blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3815782

EP3815782 - STEAM REFORMING CATALYST, AND FUEL CELL SYSTEM USING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  24.03.2023
Database last updated on 26.07.2024
FormerThe patent has been granted
Status updated on  15.04.2022
FormerGrant of patent is intended
Status updated on  16.12.2021
FormerRequest for examination was made
Status updated on  03.04.2021
FormerThe international publication has been made
Status updated on  27.12.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
SUMITOMO ELECTRIC INDUSTRIES, LTD.
5-33, Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
[2021/18]
Inventor(s)01 / HIRAIWA, Chihiro
c/o SUMITOMO ELECTRIC INDUSTRIES, LTD.
5-33, Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
02 / MAJIMA, Masatoshi
c/o SUMITOMO ELECTRIC INDUSTRIES, LTD.
5-33, Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
03 / HIGASHINO, Takahiro
c/o SUMITOMO ELECTRIC INDUSTRIES, LTD.
5-33, Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
04 / MIZUHARA, Naho
c/o SUMITOMO ELECTRIC INDUSTRIES, LTD.
5-33, Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
05 / TAWARAYAMA, Hiromasa
c/o SUMITOMO ELECTRIC INDUSTRIES, LTD.
5-33, Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
 [2022/19]
Former [2021/18]01 / HIRAIWA, Chihiro
c/o Sumitomo Electric Industries, Ltd., 5-33,
Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
02 / MAJIMA, Masatoshi
c/o Sumitomo Electric Industries, Ltd., 5-33,
Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
03 / HIGASHINO, Takahiro
c/o Sumitomo Electric Industries, Ltd., 5-33,
Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
04 / MIZUHARA, Naho
c/o Sumitomo Electric Industries, Ltd., 5-33,
Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
05 / TAWARAYAMA, Hiromasa
c/o Sumitomo Electric Industries, Ltd., 5-33,
Kitahama 4-chome, Chuo-ku
Osaka-shi, Osaka 541-0041 / JP
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2021/18]
Application number, filing date19823572.322.05.2019
[2021/18]
WO2019JP20239
Priority number, dateJP2018011683520.06.2018         Original published format: JP 2018116835
[2021/18]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019244546
Date:26.12.2019
Language:JA
[2019/52]
Type: A1 Application with search report 
No.:EP3815782
Date:05.05.2021
Language:EN
[2021/18]
Type: B1 Patent specification 
No.:EP3815782
Date:18.05.2022
Language:EN
[2022/20]
Search report(s)International search report - published on:JP26.12.2019
(Supplementary) European search report - dispatched on:EP15.07.2021
ClassificationIPC:B01J23/847, B01J23/89, B01J23/755, B01J37/02, C01B3/40, H01M8/0612, H01M8/12
[2021/51]
CPC:
B01J37/0209 (EP); B01J23/892 (EP,US); B01J23/20 (US);
B01J23/755 (EP,US); B01J23/847 (EP); B01J23/89 (EP,US);
B01J23/898 (EP); C01B3/40 (EP,US); H01M8/0618 (EP,US);
C01B2203/0233 (EP,US); C01B2203/066 (US); C01B2203/1052 (EP);
C01B2203/1058 (EP,US); C01B2203/1064 (EP); C01B2203/107 (US);
C01B2203/1082 (EP,US); C01B2203/1247 (EP,US); Y02E60/50 (EP);
Y02P20/52 (EP) (-)
Former IPC [2021/33]B01J23/847, B01J23/89, B01J23/755, C01B3/40, B01J37/02, H01M8/0612, H01M8/12
Former IPC [2021/18]B01J23/847, B01J23/89, C01B3/40, H01M8/0612, H01M8/12
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/18]
Extension statesBANot yet paid
MENot yet paid
Validation statesKHNot yet paid
MANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:DAMPFREFORMIERUNGSKATALYSATOR UND BRENNSTOFFZELLENSYSTEM DAMIT[2021/18]
English:STEAM REFORMING CATALYST, AND FUEL CELL SYSTEM USING SAME[2021/18]
French:CATALYSEUR DE VAPOREFORMAGE ET SYSTÈME DE PILES À COMBUSTIBLE L'UTILISANT[2021/18]
Entry into regional phase01.12.2020Translation filed 
01.12.2020National basic fee paid 
01.12.2020Search fee paid 
01.12.2020Designation fee(s) paid 
01.12.2020Examination fee paid 
Examination procedure01.12.2020Examination requested  [2021/18]
22.09.2021Amendment by applicant (claims and/or description)
17.12.2021Communication of intention to grant the patent
08.04.2022Fee for grant paid
08.04.2022Fee for publishing/printing paid
08.04.2022Receipt of the translation of the claim(s)
Opposition(s)21.02.2023No opposition filed within time limit [2023/17]
Fees paidRenewal fee
01.12.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.05.2019
CY11.05.2022
MK11.05.2022
TR11.05.2022
AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
IT18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SI18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
