| EP3897293 - SLIDING DRAWER WITH ANTI-LIFTING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.09.2025 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 03.10.2024 | ||
| Former | Grant of patent is intended Status updated on 04.07.2024 | ||
| Former | Examination is in progress Status updated on 28.07.2023 | ||
| Former | Request for examination was made Status updated on 24.09.2021 | ||
| Former | The international publication has been made Status updated on 02.07.2020 | ||
| Former | unknown Status updated on 24.01.2020 | Most recent event Tooltip | 16.01.2026 | Lapse of the patent in a contracting state New state(s): GB | published on 18.02.2026 [2026/08] | Applicant(s) | For all designated states Bortoluzzi Sistemi S.p.A. Via Caduti 14 Settembre 1944, 45 32100 Belluno / IT | [2024/31] |
| Former [2021/43] | For all designated states Bortoluzzi Sistemi S.p.A. Via Caduti 14 Settembre 1944 45 32100 Belluno / IT | Inventor(s) | 01 /
SPONGA, Bruno c/o Bortoluzzi Sistemi S.p.A Via Caduti 14 Settembre 1944, 45 32100 Belluno / IT | 02 /
PIANCA, Marco c/o Bortoluzzi Sistemi S.p.A. Via Caduti 14 Settembre 1944, 45 32100 Belluno / IT | [2021/43] | Representative(s) | Citron, Massimiliano Via Primo Maggio, 6 31020 San Fior (TV) / IT | [2021/43] | Application number, filing date | 19836528.0 | 15.12.2019 | [2021/43] | WO2019IB60814 | Priority number, date | IT20180020176 | 19.12.2018 Original published format: IT201800020176 | [2021/43] | Filing language | IT | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020128770 | Date: | 25.06.2020 | Language: | EN | [2020/26] | Type: | A1 Application with search report | No.: | EP3897293 | Date: | 27.10.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.06.2020 takes the place of the publication of the European patent application. | [2021/43] | Type: | B1 Patent specification | No.: | EP3897293 | Date: | 06.11.2024 | Language: | EN | [2024/45] | Search report(s) | International search report - published on: | EP | 25.06.2020 | Classification | IPC: | A47B88/407, A47B88/427 | [2021/43] | CPC: |
A47B88/407 (EP,US);
A47B88/427 (EP,US);
A47B2088/4276 (US);
A47B2210/0054 (US);
A47B2210/0056 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SCHUBLADE MIT AUSHEBESICHERUNG | [2024/30] | English: | SLIDING DRAWER WITH ANTI-LIFTING SYSTEM | [2021/43] | French: | TIROIR COULISSANT AVEC SYSTÈME ANTI-LEVAGE | [2024/30] |
| Former [2021/43] | SCHUBLADE MIT ANTIHUBSYSTEM | ||
| Former [2021/43] | TIROIR COULISSANT AVEC SYSTÈME ANTI-SOULÈVEMENT | Entry into regional phase | 29.06.2021 | National basic fee paid | 29.06.2021 | Designation fee(s) paid | 29.06.2021 | Examination fee paid | Examination procedure | 29.06.2021 | Examination requested [2021/43] | 29.06.2021 | Date on which the examining division has become responsible | 27.01.2022 | Amendment by applicant (claims and/or description) | 27.07.2023 | Despatch of a communication from the examining division (Time limit: M04) | 08.11.2023 | Reply to a communication from the examining division | 05.07.2024 | Communication of intention to grant the patent | 14.09.2024 | Receipt of the translation of the claim(s) | 27.09.2024 | Fee for grant paid | 27.09.2024 | Fee for publishing/printing paid | Opposition(s) | 07.08.2025 | No opposition filed within time limit [2025/42] | Fees paid | Renewal fee | 28.12.2021 | Renewal fee patent year 03 | 29.12.2022 | Renewal fee patent year 04 | 29.12.2023 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 06.11.2024 | BG | 06.11.2024 | CZ | 06.11.2024 | DK | 06.11.2024 | EE | 06.11.2024 | FI | 06.11.2024 | HR | 06.11.2024 | LV | 06.11.2024 | MC | 06.11.2024 | NL | 06.11.2024 | RO | 06.11.2024 | SE | 06.11.2024 | SK | 06.11.2024 | SM | 06.11.2024 | IE | 15.12.2024 | LU | 15.12.2024 | BE | 31.12.2024 | CH | 31.12.2024 | FR | 06.01.2025 | GB | 06.02.2025 | NO | 06.02.2025 | RS | 06.02.2025 | GR | 07.02.2025 | IS | 06.03.2025 | PT | 06.03.2025 | [2026/08] |
| Former [2025/48] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| CZ | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| EE | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| MC | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| RO | 06.11.2024 | ||
| SE | 06.11.2024 | ||
| SK | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| IE | 15.12.2024 | ||
| LU | 15.12.2024 | ||
| BE | 31.12.2024 | ||
| CH | 31.12.2024 | ||
| FR | 06.01.2025 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/47] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| CZ | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| EE | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| MC | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| RO | 06.11.2024 | ||
| SE | 06.11.2024 | ||
| SK | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| LU | 15.12.2024 | ||
| BE | 31.12.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/43] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| CZ | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| EE | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| MC | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| RO | 06.11.2024 | ||
| SE | 06.11.2024 | ||
| SK | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| LU | 15.12.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/42] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| CZ | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| EE | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| RO | 06.11.2024 | ||
| SE | 06.11.2024 | ||
| SK | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| LU | 15.12.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/39] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| CZ | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| EE | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| RO | 06.11.2024 | ||
| SK | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| LU | 15.12.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/36] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| CZ | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| EE | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| RO | 06.11.2024 | ||
| SK | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/35] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| EE | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| RO | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/33] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| DK | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/32] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| SM | 06.11.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/23] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| NO | 06.02.2025 | ||
| RS | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/22] | AT | 06.11.2024 | |
| BG | 06.11.2024 | ||
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| LV | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| NO | 06.02.2025 | ||
| GR | 07.02.2025 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | ||
| Former [2025/21] | BG | 06.11.2024 | |
| FI | 06.11.2024 | ||
| HR | 06.11.2024 | ||
| NL | 06.11.2024 | ||
| IS | 06.03.2025 | ||
| PT | 06.03.2025 | Cited in | International search | [XA] GB2449894 (KING SLIDE WORKS CO LTD et al.) [X] 1-3,8,9 * the whole document *[A] 4-7,10 | [XA] US2003234603 (SALICE LUCIANO et al.) [X] 1,2 * paragraph [0067] - paragraph [0075]; figures 13-25 *[A] 3-10 |