EP3678088 - METHOD AND SYSTEM OF CONVOLUTION IN NEURAL NETWORK WITH VARIABLE DILATION RATE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.06.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 07.07.2023 | ||
Former | Grant of patent is intended Status updated on 27.03.2023 | ||
Former | Request for examination was made Status updated on 15.01.2021 | ||
Former | The application has been published Status updated on 05.06.2020 | Most recent event Tooltip | 18.10.2024 | Lapse of the patent in a contracting state New state(s): BE, FR | published on 20.11.2024 [2024/47] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2020/28] | Inventor(s) | 01 /
YADAV, Dinesh Kumar c/o Samsung Advanced Institute of Technology, 130 Samsung-ro Yeongtong-gu 16678 Suwon-si, Gyeonggi-do / KR | 02 /
DESHWAL, Ankur c/o Samsung Advanced Institute of Technology, 130 Samsung-ro 16678 Suwon-si, Gyeonggi-do / KR | 03 /
DAS, Saptarsi c/o Samsung Advanced Institute of Technology, 130 Samsung-ro 16678 Suwon-si, Gyeonggi-do / KR | 04 /
JANG, Junwoo c/o Samsung Advanced Institute of Technology, 130 Samsung-ro 16678 Suwon-si, Gyeonggi-do / KR | 05 /
LEE, Sehwan c/o Samsung Advanced Institute of Technology, 130 Samsung-ro 16678 Suwon-si, Gyeonggi-do / KR | [2020/28] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2020/28] | Application number, filing date | 20150187.1 | 03.01.2020 | [2020/28] | Priority number, date | IN201941000324 | 03.01.2019 Original published format: IN201941000324 | IN201941000324 | 27.12.2019 Original published format: IN201941000324 | [2020/28] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3678088 | Date: | 08.07.2020 | Language: | EN | [2020/28] | Type: | B1 Patent specification | No.: | EP3678088 | Date: | 09.08.2023 | Language: | EN | [2023/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.05.2020 | Classification | IPC: | G06T5/20, G06N3/08, G06N3/045 | [2023/16] | CPC: |
G06T5/20 (EP,US);
G06N3/08 (EP,KR,US);
G06N3/045 (EP,CN);
G06F17/153 (KR);
G06F18/2111 (US);
G06N3/063 (KR);
|
Former IPC [2020/28] | G06T5/20, G06N3/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/07] |
Former [2020/28] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN UND SYSTEM ZUR FALTUNG IN NEURONALEM NETZWERK MIT VARIABLER DILATIONSRATE | [2020/28] | English: | METHOD AND SYSTEM OF CONVOLUTION IN NEURAL NETWORK WITH VARIABLE DILATION RATE | [2020/28] | French: | PROCÉDÉ ET SYSTÈME DE CONVOLUTION DANS UN RÉSEAU NEURONAL AVEC DÉBIT DE DILATATION VARIABLE | [2020/28] | Examination procedure | 07.01.2021 | Amendment by applicant (claims and/or description) | 07.01.2021 | Examination requested [2021/07] | 07.01.2021 | Date on which the examining division has become responsible | 28.03.2023 | Communication of intention to grant the patent | 03.07.2023 | Fee for grant paid | 03.07.2023 | Fee for publishing/printing paid | 03.07.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 13.05.2024 | No opposition filed within time limit [2024/29] | Fees paid | Renewal fee | 31.12.2021 | Renewal fee patent year 03 | 30.12.2022 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 09.08.2023 | CZ | 09.08.2023 | DK | 09.08.2023 | EE | 09.08.2023 | ES | 09.08.2023 | FI | 09.08.2023 | HR | 09.08.2023 | IT | 09.08.2023 | LT | 09.08.2023 | LV | 09.08.2023 | MC | 09.08.2023 | NL | 09.08.2023 | PL | 09.08.2023 | RO | 09.08.2023 | RS | 09.08.2023 | SE | 09.08.2023 | SI | 09.08.2023 | SK | 09.08.2023 | SM | 09.08.2023 | NO | 09.11.2023 | GR | 10.11.2023 | IS | 09.12.2023 | PT | 11.12.2023 | LU | 03.01.2024 | BE | 31.01.2024 | FR | 31.01.2024 | [2024/47] |
Former [2024/43] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
IT | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
MC | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SI | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
LU | 03.01.2024 | ||
Former [2024/40] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
IT | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
MC | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SI | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/36] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
IT | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SI | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/26] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
IT | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/23] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
EE | 09.08.2023 | ||
ES | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SK | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/22] | AT | 09.08.2023 | |
CZ | 09.08.2023 | ||
DK | 09.08.2023 | ||
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RO | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/20] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
SM | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/10] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
HR | 09.08.2023 | ||
LT | 09.08.2023 | ||
LV | 09.08.2023 | ||
NL | 09.08.2023 | ||
PL | 09.08.2023 | ||
RS | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
PT | 11.12.2023 | ||
Former [2024/09] | AT | 09.08.2023 | |
FI | 09.08.2023 | ||
LT | 09.08.2023 | ||
NL | 09.08.2023 | ||
SE | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | ||
IS | 09.12.2023 | ||
Former [2024/08] | LT | 09.08.2023 | |
NL | 09.08.2023 | ||
NO | 09.11.2023 | ||
GR | 10.11.2023 | Documents cited: | Search | [A]WO2018081089 (DEEPMIND TECH LTD [GB]); | [A]US10067509 (WANG PANQU [US], et al); |