blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP4038849

EP4038849 - ENFORCEMENT OF MAXIMUM NUMBER OF ADMITTED TERMINALS PER NETWORK SLICE [Right-click to bookmark this link]
StatusRequest for examination was made
Status updated on  08.07.2022
Database last updated on 19.10.2024
FormerThe international publication has been made
Status updated on  10.04.2021
Formerunknown
Status updated on  21.10.2019
Most recent event   Tooltip13.08.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Nokia Technologies Oy
Karaportti 3
02610 Espoo / FI
[2022/32]
Inventor(s)01 / CASATI, Alessio
34 Molesham Way
West Molesey, Surrey KT8 1NT / GB
02 / LANDAIS, Bruno
60 Hent Koz Gweradur
22560 Pleumeur-Bodou / FR
 [2022/32]
Representative(s)Script Intellectual Property LLP
Suite J, Anchor House
School Close
Chandlers Ford
Eastleigh, Hampshire SO53 4DY / GB
[N/P]
Former [2022/32]TBK
Bavariaring 4-6
80336 München / DE
Application number, filing date19782551.630.09.2019
[2022/32]
WO2019EP76476
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2021063483
Date:08.04.2021
Language:EN
[2021/14]
Type: A1 Application with search report 
No.:EP4038849
Date:10.08.2022
Language:EN
The application published by WIPO in one of the EPO official languages on 08.04.2021 takes the place of the publication of the European patent application.
[2022/32]
Search report(s)International search report - published on:EP08.04.2021
ClassificationIPC:H04L12/911, H04W72/00, H04W76/00
[2022/32]
CPC:
H04W48/06 (EP,US); H04L47/785 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2022/32]
TitleGerman:DURCHSETZUNG DER MAXIMALEN ANZAHL VON ZUGELASSENEN ANSCHLÜSSEN PRO NETZWERK-SLICE[2022/32]
English:ENFORCEMENT OF MAXIMUM NUMBER OF ADMITTED TERMINALS PER NETWORK SLICE[2022/32]
French:APPLICATION D'UN NOMBRE MAXIMAL DE TERMINAUX ADMIS PAR TRANCHE DE RÉSEAU[2022/32]
Entry into regional phase21.04.2022National basic fee paid 
21.04.2022Designation fee(s) paid 
21.04.2022Examination fee paid 
Examination procedure21.04.2022Amendment by applicant (claims and/or description)
21.04.2022Examination requested  [2022/32]
21.04.2022Date on which the examining division has become responsible
Fees paidRenewal fee
21.04.2022Renewal fee patent year 03
16.08.2022Renewal fee patent year 04
24.08.2023Renewal fee patent year 05
13.08.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]US2017339609  (YOUN MYUNGJUNE [KR], et al) [A] 1-58 * paragraph [0069] - paragraph [0082] * * paragraph [0149] - paragraph [0206] ** figures 1, 7-10 *;
 [YA]US2017367110  (LI QING [US], et al) [Y] 1-13,27-39,53,57,58 * paragraph [0122] - paragraph [0125] * * paragraph [0134] - paragraph [0138] * * figures 25A, 25B, 29A, 29B * [A] 14-26,40-52,54-56;
 [YA]WO2018232241  (CONVIDA WIRELESS LLC [US]) [Y] 14-19,40-45,54,57,58 * paragraph [0091] - paragraph [0108] * * paragraph [0169] - paragraph [0175] * * figures 11, 20 * [A] 1-13,20-39,46-53,55,56;
 [A]WO2019032968  (CONVIDA WIRELESS LLC [US]) [A] 1-58 * paragraph [0048] - paragraph [0053] * * paragraph [0136] - paragraph [0167] * * figures 1-3, 17, 18 *;
 [YA]WO2019074347  (SAMSUNG ELECTRONICS CO LTD [KR]) [Y] 20-26,46-52,55-58 * paragraph [0078] - paragraph [0078] * * paragraph [0136] - paragraph [0142] * * figures 1A, 8B * [A] 1-19,27-45,53,54;
 [Y]WO2019105095  (CHINA MOBILE COMMUNICATION LTD RES INST [CN], et al) [Y] 1-58 * paragraphs [0262] - [0287] - [ 438] , [ 447] * * figures 9, 10 *;
 [YA]EP3512272  (PANASONIC IP CORP AMERICA [US]) [Y] 1-13,27-39,53,57,58 * paragraphs [0021] - [0023] - [0 59] , [ 119] , [ 121] * * figures 1, 2, 11, 12 * [A] 14-26,40-52,54-56;
 [A]  - BEGA DARIO ET AL, "Optimising 5G infrastructure markets: The business of network slicing", IEEE INFOCOM 2017 - IEEE CONFERENCE ON COMPUTER COMMUNICATIONS, IEEE, (20170501), doi:10.1109/INFOCOM.2017.8057045, pages 1 - 9, XP033160418 [A] 1-58 * the whole document *

DOI:   http://dx.doi.org/10.1109/INFOCOM.2017.8057045
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.