EP3894291 - EFFLUENT PROCESSING APPARATUS AND METHOD FOR A VEHICLE AIR BRAKE CHARGING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.07.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 04.08.2023 | ||
Former | Grant of patent is intended Status updated on 17.04.2023 | ||
Former | Request for examination was made Status updated on 17.09.2021 | ||
Former | The international publication has been made Status updated on 20.06.2020 | ||
Former | unknown Status updated on 17.01.2020 | Most recent event Tooltip | 18.10.2024 | Lapse of the patent in a contracting state New state(s): BE, FR, GB | published on 20.11.2024 [2024/47] | Applicant(s) | For all designated states Bendix Commercial Vehicle Systems LLC 35500 Chester Road Avon, Ohio 44011 / US | [2022/07] |
Former [2021/42] | For all designated states Bendix Commercial Vehicle Systems, LLC 901 Cleveland Street Elyria, Ohio 44035 / US | Inventor(s) | 01 /
HOWE, Stephen 901 Cleveland Street Elyria, Ohio 44035 / US | 02 /
PERRY, David W. 901 Cleveland Street Elyria, Ohio 44035 / US | 03 /
ASHLEY, Gregory R 901 Cleveland Street Elyria, Ohio 44035 / US | 04 /
HOFFMAN, Fred W 901 Cleveland Street Elyria, Ohio 44035 / US | [2021/42] | Representative(s) | Kleine, Hubertus, et al Loesenbeck - Specht - Dantz Patent- und Rechtsanwälte Am Zwinger 2 33602 Bielefeld / DE | [2021/42] | Application number, filing date | 19832778.5 | 09.12.2019 | [2021/42] | WO2019US65131 | Priority number, date | US201816214647 | 10.12.2018 Original published format: US201816214647 | [2021/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020123328 | Date: | 18.06.2020 | Language: | EN | [2020/25] | Type: | A1 Application with search report | No.: | EP3894291 | Date: | 20.10.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.06.2020 takes the place of the publication of the European patent application. | [2021/42] | Type: | B1 Patent specification | No.: | EP3894291 | Date: | 06.09.2023 | Language: | EN | [2023/36] | Search report(s) | International search report - published on: | EP | 18.06.2020 | Classification | IPC: | B60T17/00, B01D53/04, B01D53/14, B01D53/26, B01D17/02, B01D17/04, B01D45/04, B01D45/08 | [2021/42] | CPC: |
B60T17/004 (EP,US);
B01D46/0031 (US);
B01D17/0211 (EP);
B01D45/04 (EP);
B01D45/08 (EP);
B60T13/683 (US);
B60T17/02 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | GERÄT UND VERFAHREN ZUR ABFLUSSBEHANDLUNG EINES FAHRZEUGBREMSLUFTVERSORGUNGSSYSTEMS | [2023/12] | English: | EFFLUENT PROCESSING APPARATUS AND METHOD FOR A VEHICLE AIR BRAKE CHARGING SYSTEM | [2021/42] | French: | APPAREIL ET PROCÉDÉ POUR TRAITEMENT D'UN EFFLUENT POUR UN FREINAGE PNEUMATIQUE DANS UN VÉHICULE | [2023/12] |
Former [2021/42] | VORRICHTUNG UND VERFAHREN ZUR ABSTROMBEHANDLUNG FÜR EIN DRUCKLUFTBREMSENLADESYSTEM ENES FAHRZEUGS | ||
Former [2021/42] | APPAREIL ET PROCÉDÉ DE TRAITEMENT D'EFFLUENTS POUR UN SYSTÈME DE CHARGE DE FREIN PNEUMATIQUE DE VÉHICULE | Entry into regional phase | 25.06.2021 | National basic fee paid | 25.06.2021 | Designation fee(s) paid | 25.06.2021 | Examination fee paid | Examination procedure | 25.06.2021 | Examination requested [2021/42] | 25.06.2021 | Date on which the examining division has become responsible | 17.01.2022 | Amendment by applicant (claims and/or description) | 18.04.2023 | Communication of intention to grant the patent | 01.08.2023 | Fee for grant paid | 01.08.2023 | Fee for publishing/printing paid | 01.08.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 07.06.2024 | No opposition filed within time limit [2024/33] | Fees paid | Renewal fee | 16.07.2021 | Renewal fee patent year 03 | 15.12.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 06.09.2023 | CZ | 06.09.2023 | DK | 06.09.2023 | EE | 06.09.2023 | ES | 06.09.2023 | FI | 06.09.2023 | HR | 06.09.2023 | IT | 06.09.2023 | LT | 06.09.2023 | LV | 06.09.2023 | MC | 06.09.2023 | NL | 06.09.2023 | PL | 06.09.2023 | RO | 06.09.2023 | RS | 06.09.2023 | SE | 06.09.2023 | SI | 06.09.2023 | SK | 06.09.2023 | SM | 06.09.2023 | NO | 06.12.2023 | GR | 07.12.2023 | GB | 09.12.2023 | IE | 09.12.2023 | LU | 09.12.2023 | BE | 31.12.2023 | FR | 31.12.2023 | IS | 06.01.2024 | PT | 08.01.2024 | [2024/47] |
