blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3877203

EP3877203 - TRANSMISSION UNIT WITH A TRANSMISSION-SIDE BULKHEAD [Right-click to bookmark this link]
Former [2021/37]TRANSMISSION UNIT AND HYBRID MODULE WITH A TRANSMISSION-SIDE BULKHEAD
[2022/49]
StatusNo opposition filed within time limit
Status updated on  05.01.2024
Database last updated on 02.07.2024
FormerThe patent has been granted
Status updated on  27.01.2023
FormerGrant of patent is intended
Status updated on  21.11.2022
FormerRequest for examination was made
Status updated on  13.08.2021
FormerThe international publication has been made
Status updated on  16.05.2020
Formerunknown
Status updated on  04.11.2019
Most recent event   Tooltip20.06.2024Lapse of the patent in a contracting state
New state(s): LU
published on 24.07.2024 [2024/30]
Applicant(s)For all designated states
Schaeffler Technologies AG & Co. KG
Industriestrasse 1-3
91074 Herzogenaurach / DE
[2021/37]
Inventor(s)01 / MACMILLIAN, Loyal George
Steinstr. 19
76133 Karlsruhe / DE
02 / MACKOWIAK, Stefan
Dresdener Str. 29
76316 Malsch / DE
 [2021/37]
Application number, filing date19794088.508.10.2019
[2021/37]
WO2019DE100869
Priority number, dateDE20181012751105.11.2018         Original published format: DE102018127511
DE20191010377114.02.2019         Original published format: DE102019103771
[2021/37]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2020094177
Date:14.05.2020
Language:DE
[2020/20]
Type: A1 Application with search report 
No.:EP3877203
Date:15.09.2021
Language:DE
The application published by WIPO in one of the EPO official languages on 14.05.2020 takes the place of the publication of the European patent application.
[2021/37]
Type: B1 Patent specification 
No.:EP3877203
Date:01.03.2023
Language:DE
[2023/09]
Search report(s)International search report - published on:EP14.05.2020
ClassificationIPC:B60K6/387, B60K6/405, B60K6/48
[2021/37]
CPC:
B60K6/387 (EP,US); B60K6/405 (EP,US); B60K6/26 (US);
B60K6/48 (EP); F16D25/082 (EP); F16D25/10 (EP);
B60K2006/4825 (EP); Y02T10/62 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/37]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:GETRIEBEEINHEIT MIT EINER GETRIEBESEITIGEN TRENNWAND[2022/49]
English:TRANSMISSION UNIT WITH A TRANSMISSION-SIDE BULKHEAD[2022/49]
French:UNITÉ DE TRANSMISSION COMPRENANT UNE PAROI DE SÉPARATION CÔTÉ TRANSMISSION[2022/49]
Former [2021/37]GETRIEBEEINHEIT UND HYBRIDMODUL MIT EINER GETRIEBESEITIGEN TRENNWAND
Former [2021/37]TRANSMISSION UNIT AND HYBRID MODULE WITH A TRANSMISSION-SIDE BULKHEAD
Former [2021/37]UNITÉ DE TRANSMISSION ET MODULE HYBRIDE COMPRENANT UNE PAROI DE SÉPARATION CÔTÉ TRANSMISSION
Entry into regional phase07.06.2021National basic fee paid 
07.06.2021Designation fee(s) paid 
07.06.2021Examination fee paid 
Examination procedure07.06.2021Examination requested  [2021/37]
07.06.2021Date on which the examining division has become responsible
15.11.2021Amendment by applicant (claims and/or description)
22.11.2022Communication of intention to grant the patent
18.01.2023Fee for grant paid
18.01.2023Fee for publishing/printing paid
18.01.2023Receipt of the translation of the claim(s)
Opposition(s)04.12.2023No opposition filed within time limit [2024/06]
Fees paidRenewal fee
02.11.2021Renewal fee patent year 03
31.10.2022Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ01.03.2023
DK01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
IT01.03.2023
LT01.03.2023
LV01.03.2023
MC01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SI01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
LU08.10.2023
[2024/30]
Former [2024/28]CZ01.03.2023
DK01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
IT01.03.2023
LT01.03.2023
LV01.03.2023
MC01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SI01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
Former [2024/26]CZ01.03.2023
DK01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
IT01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SI01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
Former [2024/10]CZ01.03.2023
DK01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SI01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
Former [2023/50]CZ01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SK01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
IS01.07.2023
PT03.07.2023
Former [2023/49]CZ01.03.2023
EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RO01.03.2023
RS01.03.2023
SE01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
PT03.07.2023
Former [2023/48]EE01.03.2023
ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RS01.03.2023
SE01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
PT03.07.2023
Former [2023/46]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RS01.03.2023
SE01.03.2023
SM01.03.2023
NO01.06.2023
GR02.06.2023
PT03.07.2023
Former [2023/38]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
NL01.03.2023
PL01.03.2023
RS01.03.2023
SE01.03.2023
NO01.06.2023
GR02.06.2023
Former [2023/37]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
RS01.03.2023
SE01.03.2023
NO01.06.2023
GR02.06.2023
Former [2023/36]ES01.03.2023
FI01.03.2023
HR01.03.2023
LT01.03.2023
LV01.03.2023
RS01.03.2023
SE01.03.2023
NO01.06.2023
Former [2023/35]ES01.03.2023
HR01.03.2023
LT01.03.2023
RS01.03.2023
NO01.06.2023
Former [2023/34]ES01.03.2023
LT01.03.2023
RS01.03.2023
Former [2023/33]ES01.03.2023
LT01.03.2023
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.