| EP3887288 - MULTIPLE TEMPERATURE AUTOMATED STORAGE SYSTEM AND METHOD [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 05.07.2024 Database last updated on 21.03.2026 | |
| Former | Grant of patent is intended Status updated on 15.06.2024 | ||
| Former | Request for examination was made Status updated on 24.05.2024 | ||
| Former | Grant of patent is intended Status updated on 14.05.2024 | ||
| Former | Request for examination was made Status updated on 03.09.2021 | ||
| Former | The international publication has been made Status updated on 06.06.2020 | Most recent event Tooltip | 13.03.2026 | Lapse of the patent in a contracting state New state(s): HU | published on 15.04.2026 [2026/16] | Applicant(s) | For all designated states Dematic Corp. 507 Plymouth Avenue, NE Grand Rapids, MI 49505 / US | [2021/40] | Inventor(s) | 01 /
BOER, William R. 70 N Patterson Road Wayland, Michigan 49348 / US | 02 /
HASMAN, Anthony W. 8742 Navaho Trail Howard City, Michigan 49329 / US | [2021/40] | Representative(s) | Moser Götze & Partner Patentanwälte mbB Paul-Klinger-Strasse 9 45127 Essen / DE | [2021/40] | Application number, filing date | 19888410.8 | 27.11.2019 | [2021/40] | WO2019IB60249 | Priority number, date | US201862772408P | 28.11.2018 Original published format: US 201862772408 P | [2021/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020110041 | Date: | 04.06.2020 | Language: | EN | [2020/23] | Type: | A1 Application with search report | No.: | EP3887288 | Date: | 06.10.2021 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.06.2020 takes the place of the publication of the European patent application. | [2021/40] | Type: | B1 Patent specification | No.: | EP3887288 | Date: | 07.08.2024 | Language: | EN | [2024/32] | Search report(s) | International search report - published on: | US | 04.06.2020 | (Supplementary) European search report - dispatched on: | EP | 08.07.2022 | Classification | IPC: | B65G1/04, B65G1/137, F25D13/02, F25D13/04, F25D13/06, F25D25/02, F25D25/04, F25D23/06 | [2022/32] | CPC: |
B65G1/0414 (EP,US);
F25D13/06 (US);
B65G1/0492 (EP,US);
F25D13/04 (EP);
F25D17/005 (US);
F25D25/04 (EP);
F25D23/069 (EP)
(-)
|
| Former IPC [2021/40] | B65G1/04, B65G1/137, F25D13/02, F25D13/04, F25D13/06, F25D25/02, F25D25/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR AUTOMATISIERTEN LAGERUNG BEI MEHREREN TEMPERATUREN | [2021/40] | English: | MULTIPLE TEMPERATURE AUTOMATED STORAGE SYSTEM AND METHOD | [2021/40] | French: | SYSTÈME ET PROCÉDÉ DE STOCKAGE AUTOMATISÉ À TEMPÉRATURES MULTIPLES | [2021/40] | Entry into regional phase | 31.05.2021 | National basic fee paid | 31.05.2021 | Search fee paid | 31.05.2021 | Designation fee(s) paid | 31.05.2021 | Examination fee paid | Examination procedure | 31.05.2021 | Examination requested [2021/40] | 24.10.2022 | Amendment by applicant (claims and/or description) | 15.05.2024 | Communication of intention to grant the patent | 23.05.2024 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 12.06.2024 | Fee for grant paid | 12.06.2024 | Fee for publishing/printing paid | 24.06.2024 | Communication of intention to grant the patent | 28.06.2024 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
07.05.2025
08.05.2025
ADMISSIBLE TGW Logistics GmbH Ludwig Szinicz Straße 3 4614 Oberösterreich Marchtrenk / AT Opponent's representative Burger, Hannes Alfred Anwälte Burger & Partner Rechtsanwalt GmbH Rosenauerweg 16 4580 Windischgarsten / AT | [2025/39] |
| Former [2025/24] | |||
| Opponent(s) | 01
07.05.2025
08.05.2025