Former [2024/46] | AT | 06.09.2023 | |
CZ | 06.09.2023 | ||
DK | 06.09.2023 | ||
EE | 06.09.2023 | ||
ES | 06.09.2023 | ||
FI | 06.09.2023 | ||
HR | 06.09.2023 | ||
IT | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
MC | 06.09.2023 | ||
NL | 06.09.2023 | ||
PL | 06.09.2023 | ||
RO | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SI | 06.09.2023 | ||
SK | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
IE | 09.12.2023 | ||
LU | 09.12.2023 | ||
IS | 06.01.2024 | ||
PT | 08.01.2024 | ||
Former [2024/40] | AT | 06.09.2023 | |
CZ | 06.09.2023 | ||
DK | 06.09.2023 | ||
EE | 06.09.2023 | ||
ES | 06.09.2023 | ||
FI | 06.09.2023 | ||
HR | 06.09.2023 | ||
IT | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
MC | 06.09.2023 | ||
NL | 06.09.2023 | ||
PL | 06.09.2023 | ||
RO | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SI | 06.09.2023 | ||
SK | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
LU | 09.12.2023 | ||
IS | 06.01.2024 | ||
PT | 08.01.2024 | ||
Former [2024/36] | AT | 06.09.2023 | |
CZ | 06.09.2023 | ||
DK | 06.09.2023 | ||
EE | 06.09.2023 | ||
ES | 06.09.2023 | ||
FI | 06.09.2023 | ||
HR | 06.09.2023 | ||
IT | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
NL | 06.09.2023 | ||
PL | 06.09.2023 | ||
RO | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SI | 06.09.2023 | ||
SK | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
IS | 06.01.2024 | ||
PT | 08.01.2024 | ||
Former [2024/33] | AT | 06.09.2023 | |
CZ | 06.09.2023 | ||
DK | 06.09.2023 | ||
EE | 06.09.2023 | ||
ES | 06.09.2023 | ||
FI | 06.09.2023 | ||
HR | 06.09.2023 | ||
IT | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
NL | 06.09.2023 | ||
PL | 06.09.2023 | ||
RO | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SK | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
IS | 06.01.2024 | ||
PT | 08.01.2024 | ||
Former [2024/26] | AT | 06.09.2023 | |
CZ | 06.09.2023 | ||
EE | 06.09.2023 | ||
ES | 06.09.2023 | ||
FI | 06.09.2023 | ||
HR | 06.09.2023 | ||
IT | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
NL | 06.09.2023 | ||
PL | 06.09.2023 | ||
RO | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SK | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
IS | 06.01.2024 | ||
PT | 08.01.2024 | ||
Former [2024/25] | AT | 06.09.2023 | |
CZ | 06.09.2023 | ||
EE | 06.09.2023 | ||
ES | 06.09.2023 | ||
FI | 06.09.2023 | ||
HR | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
NL | 06.09.2023 | ||
PL | 06.09.2023 | ||
RO | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SK | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
IS | 06.01.2024 | ||
PT | 08.01.2024 | ||
Former [2024/23] | AT | 06.09.2023 | |
CZ | 06.09.2023 | ||
EE | 06.09.2023 | ||
ES | 06.09.2023 | ||
FI | 06.09.2023 | ||
HR | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
NL | 06.09.2023 | ||
RO | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SK | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
IS | 06.01.2024 | ||
PT | 08.01.2024 | ||
Former [2024/20] | FI | 06.09.2023 | |
HR | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
NL | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
SM | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
IS | 06.01.2024 | ||
Former [2024/14] | FI | 06.09.2023 | |
HR | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
NL | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
Former [2024/10] | FI | 06.09.2023 | |
HR | 06.09.2023 | ||
LT | 06.09.2023 | ||
LV | 06.09.2023 | ||
RS | 06.09.2023 | ||
SE | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
Former [2024/09] | FI | 06.09.2023 | |
LT | 06.09.2023 | ||
SE | 06.09.2023 | ||
NO | 06.12.2023 | ||
GR | 07.12.2023 | ||
Former [2024/08] | LT | 06.09.2023 | |
NO | 06.12.2023 | ||
GR | 07.12.2023 | Cited in | International search | [A]EP0992273 (TECHSPACE AERO [BE]) [A] 1-22* the whole document *; | [XAI]US2004094036 (NICHOLS RANDALL W [US], et al) [X] 1,2,6,7,14,16-20,22 * the whole document * [A] 3,5,8-13,15,21 [I] 4; | [A]EP2821604 (NABTESCO AUTOMOTIVE CORP [JP]) [A] 1-22 * the whole document *; | [A]EP2835534 (NABTESCO AUTOMOTIVE CORP [JP]) [A] 1-22 * the whole document * |