EP3898290 - METHOD AND SYSTEM FOR MONITORING A TIRE DURING THE RUNNING OF A VEHICLE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.07.2023 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 29.07.2022 | ||
Former | Grant of patent is intended Status updated on 17.05.2022 | ||
Former | Request for examination was made Status updated on 24.09.2021 | ||
Former | The international publication has been made Status updated on 02.07.2020 | ||
Former | unknown Status updated on 21.12.2019 | Most recent event Tooltip | 19.07.2024 | Lapse of the patent in a contracting state New state(s): BG | published on 21.08.2024 [2024/34] | Applicant(s) | For all designated states Pirelli Tyre S.P.A. Viale Piero e Alberto Pirelli, 25 20126 Milan / IT | [2021/43] | Inventor(s) | 01 /
GARBELLI, Daniele C/O PIRELLI TYRE S.P.A. Viale Piero e Alberto Pirelli, 25 20126 Milan / IT | 02 /
SOCCI, Luciano Viale Zara 52 20126 Milano / IT | [2021/43] | Representative(s) | Lasca, Sergio Pirelli & C. S.p.A. Industrial Property (cdc 5104) Viale Piero e Alberto Pirelli, 25 20126 Milano / IT | [2021/43] | Application number, filing date | 19818047.3 | 10.12.2019 | [2021/43] | WO2019EP84342 | Priority number, date | IT20180011176 | 18.12.2018 Original published format: IT201800011176 | [2021/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020126646 | Date: | 25.06.2020 | Language: | EN | [2020/26] | Type: | A1 Application with search report | No.: | EP3898290 | Date: | 27.10.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.06.2020 takes the place of the publication of the European patent application. | [2021/43] | Type: | B1 Patent specification | No.: | EP3898290 | Date: | 31.08.2022 | Language: | EN | [2022/35] | Search report(s) | International search report - published on: | EP | 25.06.2020 | Classification | IPC: | B60C23/04, B60C23/06 | [2021/43] | CPC: |
B60C23/0488 (EP);
B60C23/0408 (EP);
B60C23/061 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR ÜBERWACHUNG DES REIFENS IM FAHRBETRIEB | [2022/24] | English: | METHOD AND SYSTEM FOR MONITORING A TIRE DURING THE RUNNING OF A VEHICLE | [2021/43] | French: | MÉTHODE ET DISPOSITIF DE SURVEILLANCE D'UN PNEUMATIQUE PENDANT SA COURSE | [2022/17] |
Former [2021/43] | VERFAHREN UND SYSTEM ZUR ÜBERWACHUNG EINES REIFENS WÄHREND DES FAHRENS EINES FAHRZEUGS | ||
Former [2021/43] | PROCÉDÉ ET SYSTÈME DE SURVEILLANCE D'UN PNEUMATIQUE EN COURS DE FONCTIONNEMENT D'UN VÉHICULE | Entry into regional phase | 12.05.2021 | National basic fee paid | 12.05.2021 | Designation fee(s) paid | 12.05.2021 | Examination fee paid | Examination procedure | 12.05.2021 | Examination requested [2021/43] | 12.05.2021 | Date on which the examining division has become responsible | 27.01.2022 | Amendment by applicant (claims and/or description) | 18.05.2022 | Communication of intention to grant the patent | 26.07.2022 | Fee for grant paid | 26.07.2022 | Fee for publishing/printing paid | 26.07.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 01.06.2023 | No opposition filed within time limit [2023/32] | Fees paid | Renewal fee | 27.12.2021 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.12.2019 | AL | 31.08.2022 | AT | 31.08.2022 | BG | 31.08.2022 | CY | 31.08.2022 | CZ | 31.08.2022 | DK | 31.08.2022 | EE | 31.08.2022 | ES | 31.08.2022 | FI | 31.08.2022 | HR | 31.08.2022 | LT | 31.08.2022 | LV | 31.08.2022 | MC | 31.08.2022 | MK | 31.08.2022 | NL | 31.08.2022 | PL | 31.08.2022 | RO | 31.08.2022 | RS | 31.08.2022 | SE | 31.08.2022 | SI | 31.08.2022 | SK | 31.08.2022 | SM | 31.08.2022 | TR | 31.08.2022 | NO | 30.11.2022 | GR | 01.12.2022 | IE | 10.12.2022 | LU | 10.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | IS | 31.12.2022 | LI | 31.12.2022 | PT | 02.01.2023 | [2024/34] |
Former [2024/29] | HU | 10.12.2019 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
MC | 31.08.2022 | ||
MK | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
TR | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IE | 10.12.2022 | ||
LU | 10.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/27] | HU | 10.12.2019 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
MK | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IE | 10.12.2022 | ||
LU | 10.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/25] | HU | 10.12.2019 | |
AL | 31.08.2022 | ||
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IE | 10.12.2022 | ||
LU | 10.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2024/21] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CY | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IE | 10.12.2022 | ||
LU | 10.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/49] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IE | 10.12.2022 | ||
LU | 10.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/48] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IE | 10.12.2022 | ||
LU | 10.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/47] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
LU | 10.12.2022 | ||
CH | 31.12.2022 | ||
IS | 31.12.2022 | ||
LI | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/38] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
LU | 10.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/37] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SI | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/30] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
NL | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/29] | AL | 31.08.2022 | |
AT | 31.08.2022 | ||
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/23] | AT | 31.08.2022 | |
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
EE | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SK | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/22] | AT | 31.08.2022 | |
CZ | 31.08.2022 | ||
DK | 31.08.2022 | ||
ES | 31.08.2022 | ||
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RO | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
PT | 02.01.2023 | ||
Former [2023/21] | DK | 31.08.2022 | |
FI | 31.08.2022 | ||
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/20] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
SM | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/12] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
IS | 31.12.2022 | ||
Former [2023/11] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
PL | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
Former [2023/10] | FI | 31.08.2022 | |
HR | 31.08.2022 | ||
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
GR | 01.12.2022 | ||
Former [2023/09] | FI | 31.08.2022 | |
LT | 31.08.2022 | ||
LV | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | ||
Former [2023/08] | FI | 31.08.2022 | |
LT | 31.08.2022 | ||
RS | 31.08.2022 | ||
SE | 31.08.2022 | ||
NO | 30.11.2022 | Cited in | International search | [XAYI]WO2005042322 (PIRELLI [IT], et al) [X] 1,10-12,14 * abstract * * pages 1,33; figures 1,4 * [A] 2,7-9,18 [Y] 16,17,24 [I] 3-6,13,15,19-23; | [Y]WO2012042369 (PIRELLI [IT], et al) [Y] 16,24 * abstract * * page 21; figure 2 *; | [Y]WO2012085655 (PIRELLI [IT], et al) [Y] 17 * abstract ** pages 1,14; figures 1,3,4,6 * | by applicant | EP1202867 | EP1449684 | EP1487681 | EP1572474 | EP1642108 | EP1676112 | EP1675735 | EP1678019 | EP1794007 | WO2008065465 | EP2346725 | EP2352653 |