blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3813455

EP3813455 - RESOURCE ALLOCATION METHOD, NODE, AND STORAGE MEDIUM [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  08.09.2023
Database last updated on 15.06.2024
FormerRequest for examination was made
Status updated on  26.03.2021
FormerThe international publication has been made
Status updated on  27.12.2019
Most recent event   Tooltip13.05.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
Vivo Mobile Communication Co., Ltd.
283 BBK Road
Wusha
Chang'An
Dongguan, Guangdong 523860 / CN
[2021/17]
Inventor(s)01 / KIMBA DIT ADAMOU, Boubacar
283, BBK Road
Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
02 / SHEN, Xiaodong
283, BBK Road
Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
03 / BAO, Wei
283, BBK Road
Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
 [2021/17]
Representative(s)Conti, Marco
Bugnion S.p.A. Via di Corticella, 87
40128 Bologna / IT
[2021/17]
Application number, filing date19823167.220.06.2019
[2021/17]
WO2019CN92030
Priority number, dateCN20181064563821.06.2018         Original published format: CN201810645638
[2021/17]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019242674
Date:26.12.2019
Language:ZH
[2019/52]
Type: A1 Application with search report 
No.:EP3813455
Date:28.04.2021
Language:EN
[2021/17]
Search report(s)International search report - published on:CN26.12.2019
(Supplementary) European search report - dispatched on:EP08.07.2021
ClassificationIPC:H04W72/04, H04B7/155
[2021/32]
CPC:
H04B7/15542 (EP); H04W72/20 (CN); H04W72/27 (CN,US);
H04W72/0453 (CN,US); H04W72/21 (CN,US); H04W72/23 (CN,US)
Former IPC [2021/17]H04W72/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/17]
TitleGerman:VERFAHREN, KNOTEN UND SPEICHERMEDIUM ZUR RESSOURCENZUWEISUNG[2021/17]
English:RESOURCE ALLOCATION METHOD, NODE, AND STORAGE MEDIUM[2021/17]
French:PROCÉDÉ D'ATTRIBUTION DE RESSOURCES, NOEUD ET SUPPORT DE STOCKAGE[2021/17]
Entry into regional phase08.01.2021Translation filed 
08.01.2021National basic fee paid 
08.01.2021Search fee paid 
08.01.2021Designation fee(s) paid 
08.01.2021Examination fee paid 
Examination procedure08.01.2021Examination requested  [2021/17]
07.02.2022Amendment by applicant (claims and/or description)
07.09.2023Despatch of a communication from the examining division (Time limit: M06)
18.03.2024Reply to a communication from the examining division
Fees paidRenewal fee
08.01.2021Renewal fee patent year 03
13.05.2022Renewal fee patent year 04
31.03.2023Renewal fee patent year 05
13.05.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XI]US2016295565  (KIM MYOUNGSEOB [KR], et al) [X] 10,11,15 * abstract * * paragraph [0037]; figures 5-16 * * paragraph [0157] - paragraph [0161] * * paragraph [0211] - paragraph [0309] * [I] 12;
 [XI]  - SONY, "Discussion on NR enhancements to support IAB", vol. RAN WG1, no. Busan, Korea; 20180521 - 20180525, (20180511), 3GPP DRAFT; R1-1806572_DISCUSSION ON NR ENHANCEMENTS TO SUPPORT IAB_REV2, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F93/Docs, (20180511), XP051461899 [X] 1-8,13,14 * page 2 - page 3; figure 1 * [I] 9
 [A]  - HUAWEI ET AL, "Physical layer enhancement on IAB", vol. RAN WG1, no. Sanya, China; 20180416 - 20180420, (20180415), 3GPP DRAFT; R1-1803695, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings%5F3GPP%5FSYNC/RAN1/Docs/, (20180415), XP051425992 [A] 1-15 * the whole document *
International search[A]CN101212757  (HUAWEI TECH CO LTD [CN]) [A] 1-33 * entire document *;
 [A]EP2242298  (VODAFONE PLC [GB]) [A] 1-33* entire document *;
 [X]WO2011038528  (ALCATEL LUCENT SHANGHAI BELL [CN], et al) [X] 1-33 * description, page 6, line 9 to page 9, line 15, and figures 4-9 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.