EP3878072 - HYBRID POWER PLANT [Right-click to bookmark this link] | Status | Examination is in progress Status updated on 29.07.2022 Database last updated on 19.10.2024 | |
Former | Request for examination was made Status updated on 13.08.2021 | ||
Former | The international publication has been made Status updated on 20.06.2020 | ||
Former | unknown Status updated on 17.01.2020 | Most recent event Tooltip | 14.08.2024 | New entry: Reply to examination report | Applicant(s) | For all designated states GE Grid Solutions LLC 4200 Wildwood Parkway Atlanta, GA 30339-8402 / US | [2024/04] |
Former [2021/37] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
BURRA, Rajni 11610 N 110 PI Scottsdale, Arizona 85259 / US | 02 /
SAGI, Deepak Raj John F. Welch Technology Centre EPIP 122 (Phase II) Whitefield Road Bengaluru 560066 / IN | 03 /
TIWARI, Arvind Kumar J99, 1365 Van Antwerp Village Niskayuna, New York 12309 / US | [2021/37] | Representative(s) | Brevalex Tour Trinity 1 B Place de la Défense 92400 Courbevoie / FR | [N/P] |
Former [2021/37] | Brevalex 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | Application number, filing date | 19832813.0 | 12.12.2019 | [2021/37] | WO2019US65970 | Priority number, date | IN201841047089 | 12.12.2018 Original published format: IN201841047089 | [2021/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020123799 | Date: | 18.06.2020 | Language: | EN | [2020/25] | Type: | A1 Application with search report | No.: | EP3878072 | Date: | 15.09.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.06.2020 takes the place of the publication of the European patent application. | [2021/37] | Search report(s) | International search report - published on: | EP | 18.06.2020 | Classification | IPC: | H02J7/35, H02J3/48, H02J3/00, G06Q50/06 | [2021/37] | CPC: |
H02J3/003 (EP,KR);
H02J3/48 (EP,KR);
H02J3/381 (US);
G05B19/042 (US);
G06Q30/06 (EP,KR);
G06Q50/06 (EP,KR);
H02J13/00001 (US);
H02J3/004 (EP,KR,US);
H02J7/35 (EP,KR);
G05B2219/24215 (US);
G05B2219/2619 (US);
H02J2300/24 (EP,KR,US);
H02J2300/28 (EP,KR,US);
H02J2300/40 (EP,KR);
Y02E10/56 (EP,KR);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/37] | Title | German: | HYBRIDKRAFTWERK | [2021/37] | English: | HYBRID POWER PLANT | [2021/37] | French: | CENTRALE ÉLECTRIQUE HYBRIDE | [2021/37] | Entry into regional phase | 08.06.2021 | National basic fee paid | 08.06.2021 | Designation fee(s) paid | 08.06.2021 | Examination fee paid | Examination procedure | 08.06.2021 | Examination requested [2021/37] | 08.06.2021 | Date on which the examining division has become responsible | 08.12.2021 | Amendment by applicant (claims and/or description) | 29.07.2022 | Despatch of a communication from the examining division (Time limit: M06) | 06.02.2023 | Reply to a communication from the examining division | 20.02.2024 | Despatch of a communication from the examining division (Time limit: M06) | 14.08.2024 | Reply to a communication from the examining division | Fees paid | Renewal fee | 16.12.2021 | Renewal fee patent year 03 | 20.12.2022 | Renewal fee patent year 04 | 19.12.2023 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [A]US7930070 (IMES KEVIN R [US]); | [A]US2012323396 (SHELTON JOHN CHRISTOPHER [US], et al); | [XI]WO2015031581 (BOSCH GMBH ROBERT [DE], et al); | [X]US9438041 (ROY BINAYAK [US], et al); |