blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3753841

EP3753841 - TRANSLATION SYSTEM FOR AN OUTBOARD AND INBOARD TENDER WITH RESPECT TO A GARAGE OF A SHIP [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.12.2022
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  07.01.2022
FormerGrant of patent is intended
Status updated on  26.08.2021
FormerRequest for examination was made
Status updated on  25.06.2021
FormerThe application has been published
Status updated on  20.11.2020
Most recent event   Tooltip17.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 19.06.2024  [2024/25]
Applicant(s)For all designated states
SETEC S.p.A.
Via Bligny, 5
10122 Torino (TO) / IT
[2020/52]
Inventor(s)01 / Seminatore, Fabio
c/o Setec S.p.A. a company organized under the Laws of Italy
Via Bligny, 5
10122 Torino (TO) / IT
 [2020/52]
Representative(s)Aprà, Mario
Aprà Brevetti
Via Bertola 2
10121 Torino / IT
[2020/52]
Application number, filing date20000216.016.06.2020
[2020/52]
Priority number, dateIT2019000917417.06.2019         Original published format: IT201900009174
[2020/52]
Filing languageIT
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3753841
Date:23.12.2020
Language:EN
[2020/52]
Type: B1 Patent specification 
No.:EP3753841
Date:09.02.2022
Language:EN
[2022/06]
Search report(s)(Supplementary) European search report - dispatched on:EP29.10.2020
ClassificationIPC:B63B27/36, B63B23/26
[2020/52]
CPC:
B63B23/26 (EP); B63B27/36 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2021/30]
Former [2020/52]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM ZUM ÜBERFÜHREN EINES BEIBOOTES MIT AUSSEN- UND INNENBORDMOTOR IN BEZUG AUF EINE SCHIFFSGARAGE[2020/52]
English:TRANSLATION SYSTEM FOR AN OUTBOARD AND INBOARD TENDER WITH RESPECT TO A GARAGE OF A SHIP[2020/52]
French:SYSTEME DE DEPLACEMENT D'UN TENDER HORS BORD ET A BORD PAR RAPPORT AU GARAGE D'UN NAVIRE[2020/52]
Examination procedure18.06.2021Examination requested  [2021/30]
18.06.2021Date on which the examining division has become responsible
27.08.2021Communication of intention to grant the patent
22.12.2021Fee for grant paid
22.12.2021Fee for publishing/printing paid
24.12.2021Receipt of the translation of the claim(s)
Opposition(s)10.11.2022No opposition filed within time limit [2023/03]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.06.2020
AL09.02.2022
AT09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
MK09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
IE16.06.2022
LU16.06.2022
BE30.06.2022
[2024/25]
Former [2024/23]AL09.02.2022
AT09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
MK09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
IE16.06.2022
LU16.06.2022
BE30.06.2022
Former [2024/20]AL09.02.2022
AT09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
IE16.06.2022
LU16.06.2022
BE30.06.2022
Former [2023/35]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
IE16.06.2022
LU16.06.2022
BE30.06.2022
Former [2023/26]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
IE16.06.2022
LU16.06.2022
BE30.06.2022
Former [2023/21]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
IE16.06.2022
LU16.06.2022
Former [2023/20]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
IE16.06.2022
Former [2023/10]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/08]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/01]AL09.02.2022
AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/49]AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/48]AT09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/47]AT09.02.2022
DK09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/46]AT09.02.2022
DK09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/42]AT09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/39]AT09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
PT09.06.2022
Former [2022/36]AT09.02.2022
ES09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
PT09.06.2022
Former [2022/35]ES09.02.2022
HR09.02.2022
LT09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
PT09.06.2022
Former [2022/34]ES09.02.2022
LT09.02.2022
NO09.05.2022
PT09.06.2022
Former [2022/33]LT09.02.2022
NO09.05.2022
Documents cited:Search[A]JP2008013025  (KAYABA SYSTEM MACHINERY KK) [A] 1,2 * paragraph [0012] - paragraph [0033]; figures 1-3 *;
 [A]KR101880730B  (CHOI JAE DO [KR]) [A] 1,2 * paragraph [0029] - paragraph [0129]; figures 1-8 *;
 [A]GB322353  (BRICE HENRY VALENTINE WHITE) [A] 1,2 * page 1, line 47 - page 2, line 36; figure 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.