EP3944691 - WIRELESS COMMUNICATION METHOD, TERMINAL DEVICE AND NETWORK DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.12.2023 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 13.01.2023 | ||
Former | Grant of patent is intended Status updated on 06.12.2022 | ||
Former | Request for examination was made Status updated on 24.12.2021 | ||
Former | The international publication has been made Status updated on 23.10.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan, Guangdong 523860 / CN | [2022/04] | Inventor(s) | 01 /
CHEN, Wenhong No. 18, Haibin Road, Wusha, Chang'an Dongguan, Guangdong 523860 / CN | [2023/07] |
Former [2022/04] | 01 /
CHEN, Wenhong Dongguan, Guangdong 523860 / CN | Representative(s) | Novagraaf Technologies Bâtiment O2 2, rue Sarah Bernhardt CS90017 92665 Asnières-sur-Seine Cedex / FR | [2022/04] | Application number, filing date | 19925473.1 | 19.04.2019 | [2022/04] | WO2019CN83544 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2020211096 | Date: | 22.10.2020 | Language: | ZH | [2020/43] | Type: | A1 Application with search report | No.: | EP3944691 | Date: | 26.01.2022 | Language: | EN | [2022/04] | Type: | B1 Patent specification | No.: | EP3944691 | Date: | 15.02.2023 | Language: | EN | [2023/07] | Search report(s) | International search report - published on: | CN | 22.10.2020 | (Supplementary) European search report - dispatched on: | EP | 22.03.2022 | Classification | IPC: | H04W72/04, H04W72/12, H04L5/00 | [2022/16] | CPC: |
H04L5/0035 (EP);
H04L5/0053 (EP,CN,US);
H04W72/23 (US);
H04L1/0033 (CN);
H04L1/0036 (CN);
H04W72/20 (US);
H04L5/0094 (EP)
(-)
|
Former IPC [2022/04] | H04W72/04, H04W72/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2022/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | KH | Not yet paid | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | DRAHTLOSKOMMUNIKATIONSVERFAHREN, ENDGERÄTEVORRICHTUNG UND NETZWERKVORRICHTUNG | [2022/04] | English: | WIRELESS COMMUNICATION METHOD, TERMINAL DEVICE AND NETWORK DEVICE | [2022/04] | French: | PROCÉDÉ DE COMMUNICATION SANS FIL, DISPOSITIF TERMINAL ET DISPOSITIF DE RÉSEAU | [2022/04] | Entry into regional phase | 21.10.2021 | Translation filed | 21.10.2021 | National basic fee paid | 21.10.2021 | Search fee paid | 21.10.2021 | Designation fee(s) paid | 21.10.2021 | Examination fee paid | Examination procedure | 21.10.2021 | Examination requested [2022/04] | 04.10.2022 | Amendment by applicant (claims and/or description) | 07.12.2022 | Communication of intention to grant the patent | 29.12.2022 | Fee for grant paid | 29.12.2022 | Fee for publishing/printing paid | 29.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 16.11.2023 | No opposition filed within time limit [2024/04] | Fees paid | Renewal fee | 21.10.2021 | Renewal fee patent year 03 | 25.03.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 15.02.2023 | CZ | 15.02.2023 | DK | 15.02.2023 | ES | 15.02.2023 | FI | 15.02.2023 | HR | 15.02.2023 | IT | 15.02.2023 | LT | 15.02.2023 | LV | 15.02.2023 | MC | 15.02.2023 | NL | 15.02.2023 | PL | 15.02.2023 | RO | 15.02.2023 | RS | 15.02.2023 | SE | 15.02.2023 | SI | 15.02.2023 | SK | 15.02.2023 | SM | 15.02.2023 | IE | 19.04.2023 | LU | 19.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | LI | 30.04.2023 | NO | 15.05.2023 | GR | 16.05.2023 | IS | 15.06.2023 | PT | 15.06.2023 | [2024/26] |
Former [2024/21] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SI | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
IE | 19.04.2023 | ||
LU | 19.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/11] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SI | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
LU | 19.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/09] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
LU | 19.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/08] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
LU | 19.04.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/04] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
LU | 19.04.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/50] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/49] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/46] | AT | 15.02.2023 | |
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
SM | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/39] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/38] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/37] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
GR | 16.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/36] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
RS | 15.02.2023 | ||
SE | 15.02.2023 | ||
NO | 15.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/35] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
HR | 15.02.2023 | ||
LT | 15.02.2023 | ||
NL | 15.02.2023 | ||
RS | 15.02.2023 | ||
NO | 15.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/34] | ES | 15.02.2023 | |
LT | 15.02.2023 | ||
RS | 15.02.2023 | ||
PT | 15.06.2023 | ||
Former [2023/33] | ES | 15.02.2023 | |
LT | 15.02.2023 | Documents cited: | Search | [XY]WO2013127453 (FUJITSU LTD [JP], et al) [X] 1-6,8-15 * abstract * * page 25 * * figures 10-14 * [Y] 7; | [X]US2018309560 (TANG CHIEN-HSIN [TW]) [X] 1,10,14,15 * abstract * * paragraphs [0040] , [0052] - [0053] * * figures 1,5 *; | [Y] - ZTE ET AL, "NR DL Control Channel Structure", vol. RAN WG1, no. Athens, Greece; 20170213 - 20170217, (20170212), 3GPP DRAFT; R1-1701585 NR DL CONTROL CHANNEL STRUCTURE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170212), XP051208752 [Y] 7 * abstract * * page 2 * * figure 2 * | International search | [X]CN102395206 (CHINA ACADEMY OF TELECOMM TECH) [X] 1-60 * description, paragraphs [0027]-[0036] *; | [A]WO2013114632 (NEC CORP [JP], et al) [A] 1-60 * entire document *; | [A]CN108366413 (HUAWEI TECH CO LTD) [A] 1-60 * entire document *; | [A]CN109347611 (HUAWEI TECH CO LTD) [A] 1-60 * entire document *; | [A] - CATT, "R1-1717840, Remaining Aspects of CA Operation", 3GPP TSG RAN WG1 Meeting #90bis, (20171013), doi:20200108100223A, XP051341025 [A] 1-60 * entire document * |