EP3857087 - SLIDING BEARING ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.09.2023 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 23.09.2022 | ||
Former | Grant of patent is intended Status updated on 12.07.2022 | ||
Former | Request for examination was made Status updated on 02.07.2021 | ||
Former | The international publication has been made Status updated on 07.03.2020 | ||
Former | unknown Status updated on 18.10.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Miba Gleitlager Austria GmbH Dr. Mitterbauer-Strasse 3 4663 Laakirchen / AT | [2021/31] | Inventor(s) | 01 /
HAGER, Gunther Am Ziehberg 12 4563 Micheldorf / AT | 02 /
HAMDARD, Kamal Obere Schörihub 2 4810 Gmunden / AT | 03 /
SCHALLMEINER, Stefan Schloss-Au-Str. 10 4661 Roitham / AT | [2021/31] | Representative(s) | Burger, Hannes Anwälte Burger & Partner Rechtsanwalt GmbH Rosenauerweg 16 4580 Windischgarsten / AT | [2021/31] | Application number, filing date | 19783412.0 | 26.08.2019 | [2021/31] | WO2019AT60272 | Priority number, date | AT20180050741 | 29.08.2018 Original published format: AT 507412018 | [2021/31] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2020041809 | Date: | 05.03.2020 | Language: | DE | [2020/10] | Type: | A1 Application with search report | No.: | EP3857087 | Date: | 04.08.2021 | Language: | DE | The application published by WIPO in one of the EPO official languages on 05.03.2020 takes the place of the publication of the European patent application. | [2021/31] | Type: | B1 Patent specification | No.: | EP3857087 | Date: | 26.10.2022 | Language: | DE | [2022/43] | Search report(s) | International search report - published on: | EP | 05.03.2020 | Classification | IPC: | F16C41/00, F16C17/24, G01M13/04, G01L5/00, F16C17/02 | [2021/31] | CPC: |
F16C41/007 (EP);
F16C41/008 (EP,AT,US);
F16C17/02 (EP,US);
F16C17/24 (EP,US);
F16C41/004 (EP);
G01L5/0019 (EP,AT);
G01M13/04 (EP);
G01M13/045 (AT);
H02N2/186 (AT);
F02D2400/14 (AT);
F16C2202/36 (EP,US);
F16C2223/60 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/31] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | GLEITLAGERANORDNUNG | [2021/31] | English: | SLIDING BEARING ASSEMBLY | [2021/31] | French: | ENSEMBLE FORMANT PALIER LISSE | [2021/31] | Entry into regional phase | 24.03.2021 | National basic fee paid | 24.03.2021 | Designation fee(s) paid | 24.03.2021 | Examination fee paid | Examination procedure | 23.06.2020 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 24.03.2021 | Examination requested [2021/31] | 24.03.2021 | Date on which the examining division has become responsible | 25.11.2021 | Amendment by applicant (claims and/or description) | 13.07.2022 | Communication of intention to grant the patent | 14.09.2022 | Fee for grant paid | 14.09.2022 | Fee for publishing/printing paid | 14.09.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 27.07.2023 | No opposition filed within time limit [2023/40] | Fees paid | Renewal fee | 16.08.2021 | Renewal fee patent year 03 | 22.08.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 26.10.2022 | CZ | 26.10.2022 | DK | 26.10.2022 | EE | 26.10.2022 | ES | 26.10.2022 | FI | 26.10.2022 | HR | 26.10.2022 | IT | 26.10.2022 | LT | 26.10.2022 | LV | 26.10.2022 | MC | 26.10.2022 | NL | 26.10.2022 | PL | 26.10.2022 | RO | 26.10.2022 | RS | 26.10.2022 | SE | 26.10.2022 | SI | 26.10.2022 | SK | 26.10.2022 | SM | 26.10.2022 | NO | 26.01.2023 | GR | 27.01.2023 | IS | 26.02.2023 | PT | 27.02.2023 | [2024/26] |
Former [2024/16] | AL | 26.10.2022 | |
CZ | 26.10.2022 | ||
DK | 26.10.2022 | ||
EE | 26.10.2022 | ||
ES | 26.10.2022 | ||
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
MC | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RO | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
SI | 26.10.2022 | ||
SK | 26.10.2022 | ||
SM | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/51] | AL | 26.10.2022 | |
CZ | 26.10.2022 | ||
DK | 26.10.2022 | ||
EE | 26.10.2022 | ||
ES | 26.10.2022 | ||
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RO | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
SI | 26.10.2022 | ||
SK | 26.10.2022 | ||
SM | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/38] | AL | 26.10.2022 | |
CZ | 26.10.2022 | ||
DK | 26.10.2022 | ||
EE | 26.10.2022 | ||
ES | 26.10.2022 | ||
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RO | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
SK | 26.10.2022 | ||
SM | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/37] | AL | 26.10.2022 | |
CZ | 26.10.2022 | ||
DK | 26.10.2022 | ||
EE | 26.10.2022 | ||
ES | 26.10.2022 | ||
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RO | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
SM | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/35] | CZ | 26.10.2022 | |
DK | 26.10.2022 | ||
EE | 26.10.2022 | ||
ES | 26.10.2022 | ||
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RO | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
SM | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/34] | DK | 26.10.2022 | |
EE | 26.10.2022 | ||
ES | 26.10.2022 | ||
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
SM | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/33] | DK | 26.10.2022 | |
ES | 26.10.2022 | ||
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
SM | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/25] | ES | 26.10.2022 | |
FI | 26.10.2022 | ||
HR | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
PL | 26.10.2022 | ||
RS | 26.10.2022 | ||
SE | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
IS | 26.02.2023 | ||
PT | 27.02.2023 | ||
Former [2023/23] | ES | 26.10.2022 | |
FI | 26.10.2022 | ||
LT | 26.10.2022 | ||
LV | 26.10.2022 | ||
NL | 26.10.2022 | ||
SE | 26.10.2022 | ||
NO | 26.01.2023 | ||
GR | 27.01.2023 | ||
PT | 27.02.2023 | ||
Former [2023/22] | ES | 26.10.2022 | |
FI | 26.10.2022 | ||
LT | 26.10.2022 | ||
NL | 26.10.2022 | ||
SE | 26.10.2022 | ||
NO | 26.01.2023 | ||
PT | 27.02.2023 | ||
Former [2023/20] | LT | 26.10.2022 | |
NL | 26.10.2022 | ||
NO | 26.01.2023 | ||
Former [2023/17] | NL | 26.10.2022 | Cited in | International search | [X]EP1022702 (EATON CORP [US]) [X] 1,6,8 * paragraphs [0006] , [0007] , [0013] - [0016]; figure 1; claims 1,2 *; | [XY]DE102007052426 (SCHAEFFLER KG [DE]) [X] 1,3,4,6-8 * paragraphs [0001] - [0021] - [0026] - [0028] - [0031]; figure 1; claim - * [Y] 2; | [X]JP2009254163 (HONDA MOTOR CO LTD) [X] 1,5,6 * paragraphs [0032] , [0033] , [0035] , [0047] , [0048]; figure - *; | [Y]DE102013225330 (SKF AB [SE]) [Y] 2 * paragraphs [0035] - [0038]; figure -; claim - *; | [A]EP3211202 (MAHLE INT GMBH [DE]) [A] 1-8* paragraphs [0004] - [0013]; figure - * | by applicant | AT408900B | WO2013160053 | EP2963409 | US2016208849 |