ADMISSIBLE TGW Logistics Group GmbH Ludwig Szinicz Straße 3 4614 Marchtrenk / AT Opponent's representative Burger, Hannes Alfred Anwälte Burger & Partner Rechtsanwalt GmbH Rosenauerweg 16 4580 Windischgarsten / AT | 21.05.2025 | Invitation to proprietor to file observations on the notice of opposition | 17.09.2025 | Reply of patent proprietor to notice(s) of opposition | Fees paid | Renewal fee | 24.11.2021 | Renewal fee patent year 03 | 24.11.2022 | Renewal fee patent year 04 | 24.11.2023 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.11.2019 | BG | 07.08.2024 | CZ | 07.08.2024 | DK | 07.08.2024 | EE | 07.08.2024 | FI | 07.08.2024 | HR | 07.08.2024 | LV | 07.08.2024 | MC | 07.08.2024 | PL | 07.08.2024 | RO | 07.08.2024 | SE | 07.08.2024 | SK | 07.08.2024 | SM | 07.08.2024 | NO | 07.11.2024 | RS | 07.11.2024 | GR | 08.11.2024 | IE | 27.11.2024 | IT | 27.11.2024 | LU | 27.11.2024 | BE | 30.11.2024 | IS | 07.12.2024 | PT | 09.12.2024 | [2026/16] |
| Former [2026/08] | BG | 07.08.2024 | |
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IE | 27.11.2024 | ||
| IT | 27.11.2024 | ||
| LU | 27.11.2024 | ||
| BE | 30.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/48] | BG | 07.08.2024 | |
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IE | 27.11.2024 | ||
| LU | 27.11.2024 | ||
| BE | 30.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/47] | BG | 07.08.2024 | |
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| LU | 27.11.2024 | ||
| BE | 30.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/42] | BG | 07.08.2024 | |
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SE | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| LU | 27.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/34] | BG | 07.08.2024 | |
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| LU | 27.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/33] | BG | 07.08.2024 | |
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| MC | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/23] | BG | 07.08.2024 | |
| CZ | 07.08.2024 | ||
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SK | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/22] | BG | 07.08.2024 | |
| DK | 07.08.2024 | ||
| EE | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/21] | BG | 07.08.2024 | |
| DK | 07.08.2024 | ||
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| RO | 07.08.2024 | ||
| SM | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/10] | BG | 07.08.2024 | |
| FI | 07.08.2024 | ||
| HR | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| RS | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/09] | BG | 07.08.2024 | |
| FI | 07.08.2024 | ||
| LV | 07.08.2024 | ||
| PL | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| IS | 07.12.2024 | ||
| PT | 09.12.2024 | ||
| Former [2025/08] | FI | 07.08.2024 | |
| PL | 07.08.2024 | ||
| NO | 07.11.2024 | ||
| GR | 08.11.2024 | ||
| PT | 09.12.2024 | Documents cited: | Search | [E] EP3844084 (ALERT INNOVATION INC et al.) [E] 1,2,6,8,10,11 * paragraph [0039] - paragraph [0046] * * figures 5-7 * | [A] US2016376103 (DE ANGELIS MARCO et al.) [A] 1-14 * the whole document * | [A] US2015291357 (RAZUMOV SERGEY N et al.) [A] 1-14 * the whole document * | [A] JP5126591 [A] 1-14 * the whole document * | [A] JP4798429 [A] 1-14 * the whole document * | [A] JPS56155362 (DAIFUKU MACHINERY WORKS) [A] 1-14 * the whole document * | [A] DE10011205 (WIESSNER GMBH et al.) [A] 1-14 * the whole document * | International search | [XP] US2020005229 (DURKEE PAUL E et al.) [XP] 1-3, 8, 12, 14-15, 33, 35-36, 40 * ; figure 9; paragraphs [0030], [0032] * | [YA] US2016376103 (DE ANGELIS MARCO et al.) [Y] 1-4, 8, 12-15, 33, 35-36, 40-41 * ; figures 7, 11; paragraphs [0021], [0031], [0041]-[0042], [0048]-[0052] *[A] 5-7, 9-11, 34, 37-39 | [YA] CN107054958 (SHENZHEN COMMA INTERCONNECTION TECH CO LTD et al.) [Y] 1-4, 8, 12-15, 33, 35-36, 40-41 * ; see machine translation *[A] 5-7, 9-11, 34, 37-39 | [YA] US2016130086 (YAMASHITA SHIN et al.) [Y] 14-15 * ; abstract; figure 4; paragraph [0074] *[A] 6-7, 38-39 | [A] US2017029210 (BRZOZKA ADRIAN et al.) [A] 5-7, 37-39 * ; abstract; figures 1-4; paragraph [0029] * | [A] CN107902313 (CHANGSHA MADIK INTELLIGENT TECH CO LTD et al.) [A] 9-11, 34 * ; see machine translation * | by applicant | US2016376103 | US9630777 | US10301113 | Opposition | DE102014112994 | EP0780643 | DE102017110373 | DE102013102778 | EP2949604 | WO2016191777 | WO2015159139 |