FR18.07.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
[2024/29]
Former [2024/25]HU22.05.2019
CY11.05.2022
MK11.05.2022
AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
IT18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SI18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
FR18.07.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2024/23]CY11.05.2022
MK11.05.2022
AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
IT18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SI18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
FR18.07.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2024/20]CY11.05.2022
AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
IT18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SI18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
FR18.07.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2024/11]AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
IT18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SI18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
FR18.07.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/25]AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SI18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
BE31.05.2022
CH31.05.2022
LI31.05.2022
FR18.07.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/22]AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
CH31.05.2022
LI31.05.2022
FR18.07.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/20]AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SK18.05.2022
SM18.05.2022
IE22.05.2022
LU22.05.2022
CH31.05.2022
LI31.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/17]AL18.05.2022
AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SK18.05.2022
SM18.05.2022
LU22.05.2022
CH31.05.2022
LI31.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/11]AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
MC18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SK18.05.2022
SM18.05.2022
LU22.05.2022
CH31.05.2022
LI31.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/09]AT18.05.2022
CZ18.05.2022
DK18.05.2022
EE18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
NL18.05.2022
PL18.05.2022
RO18.05.2022
RS18.05.2022
SE18.05.2022
SK18.05.2022
SM18.05.2022
LU22.05.2022
CH31.05.2022
LI31.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/08]AT18.05.2022
DK18.05.2022
ES18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
NL18.05.2022
PL18.05.2022
RS18.05.2022
SE18.05.2022
LU22.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2023/07]AT18.05.2022
DK18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
NL18.05.2022
PL18.05.2022
RS18.05.2022
SE18.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2022/51]AT18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
NL18.05.2022
PL18.05.2022
RS18.05.2022
SE18.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
IS18.09.2022
PT19.09.2022
Former [2022/50]AT18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
NL18.05.2022
PL18.05.2022
RS18.05.2022
SE18.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
PT19.09.2022
Former [2022/49]AT18.05.2022
FI18.05.2022
HR18.05.2022
LT18.05.2022
LV18.05.2022
NL18.05.2022
SE18.05.2022
BG18.08.2022
NO18.08.2022
GR19.08.2022
PT19.09.2022
Former [2022/48]AT18.05.2022
FI18.05.2022
LT18.05.2022
NL18.05.2022
SE18.05.2022
NO18.08.2022
PT19.09.2022
Former [2022/47]AT18.05.2022
FI18.05.2022
LT18.05.2022
SE18.05.2022
NO18.08.2022
PT19.09.2022
Documents cited:Search[A]US2011039183  (ARMSTRONG TAD [US], et al) [A] 1-9* claim - *;
 [A]  - JUAN ALVAREZ ET AL, "Ni-Nb-Based Mixed Oxides Precursors for the Dry Reforming of Methane", TOPICS IN CATALYSIS, KLUWER ACADEMIC PUBLISHERS-PLENUM PUBLISHERS, NE, (20110121), vol. 54, no. 1 - 4, doi:10.1007/S11244-011-9636-7, ISSN 1572-9028, pages 170 - 178, XP019884164 [A] 1-9 * 2. Experimental;; table 3 *

DOI:   http://dx.doi.org/10.1007/s11244-011-9636-7
International search[Y]JP2010022983  (JAPAN PETROLEUM EXPLORATION CO, et al) [Y] 1, 3-9 * , *;
 [YA]JP2011194340  (IDEMITSU KOSAN CO, et al) [Y] 1, 3-9 * , * [A] 2;
 [Y]JP2011212598  (NIPPON STEEL CORP) [Y] 1, 3-9 * , *;
 [Y]JP2012234664  (HONDA MOTOR CO LTD) [Y] 8, 9* , *;
 [Y]JP2016165712  (TOYOTA CENTRAL RES & DEV, et al) [Y] 5, 8, 9 * , *;
 [Y]JP2017013040  (KOREA INST OF ENERG RESERCH) [Y] 5, 8, 9 * , *
by applicantJP2000084410
 JP2010006650
 JP2018116835
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.