EP3829907 - ELECTRIC VEHICLE AIR CONDITIONING SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.03.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.03.2023 | ||
Former | Grant of patent is intended Status updated on 13.11.2022 | ||
Former | Request for examination was made Status updated on 07.05.2021 | ||
Former | The international publication has been made Status updated on 21.03.2020 | Most recent event Tooltip | 02.08.2024 | Lapse of the patent in a contracting state New state(s): BE | published on 04.09.2024 [2024/36] | Applicant(s) | For all designated states MAGNA INTERNATIONAL INC 337 Magna Drive Aurora Ontario L4G 7K1 / CA | [2021/23] | Inventor(s) | 01 /
SCHLAGER, Gerd Oberer Markt 23 4292 Kefermarkt / AT | [2021/23] | Representative(s) | Glawe, Delfs, Moll Partnerschaft mbB von Patent- und Rechtsanwälten Postfach 13 03 91 20103 Hamburg / DE | [2021/23] | Application number, filing date | 19859715.5 | 11.09.2019 | [2021/23] | WO2019CA51279 | Priority number, date | US201862729582P | 11.09.2018 Original published format: US 201862729582 P | [2021/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020051696 | Date: | 19.03.2020 | Language: | EN | [2020/12] | Type: | A1 Application with search report | No.: | EP3829907 | Date: | 09.06.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.03.2020 takes the place of the publication of the European patent application. | [2021/23] | Type: | B1 Patent specification | No.: | EP3829907 | Date: | 26.04.2023 | Language: | EN | [2023/17] | Search report(s) | International search report - published on: | CA | 19.03.2020 | (Supplementary) European search report - dispatched on: | EP | 09.09.2021 | Classification | IPC: | B60H1/32, B60K23/00, B60L7/10, B60H1/00, B60K1/00, B60K25/00, B60L1/00, B60L15/20 | [2022/47] | CPC: |
B60K1/00 (EP);
B60H1/3208 (EP,US);
B60H1/00392 (EP,US);
B60H1/3222 (EP,US);
B60H1/3229 (EP);
B60K25/00 (EP);
B60L1/003 (EP);
B60L15/2009 (EP);
B60L7/10 (EP);
B60H2001/3295 (EP);
B60K2025/005 (EP);
Y02T10/64 (EP);
Y02T10/72 (EP)
(-)
|
Former IPC [2021/41] | B60H1/32, B60K23/00, B60L7/10, B60H1/00 | ||
Former IPC [2021/23] | B60H1/32, B60K23/00, B60L7/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/23] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | ELEKTROFAHRZEUGKLIMATISIERUNGSSYSTEM UND -VERFAHREN | [2021/23] | English: | ELECTRIC VEHICLE AIR CONDITIONING SYSTEM AND METHOD | [2021/23] | French: | SYSTÈME ET PROCÉDÉ DE CLIMATISATION DE VÉHICULE ÉLECTRIQUE | [2021/23] | Entry into regional phase | 02.03.2021 | National basic fee paid | 02.03.2021 | Search fee paid | 02.03.2021 | Designation fee(s) paid | 02.03.2021 | Examination fee paid | Examination procedure | 11.05.2020 | Request for preliminary examination filed International Preliminary Examining Authority: CA | 02.03.2021 | Examination requested [2021/23] | 15.03.2022 | Amendment by applicant (claims and/or description) | 14.11.2022 | Communication of intention to grant the patent | 10.03.2023 | Fee for grant paid | 10.03.2023 | Fee for publishing/printing paid | 10.03.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 29.01.2024 | No opposition filed within time limit [2024/14] | Fees paid | Renewal fee | 10.09.2021 | Renewal fee patent year 03 | 15.07.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 26.04.2023 | CZ | 26.04.2023 | DK | 26.04.2023 | EE | 26.04.2023 | ES | 26.04.2023 | FI | 26.04.2023 | HR | 26.04.2023 | IT | 26.04.2023 | LT | 26.04.2023 | LV | 26.04.2023 | MC | 26.04.2023 | NL | 26.04.2023 | PL | 26.04.2023 | RO | 26.04.2023 | RS | 26.04.2023 | SE | 26.04.2023 | SI | 26.04.2023 | SK | 26.04.2023 | SM | 26.04.2023 | NO | 26.07.2023 | GR | 27.07.2023 | IS | 26.08.2023 | PT | 28.08.2023 | IE | 11.09.2023 | LU | 11.09.2023 | BE | 30.09.2023 | CH | 30.09.2023 | [2024/36] |
Former [2024/34] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
IE | 11.09.2023 | ||
LU | 11.09.2023 | ||
CH | 30.09.2023 | ||
Former [2024/33] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
IE | 11.09.2023 | ||
LU | 11.09.2023 | ||
Former [2024/28] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
MC | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
LU | 11.09.2023 | ||
Former [2024/26] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
IT | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
LU | 11.09.2023 | ||
Former [2024/25] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SI | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
LU | 11.09.2023 | ||
Former [2024/10] | AT | 26.04.2023 | |
CZ | 26.04.2023 | ||
DK | 26.04.2023 | ||
EE | 26.04.2023 | ||
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RO | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/08] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
SK | 26.04.2023 | ||
SM | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/03] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
FI | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2024/01] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
LT | 26.04.2023 | ||
LV | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/51] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
HR | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
RS | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/50] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
PL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
GR | 27.07.2023 | ||
IS | 26.08.2023 | ||
PT | 28.08.2023 | ||
Former [2023/48] | AT | 26.04.2023 | |
ES | 26.04.2023 | ||
NL | 26.04.2023 | ||
SE | 26.04.2023 | ||
NO | 26.07.2023 | ||
PT | 28.08.2023 | ||
Former [2023/46] | ES | 26.04.2023 | |
NL | 26.04.2023 | ||
PT | 28.08.2023 | ||
Former [2023/43] | NL | 26.04.2023 | Documents cited: | Search | [X]JP2011213163 (HONDA MOTOR CO LTD); | [Y]US2013006460 (ENDO YASUHIRO [JP], et al); | [Y]DE102014004741 (DAIMLER AG [DE]) | International search | [A]US6634247 (PELS THOMAS [DE], et al); | [A]US6701731 (AIKAWA YASUKAZU [JP], et al); | [A]JP2011213164 (HONDA MOTOR CO LTD); | [X]WO2017102343 (BOSCH GMBH ROBERT [DE]); | [A]JP6156399B | by applicant | JP2011213163 |