blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3836605

EP3836605 - MEASUREMENT GAP CONFIGURATION METHOD AND NETWORK NODE [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  19.01.2024
Database last updated on 03.09.2024
FormerRequest for examination was made
Status updated on  01.12.2023
FormerGrant of patent is intended
Status updated on  11.10.2023
FormerRequest for examination was made
Status updated on  14.05.2021
FormerThe international publication has been made
Status updated on  15.02.2020
Most recent event   Tooltip12.06.2024New entry: Renewal fee paid 
Applicant(s)For all designated states
VIVO MOBILE COMMUNICATION CO., LTD.
283 BBK Road
Wusha
Chang'an
Dongguan, Guangdong 523860 / CN
[2021/24]
Inventor(s)01 / CHEN, Li
283, BBK Road
Wusha
Chang'an
Dongguan, Guangdong 523860 / CN
 [2021/24]
Representative(s)Lavoix
Bayerstraße 83
80335 München / DE
[2021/24]
Application number, filing date19845995.026.07.2019
[2021/24]
WO2019CN97866
Priority number, dateCN20181089341807.08.2018         Original published format: CN201810893418
[2021/24]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020029811
Date:13.02.2020
Language:ZH
[2020/07]
Type: A1 Application with search report 
No.:EP3836605
Date:16.06.2021
Language:EN
[2021/24]
Search report(s)International search report - published on:CN13.02.2020
(Supplementary) European search report - dispatched on:EP22.09.2021
ClassificationIPC:H04W24/10, H04W36/00, H04W76/28, // H04W48/12
[2021/42]
CPC:
H04W36/0088 (EP); H04W24/10 (CN,KR,US); H04W24/02 (US);
H04W72/23 (KR); H04W76/15 (KR); H04W48/12 (EP)
Former IPC [2021/24]H04W24/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/24]
TitleGerman:MESSSPALTKONFIGURATIONSVERFAHREN UND NETZWERKKNOTEN[2021/24]
English:MEASUREMENT GAP CONFIGURATION METHOD AND NETWORK NODE[2021/24]
French:PROCÉDÉ DE CONFIGURATION D'INTERVALLE DE MESURE ET NOEUD DE RÉSEAU[2021/24]
Entry into regional phase08.03.2021Translation filed 
08.03.2021National basic fee paid 
08.03.2021Search fee paid 
08.03.2021Designation fee(s) paid 
08.03.2021Examination fee paid 
Examination proceduredeletedCommunication of intention to grant the patent
08.03.2021Examination requested  [2021/24]
22.04.2022Amendment by applicant (claims and/or description)
12.10.2023Communication of intention to grant the patent
29.11.2023Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
19.01.2024Despatch of a communication from the examining division (Time limit: M04)
17.05.2024Reply to a communication from the examining division
Fees paidRenewal fee
08.03.2021Renewal fee patent year 03
15.06.2022Renewal fee patent year 04
14.06.2023Renewal fee patent year 05
12.06.2024Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[E]EP3709699  (VIVO MOBILE COMMUNICATION CO LTD [CN]) [E] 1-9* paragraph [0001] - paragraph [0126] *;
 [X]  - ZTE CORPORATION ET AL, "Discussion on the configuration of measurement gap", vol. RAN WG2, no. Reno, USA; 20171127 - 20171201, (20171116), 3GPP DRAFT; R2-1712602 DISCUSSION ON THE CONFIGURATION OF MEASUREMENT GAP, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F100/Docs/, (20171116), XP051371180 [X] 1-15 * paragraph [0002]; table 1 *
 [A]  - ZTE CORPORATION, "Summary of Offline discussion #43 [Gap Type decision]", vol. RAN WG2, no. Busan, Korea; 20180521 - 20180525, (20180525), 3GPP DRAFT; R2-1809128 SUMMARY OF OFFLINE#43_GAP TYPE DECISION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG2%5FRL2/TSGR2%5F102/Docs/R2%2D1809128%2Ezip, (20180525), XP051520455 [A] 1-15 * paragraph [0001] - paragraph [0002]; figures 1-2 *
International search[A]CN105191391  (HUAWEI TECH CO LTD) [A] 1-44;
 [A]CN106105302  (SAMSUNG ELECTRONICS CO LTD)[A] 1-44;
 [A]WO2016182527  (INTEL IP CORP [US]) [A] 1-44;
 [X]  - NOKIA, "Clarification for measurement gap type", 3GPP TSG-RAN WG2 Meeting #102 R2-1808577, (20180525), XP051444834 [X] 1-44
 [X]  - HUAWEI, "Measurement gap coordination", 3GPP TSG-RAN WG2 NR Ad hoc R2-1706734, (20170629), XP051301233 [X] 1-44 * , *
 [A]  - "Measurement and gap configuration framework in NGEN-DC", 3GPP TSG-RAN WG2 Meeting #AH1807 R2-1809635, (20180706), XP051466905 [A] 1-44 * , *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.