EP3693089 - SEPARATION DEVICE AND FIBER BODY DEPOSITION APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.08.2022 Database last updated on 03.08.2024 | |
Former | The patent has been granted Status updated on 10.09.2021 | ||
Former | Grant of patent is intended Status updated on 07.06.2021 | ||
Former | Request for examination was made Status updated on 22.01.2021 | ||
Former | The application has been published Status updated on 10.07.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Seiko Epson Corporation 1-6, Shinjuku 4-chome Shinjuku-ku Tokyo 160-8801 / JP | [2020/33] | Inventor(s) | 01 /
INAGAKI, Yuta c/o Seiko Epson Corporation 3-5 Owa 3-chome Suwa-shi, Nagano 392-8502 / JP | 02 /
OMAGARI, Naoko c/o Seiko Epson Corporation 3-5 Owa 3-chome Suwa-shi, Nagano 392-8502 / JP | [2020/33] | Representative(s) | Miller Sturt Kenyon 9 John Street London WC1N 2ES / GB | [2020/33] | Application number, filing date | 20154479.8 | 30.01.2020 | [2020/33] | Priority number, date | JP20190016118 | 31.01.2019 Original published format: JP 2019016118 | [2020/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3693089 | Date: | 12.08.2020 | Language: | EN | [2020/33] | Type: | B1 Patent specification | No.: | EP3693089 | Date: | 13.10.2021 | Language: | EN | [2021/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.07.2020 | Classification | IPC: | B07B1/06, B07B1/08, B07B4/08, B07B7/06, B07B11/06 | [2020/33] | CPC: |
B07B1/06 (EP);
D01G11/04 (CN);
B07B4/08 (EP,US);
B05C21/00 (US);
B07B1/08 (EP);
B07B11/06 (EP);
B07B7/06 (EP);
D04H1/488 (CN);
D04H1/587 (CN);
D06B1/02 (CN);
B02C23/10 (US);
B07B11/04 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/08] |
Former [2020/33] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | TRENNVORRICHTUNG UND FASERKÖRPERABSCHEIDUNGSVORRICHTUNG | [2020/33] | English: | SEPARATION DEVICE AND FIBER BODY DEPOSITION APPARATUS | [2020/33] | French: | DISPOSITIF DE SÉPARATION ET APPAREIL DE DÉPÔT DE CORPS DE FIBRES | [2020/33] | Examination procedure | 19.01.2021 | Examination requested [2021/08] | 19.01.2021 | Date on which the examining division has become responsible | 08.06.2021 | Communication of intention to grant the patent | 07.09.2021 | Fee for grant paid | 07.09.2021 | Fee for publishing/printing paid | 07.09.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 14.07.2022 | No opposition filed within time limit [2022/38] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.01.2020 | AL | 13.10.2021 | AT | 13.10.2021 | CY | 13.10.2021 | CZ | 13.10.2021 | DK | 13.10.2021 | EE | 13.10.2021 | ES | 13.10.2021 | FI | 13.10.2021 | HR | 13.10.2021 | IT | 13.10.2021 | LT | 13.10.2021 | LV | 13.10.2021 | MC | 13.10.2021 | MK | 13.10.2021 | NL | 13.10.2021 | PL | 13.10.2021 | RO | 13.10.2021 | RS | 13.10.2021 | SE | 13.10.2021 | SI | 13.10.2021 | SK | 13.10.2021 | SM | 13.10.2021 | TR | 13.10.2021 | BG | 13.01.2022 | NO | 13.01.2022 | GR | 14.01.2022 | IE | 30.01.2022 | LU | 30.01.2022 | BE | 31.01.2022 | IS | 13.02.2022 | PT | 14.02.2022 | [2024/29] |
Former [2024/25] | HU | 30.01.2020 | |
AL | 13.10.2021 | ||
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IE | 30.01.2022 | ||
LU | 30.01.2022 | ||
BE | 31.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2024/23] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
MK | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IE | 30.01.2022 | ||
LU | 30.01.2022 | ||
BE | 31.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2024/20] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CY | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IE | 30.01.2022 | ||
LU | 30.01.2022 | ||
BE | 31.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/27] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
IT | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IE | 30.01.2022 | ||
LU | 30.01.2022 | ||
BE | 31.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/09] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IE | 30.01.2022 | ||
LU | 30.01.2022 | ||
BE | 31.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2023/01] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SI | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
LU | 30.01.2022 | ||
BE | 31.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/49] | AL | 13.10.2021 | |
AT | 13.10.2021 | ||
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
LU | 30.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/46] | AT | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
LU | 30.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/39] | AT | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
MC | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/35] | AT | 13.10.2021 | |
CZ | 13.10.2021 | ||
DK | 13.10.2021 | ||
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SK | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/34] | AT | 13.10.2021 | |
EE | 13.10.2021 | ||
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RO | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/33] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
SM | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/25] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
NO | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/24] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
NL | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
SE | 13.10.2021 | ||
BG | 13.01.2022 | ||
GR | 14.01.2022 | ||
IS | 13.02.2022 | ||
PT | 14.02.2022 | ||
Former [2022/23] | AT | 13.10.2021 | |
ES | 13.10.2021 | ||
FI | 13.10.2021 | ||
HR | 13.10.2021 | ||
LT | 13.10.2021 | ||
LV | 13.10.2021 | ||
PL | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
PT | 14.02.2022 | ||
Former [2022/22] | AT | 13.10.2021 | |
FI | 13.10.2021 | ||
LT | 13.10.2021 | ||
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/21] | AT | 13.10.2021 | |
RS | 13.10.2021 | ||
BG | 13.01.2022 | ||
Former [2022/19] | BG | 13.01.2022 | Documents cited: | Search | [A]DE2459537 (BEHNIGSEN MACKIEWICZ ANDREAS V) [A] 1-3* figure 1; claim 1 *; | [A]US4251355 (NELSON RONALD C, et al) [A] 1-7 * figure 1 *; | [AD]JPH07108224 (MIZUI KATSUYA) [AD] 1-9 * the whole document *; | [A]DE19502203 (LEINERT PETER DIPL CHEM [DE]) [A] 1-3,7 * the whole document * | by applicant | JPH07108224 | JP20190016118 |