blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3797493

EP3797493 - END-TO-END (E2E) PERFORMANCE MEASUREMENTS IN 5G NETWORKS [Right-click to bookmark this link]
StatusThe application has been withdrawn
Status updated on  22.04.2022
Database last updated on 11.09.2024
FormerRequest for examination was made
Status updated on  26.02.2021
FormerThe international publication has been made
Status updated on  15.02.2020
Most recent event   Tooltip22.04.2022Withdrawal of applicationpublished on 25.05.2022  [2022/21]
Applicant(s)For all designated states
Apple Inc.
One Apple Park Way
Cupertino, CA 95014 / US
[2021/13]
Inventor(s)01 / YAO, Yizhi
2352 W. Desertbroom Pl
Chandler, AZ 85248 / US
02 / CHOU, Joey
8825 N. 85th Place
Scottsdale, AZ 85258 / US
 [2021/13]
Representative(s)Simmons & Simmons
City Point
One Ropemaker Street
London EC2Y 9SS / GB
[2021/13]
Application number, filing date19846538.706.08.2019
[2021/13]
WO2019US45253
Priority number, dateUS201862715583P07.08.2018         Original published format: US 201862715583 P
[2021/13]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2020033373
Date:13.02.2020
Language:EN
[2020/07]
Type: A1 Application with search report 
No.:EP3797493
Date:31.03.2021
Language:EN
The application published by WIPO in one of the EPO official languages on 13.02.2020 takes the place of the publication of the European patent application.
[2021/13]
Search report(s)International search report - published on:KR13.02.2020
(Supplementary) European search report - dispatched on:EP01.10.2021
ClassificationIPC:H04L12/26, H04W24/08
[2021/13]
CPC:
H04L43/0852 (EP,CN,US); H04W24/08 (EP,CN,US); H04L43/0817 (EP);
H04L43/20 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/13]
TitleGerman:ENDE-ZU-ENDE (E2E) LEISTUNGSMESSUNGEN IN 5G NETZWERKEN[2021/13]
English:END-TO-END (E2E) PERFORMANCE MEASUREMENTS IN 5G NETWORKS[2021/13]
French:MESURES DE PERFORMANCE DE BOUT EN BOUT (E2E) DANS DES RÉSEAUX 5G[2021/13]
Entry into regional phase23.12.2020National basic fee paid 
23.12.2020Search fee paid 
23.12.2020Designation fee(s) paid 
23.12.2020Examination fee paid 
Examination procedure20.05.2020Request for preliminary examination filed
International Preliminary Examining Authority: US
23.12.2020Amendment by applicant (claims and/or description)
23.12.2020Examination requested  [2021/13]
19.04.2022Application withdrawn by applicant  [2022/21]
Divisional application(s)EP22168354.3
Fees paidRenewal fee
13.08.2021Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[YA]US2017373950  (SZILAGYI PETER [HU], et al) [Y] 8 * paragraph [0001] - paragraph [0072] *[A] 1-7,9,10;
 [XYI]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Telecommunication management; Management and orchestration of 5G networks; 5G End to end Key Performance Indicators (KPI) (Release 15)", 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 28.554, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20180803), vol. SA WG5, no. V1.2.2, pages 1 - 15, XP051475105 [X] 1,5-7 * page 5 * * Point 6.3.1 and 6.3.1.1; page 8 * * page 13 - page 14 * [Y] 8 [I] 2-4,9,10
 [XI]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Management and orchestration of 5G networks; Performance measurements and assurance data (Release 15)", 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 28.552, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20180803), vol. SA WG5, no. V0.5.2, pages 1 - 31, XP051475104 [X] 1-6 * Point 5.1.1.3; page 9 * * Points 5.1.2.3 and 5.1.2.4; page 12 - page 13 * * Point 6.1; page 26 * * page 28 - page 30 * [I] 9,10
International search[A]KR20170014796  (SK TELECOM CO LTD [KR]) [A] 1-20 * See paragraphs [0041]-[0044]; and figure 4. *;
 [A]US2017373950  (SZILAGYI PETER [HU], et al) [A] 1-20* See claims 45-62. *;
 [XA]  - 3GPP, "3GPP; TSG SA; Management and orchestration of 5G networks; Performance measrements and assurance data (Release 15)", 3GPP TS 28.552 V0.5.2, (20180803), pages 1 - 31, XP051475104 [X] 1-9, 18-20 * See sections 5.1.2.4.1, 5.4.1.1, 5.4.2, 6.1, 6.2; and annex A.1. * [A] 10-17
 [A]  - "Network Functions Virtualisation (NFV); NFV Security; Security and Trust Guidance", ETSI GS NFV-SEC 003 V1.1.1, (20141201), no. V1.1.1, XP014235736 [A] 1-20 * See sections 4.4.2.1, 5.2.2.2. *
 [A]  - VODAFONE, "Discussion on URLLC KPIs", 3GPP TSG-SA WG1 Meeting #82 S1-181332, Dubrovnik, Croatia, (20180515), XP051534165 [A] 1-20 * See sections 1-2. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.