EP3672741 - DRIVE SYSTEM AND PROFILING INSTALLATION MODULE FOR A PROFILING INSTALLATION [Right-click to bookmark this link] | |||
Former [2020/27] | DRIVE SYSTEM AND PROFILING MODULE FOR A PROFILING SYSTEM | ||
[2020/43] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 03.04.2021 | ||
Former | Grant of patent is intended Status updated on 16.03.2021 | ||
Former | Examination is in progress Status updated on 02.02.2021 | ||
Former | Grant of patent is intended Status updated on 10.11.2020 | ||
Former | Examination is in progress Status updated on 01.05.2020 | ||
Former | unknown Status updated on 15.10.2019 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states PROFILMETALL Engineering GmbH Dillberg 22 97828 Marktheidenfeld / DE | [2020/27] | Inventor(s) | 01 /
ROTH, Manfred Hegelstr. 8 72145 Hirrlingen / DE | [2020/27] | Representative(s) | Witte, Weller & Partner Patentanwälte mbB Lise-Meitner-Straße 21 72202 Nagold / DE | [N/P] |
Former [2020/27] | Klocke, Peter ABACUS Patentanwälte Lise-Meitner-Strasse 21 72202 Nagold / DE | Application number, filing date | 19783032.6 | 08.10.2019 | [2020/27] | WO2019EP77173 | Priority number, date | EP20180201776 | 22.10.2018 Original published format: EP 18201776 | [2020/27] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2020083635 | Date: | 30.04.2020 | Language: | DE | [2020/18] | Type: | A1 Application with search report | No.: | EP3672741 | Date: | 01.07.2020 | Language: | DE | The application published by WIPO in one of the EPO official languages on 30.04.2020 takes the place of the publication of the European patent application. | [2020/27] | Type: | B1 Patent specification | No.: | EP3672741 | Date: | 05.05.2021 | Language: | DE | [2021/18] | Search report(s) | International search report - published on: | EP | 30.04.2020 | Classification | IPC: | B21D5/08, B21D5/12, B21B35/00 | [2020/27] | CPC: |
B21D5/08 (EP);
B21D5/12 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/27] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ANTRIEBSSYSTEM UND PROFILIERMODUL FÜR EINE PROFILIERANLAGE | [2020/27] | English: | DRIVE SYSTEM AND PROFILING INSTALLATION MODULE FOR A PROFILING INSTALLATION | [2020/43] | French: | SYSTÈME D'ENTRAÎNEMENT ET MODULE D' UNE INSTALLATION DE PROFILAGE POUR UNE INSTALLATION DE PROFILAGE | [2020/43] |
Former [2020/27] | DRIVE SYSTEM AND PROFILING MODULE FOR A PROFILING SYSTEM | ||
Former [2020/27] | SYSTÈME D'ENTRAÎNEMENT ET MODULE DE PROFILAGE POUR UNE INSTALLATION DE PROFILAGE | Entry into regional phase | 27.02.2020 | National basic fee paid | 27.02.2020 | Designation fee(s) paid | 27.02.2020 | Examination fee paid | Examination procedure | 27.02.2020 | Examination requested [2020/27] | 27.02.2020 | Date on which the examining division has become responsible | 07.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 15.05.2020 | Reply to a communication from the examining division | 11.11.2020 | Communication of intention to grant the patent | 27.01.2021 | Fee for grant paid | 27.01.2021 | Fee for publishing/printing paid | 28.01.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.03.2021 | Communication of intention to grant the patent | 24.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.10.2019 | AL | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | IE | 08.10.2021 | LU | 08.10.2021 | FR | 31.10.2021 | [2024/23] |
Former [2023/33] | HU | 08.10.2019 | |
AL | 05.05.2021 | ||
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
IE | 08.10.2021 | ||
LU | 08.10.2021 | ||
FR | 31.10.2021 | ||
Former [2023/30] | AL | 05.05.2021 | |
CY | 05.05.2021 | ||
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
IE | 08.10.2021 | ||
LU | 08.10.2021 | ||
FR | 31.10.2021 | ||
Former [2022/48] | AL | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
IE | 08.10.2021 | ||
LU | 08.10.2021 | ||
FR | 31.10.2021 | ||
Former [2022/41] | AL | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
LU | 08.10.2021 | ||
FR | 31.10.2021 | ||
Former [2022/35] | AL | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
LU | 08.10.2021 | ||
Former [2022/33] | AL | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
MC | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/29] | AL | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SI | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/26] | AL | 05.05.2021 | |
CZ | 05.05.2021 | ||
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/23] | CZ | 05.05.2021 | |
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/10] | CZ | 05.05.2021 | |
DK | 05.05.2021 | ||
EE | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | CZ | 05.05.2021 | |
DK | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RO | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SK | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/08] | CZ | 05.05.2021 | |
DK | 05.05.2021 | ||
FI | 05.05.2021 | ||
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2022/07] | FI | 05.05.2021 | |
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
SM | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/51] | FI | 05.05.2021 | |
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
RS | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
IS | 05.09.2021 | ||
PT | 06.09.2021 | ||
Former [2021/50] | FI | 05.05.2021 | |
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
PT | 06.09.2021 | ||
Former [2021/49] | FI | 05.05.2021 | |
HR | 05.05.2021 | ||
LT | 05.05.2021 | ||
LV | 05.05.2021 | ||
SE | 05.05.2021 | ||
BG | 05.08.2021 | ||
NO | 05.08.2021 | ||
GR | 06.08.2021 | ||
Former [2021/47] | FI | 05.05.2021 | |
LT | 05.05.2021 | ||
BG | 05.08.2021 | ||
Former [2021/46] | FI | 05.05.2021 | |
LT | 05.05.2021 | Cited in | International search | [A]US4831857 (LEVY ROGER [US], et al) [A] 1-9 * figures 1,4,7 *; | [A]EP0987067 (MORGAN CONSTRUCTION CO [US]) [A] 1-9 * figures 2,4,5 *; | [A]CN203695670U (HANGZHOU YIBO MACHINERY CO LTD) [A] 1-9 * figures 1-9 *; | [A]WO2015085340 (ASMAG HOLDING GMBH [AT]) [A] 1-9* figures 1-4 * |