09.2022 | ||
| BG | 07.09.2022 | ||
| CY | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| MK | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 17.09.2023 | ||
| Former [2024/33] | HU | 17.09.2019 | |
| AL | 07.09.2022 | ||
| CY | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| MK | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| GB | 17.09.2023 | ||
| Former [2024/27] | HU | 17.09.2019 | |
| AL | 07.09.2022 | ||
| CY | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| MK | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2024/26] | HU | 17.09.2019 | |
| AL | 07.09.2022 | ||
| CY | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| IT | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2024/25] | HU | 17.09.2019 | |
| AL | 07.09.2022 | ||
| CY | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2024/21] | AL | 07.09.2022 | |
| CY | 07.09.2022 | ||
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/52] | AL | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| FR | 07.11.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/42] | AL | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/37] | AL | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SI | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/35] | AL | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/33] | AL | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| DK | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| IE | 17.09.2022 | ||
| LU | 17.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/30] | AL | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| MC | 07.09.2022 | ||
| NL | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| LU | 17.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/29] | AL | 07.09.2022 | |
| CZ | 07.09.2022 | ||
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/26] | CZ | 07.09.2022 | |
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| PL | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| IS | 07.01.2023 | ||
| PT | 09.01.2023 | ||
| Former [2023/23] | CZ | 07.09.2022 | |
| EE | 07.09.2022 | ||
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SK | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| PT | 09.01.2023 | ||
| Former [2023/22] | CZ | 07.09.2022 | |
| ES | 07.09.2022 | ||
| FI | 07.09.2022 | ||
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| RO | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| PT | 09.01.2023 | ||
| Former [2023/20] | FI | 07.09.2022 | |
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| SM | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| Former [2023/10] | FI | 07.09.2022 | |
| HR | 07.09.2022 | ||
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| GR | 08.12.2022 | ||
| Former [2023/09] | FI | 07.09.2022 | |
| LT | 07.09.2022 | ||
| LV | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| NO | 07.12.2022 | ||
| Former [2023/08] | FI | 07.09.2022 | |
| LT | 07.09.2022 | ||
| SE | 07.09.2022 | ||
| NO | 07.12.2022 | Cited in | International search | [A] DE102011085387 (SCHAEFFLER TECHNOLOGIES AG et al.) | [A] DE19943663 (GRUNDFOS AS et al.) | [A] WO2013020725 (POWERTRANS S A et al.) | [A] CN103950702 | [XI] M. Z. BEBIC ET AL: "Speed Controlled Belt Conveyors: Drives and Mechanical Considerations", ADVANCES IN ELECTRICAL AND COMPUTER ENGINEERING, vol. 18, no. 1, 28 February 2018 (2018-02-28), RO, pages 51 - 60, XP055553052, ISSN: 1582-7445, DOI: 10.4316/AECE.2018.01007 DOI: http://dx.doi.org/10.4316/AECE.2018.01007 | by applicant | DE102011085387 | DE19943663 | WO2013020725 | CN103950702 | M. Z. BEBIC ET AL.: "Speed Controlled Belt Conveyors: Drives and Mechanical Considerations", ADVANCES IN ELECTRICAL AND COMPUTER ENGINEERING, vol. 18, no. 1, 1 January 2018 (2018-01-01), pages 51 - 60, XP055553052, doi:10.4316/AECE.2018.01007 DOI: http://dx.doi.org/10.4316/AECE.2018.01007 | Opposition | DE102011085387 | DE19943663 | WO2013020725 | CN103950702 | US2017313522 | RU2540682 | CN203014723 | DE102013006964 | EP3006389 | DE102017202527 | DE102017204123 | DE102016010327 | EP3223420 | US2017313522 | CN203014723 | M. Z. BEBIC ET AL.: "Speed Controlled Belt Conveyors: Drives and Mechanical Considerations", ADVANCES IN ELECTRICAL AND COMPUTER ENGINEERING, vol. 18, no. 1, 28 February 2018 (2018-02-28), pages 51 - 60, XP055553052, ISSN: 1582-7445, DOI: 10.4316/AECE.2018.01007 DOI: http://dx.doi.org/10.4316/AECE.2018.01007 |