EP3850064 - PROCESS TO PREPARE A CHAR PRODUCT AND A SYNTHESIS GAS MIXTURE [Right-click to bookmark this link] | |||
Former [2021/29] | PROCESS TO PREPARE A CHAR PRODUCT | ||
[2022/32] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 05.05.2023 | ||
Former | Grant of patent is intended Status updated on 01.01.2023 | ||
Former | Examination is in progress Status updated on 18.11.2022 | ||
Former | Grant of patent is intended Status updated on 28.07.2022 | ||
Former | Examination is in progress Status updated on 28.01.2022 | ||
Former | Request for examination was made Status updated on 18.06.2021 | ||
Former | The international publication has been made Status updated on 21.03.2020 | ||
Former | unknown Status updated on 10.01.2020 | Most recent event Tooltip | 12.07.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 14.08.2024 [2024/33] | Applicant(s) | For all designated states Torrgas Technology B.V. De entree 232 unit 5.04 1101 EE Amsterdam / NL | [2023/12] |
Former [2021/29] | For all designated states Torrgas Technology B.V. Herikerbergweg 292 1101 CT Amsterdam / NL | Inventor(s) | 01 /
BERENDS, Robert Hugo Badhuisstraat 1 7411 PR Deventer / NL | 02 /
POST VAN DER BURG, Robin Pieter Herikerbergweg 292 1101 CT Amsterdam / NL | [2021/29] | Representative(s) | Cramwinckel, Michiel Cramwinckel Consultancy Kallenkoterallee 82 A 8331 AJ Steenwijk / NL | [2021/29] | Application number, filing date | 19829323.5 | 13.09.2019 | [2021/29] | WO2019NL50597 | Priority number, date | WO2018NL50604 | 14.09.2018 Original published format: PCT/NL2018/050604 | [2021/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020055254 | Date: | 19.03.2020 | Language: | EN | [2020/12] | Type: | A1 Application with search report | No.: | EP3850064 | Date: | 21.07.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.03.2020 takes the place of the publication of the European patent application. | [2021/29] | Type: | B1 Patent specification | No.: | EP3850064 | Date: | 07.06.2023 | Language: | EN | [2023/23] | Search report(s) | International search report - published on: | EP | 19.03.2020 | Classification | IPC: | C10J3/66, C10J3/84, C01B32/312, C01B32/05, C01B32/40, C10B49/04, C10B53/02, C10B57/02, C10K3/00, C10L5/44, C10L9/08 | [2022/30] | CPC: |
C01B32/05 (EP);
C10J3/66 (US);
C01B3/32 (US);
C01B32/318 (US);
C01B32/40 (EP);
C10B47/00 (US);
C10B49/04 (EP,US);
C10B53/02 (EP,US);
C10B57/02 (EP);
C10J3/002 (EP,US);
C10J3/84 (EP,US);
C10K3/001 (EP,US);
C10K3/005 (EP);
C10L9/083 (EP);
C01B2203/0255 (US);
C01P2006/12 (US);
C10J2300/0909 (EP,US);
C10J2300/0916 (EP,US);
C10J2300/1846 (US);
C10J2300/1884 (EP,US);
C10L2290/02 (EP);
|
Former IPC [2021/29] | C10J3/66, C10J3/84, C01B32/312 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/29] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | VERFAHREN ZUR BEREITUNG EINES KOHLENSTOFFPRODUKTS UND EINER SYNGAS-MISCHUNG | [2022/30] | English: | PROCESS TO PREPARE A CHAR PRODUCT AND A SYNTHESIS GAS MIXTURE | [2022/32] | French: | PROCEDE DE PREPARATION D'UN PRODUIT DE CHARBON ET D'UN MELANGE DE GAZ DE SYNTHESE | [2022/30] |
Former [2021/29] | VERFAHREN ZUR HERSTELLUNG EINES KOHLEPRODUKTS | ||
Former [2021/29] | PROCESS TO PREPARE A CHAR PRODUCT | ||
Former [2021/29] | PROCESSUS DE PRÉPARATION D'UN PRODUIT DE CARBONISATION | Entry into regional phase | 04.03.2021 | National basic fee paid | 04.03.2021 | Designation fee(s) paid | 04.03.2021 | Examination fee paid | Examination procedure | 14.07.2020 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 04.03.2021 | Examination requested [2021/29] | 04.03.2021 | Date on which the examining division has become responsible | 11.06.2021 | Amendment by applicant (claims and/or description) | 27.01.2022 | Despatch of a communication from the examining division (Time limit: M04) | 04.04.2022 | Reply to a communication from the examining division | 29.07.2022 | Communication of intention to grant the patent | 16.11.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 16.11.2022 | Fee for grant paid | 16.11.2022 | Fee for publishing/printing paid | 02.01.2023 | Communication of intention to grant the patent | 28.04.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP23157548.1 / EP4202021 | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Fees paid | Renewal fee | 27.09.2021 | Renewal fee patent year 03 | 27.09.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 07.06.2023 | CZ | 07.06.2023 | DK | 07.06.2023 | EE | 07.06.2023 | ES | 07.06.2023 | FI | 07.06.2023 | HR | 07.06.2023 | IT | 07.06.2023 | LT | 07.06.2023 | LV | 07.06.2023 | MC | 07.06.2023 | PL | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SE | 07.06.2023 | SI | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | NO | 07.09.2023 | GR | 08.09.2023 | IE | 13.09.2023 | LU | 13.09.2023 | IS | 07.10.2023 | PT | 09.10.2023 | [2024/33] |
Former [2024/28] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
MC | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
LU | 13.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/26] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
IT | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
LU | 13.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/25] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SI | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
LU | 13.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/22] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
DK | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/10] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
EE | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
PL | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
PT | 09.10.2023 | ||
Former [2024/09] | AT | 07.06.2023 | |
CZ | 07.06.2023 | ||
ES | 07.06.2023 | ||
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/08] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/03] | ES | 07.06.2023 | |
FI | 07.06.2023 | ||
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2024/01] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
LT | 07.06.2023 | ||
LV | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/51] | ES | 07.06.2023 | |
HR | 07.06.2023 | ||
RS | 07.06.2023 | ||
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/50] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/48] | ES | 07.06.2023 | |
SE | 07.06.2023 | ||
NO | 07.09.2023 | ||
Former [2023/46] | ES | 07.06.2023 | Cited in | International search | [A]WO2010130988 (UNIV ASTON [GB], et al) [A] 1-16 * the whole document ** figures 1-10 *; | [I]US2015076411 (OCFEMIA KIM CARLO S [US], et al) [I] 1-16 * paragraph [0024] * * paragraph [0050] * * paragraph [0039] * * claim 3 * * the whole document *; | [XI]US2017114284 (BINDER SAMIR [DE], et al) [X] 1,2 * paragraph [0045] * * paragraph [0040] - paragraph [0043] * * paragraph [0044] * * paragraphs [0067] - [0069] * [I] 14,15 | by applicant | EP0291111 | US4955989 | US4988239 | WO9603345 | WO9639354 | WO9722547 | US5769007 | DE19720417 | WO2007131975 | US2007267171 | US2009178336 | US2011100274 | WO2012102617 | WO2017160146 | - Oil and Gas Journal, (19710906), pages 85 - 90 |