EP3709181 - FLY-BY-WIRE SYSTEMS AND RELATED OPERATING METHODS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.08.2023 Database last updated on 12.08.2024 | |
Former | The patent has been granted Status updated on 26.08.2022 | ||
Former | Grant of patent is intended Status updated on 25.04.2022 | ||
Former | Request for examination was made Status updated on 03.09.2021 | ||
Former | The application has been published Status updated on 14.08.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Honeywell International Inc. 855 S. Mint Street Charlotte, NC 28202 / US | [2022/19] |
Former [2020/38] | For all designated states Honeywell International Inc. 115 Tabor Road M/S 4D3 P.O.Box 377 Morris Plains, NJ 07950 / US | Inventor(s) | 01 /
WILKENS, Dean HONEYWELL INTERNATIONAL INC.; Mail Stop: 4D3 115 Tabor Road Morris Plains, NJ 07950 / US | [2020/38] | Representative(s) | LKGlobal UK Ltd. Cambridge House Henry Street Bath BA1 1BT / GB | [2022/39] |
Former [2020/38] | LKGlobal UK Ltd. Cambridge House, Henry Street Bath BA1 1BT / GB | Application number, filing date | 20156495.2 | 10.02.2020 | [2020/38] | Priority number, date | US201916279552 | 19.02.2019 Original published format: US201916279552 | [2020/38] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3709181 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Type: | A3 Search report | No.: | EP3709181 | Date: | 03.03.2021 | Language: | EN | [2021/09] | Type: | B1 Patent specification | No.: | EP3709181 | Date: | 28.09.2022 | Language: | EN | [2022/39] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.02.2021 | Classification | IPC: | G06F13/40, G06F13/42, G06F11/16, G06F11/18, G06F11/20, H04L12/40 | [2020/48] | CPC: |
G06F13/4295 (EP);
H04L12/40006 (CN);
B64C13/503 (EP,US);
B64C13/50 (CN);
B64D43/00 (US);
G05D1/0077 (EP,US);
G06F13/4004 (EP);
G06F13/405 (EP);
H04L12/40 (US);
|
Former IPC [2020/38] | G06F13/40, G06F13/42 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/40] |
Former [2020/38] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | FLY-BY-WIRE-SYSTEME UND ZUGEHÖRIGE BETRIEBSVERFAHREN | [2020/38] | English: | FLY-BY-WIRE SYSTEMS AND RELATED OPERATING METHODS | [2020/38] | French: | SYSTÈMES DE COMMANDE DE VOL ÉLECTRIQUE ET PROCÉDÉS DE FONCTIONNEMENT ASSOCIÉS | [2020/38] | Examination procedure | 31.08.2021 | Amendment by applicant (claims and/or description) | 31.08.2021 | Examination requested [2021/40] | 31.08.2021 | Date on which the examining division has become responsible | 26.04.2022 | Communication of intention to grant the patent | 17.08.2022 | Fee for grant paid | 17.08.2022 | Fee for publishing/printing paid | 17.08.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 29.06.2023 | No opposition filed within time limit [2023/36] | Fees paid | Renewal fee | 24.02.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 28.09.2022 | AT | 28.09.2022 | CZ | 28.09.2022 | DK | 28.09.2022 | EE | 28.09.2022 | ES | 28.09.2022 | FI | 28.09.2022 | HR | 28.09.2022 | IT | 28.09.2022 | LT | 28.09.2022 | LV | 28.09.2022 | MC | 28.09.2022 | NL | 28.09.2022 | PL | 28.09.2022 | RO | 28.09.2022 | RS | 28.09.2022 | SE | 28.09.2022 | SI | 28.09.2022 | SK | 28.09.2022 | SM | 28.09.2022 | NO | 28.12.2022 | GR | 29.12.2022 | IS | 28.01.2023 | PT | 30.01.2023 | IE | 10.02.2023 | LU | 10.02.2023 | BE | 28.02.2023 | CH | 28.02.2023 | LI | 28.02.2023 | [2024/26] |
Former [2024/12] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
IE | 10.02.2023 | ||
LU | 10.02.2023 | ||
BE | 28.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2024/08] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
IE | 10.02.2023 | ||
LU | 10.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/51] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SI | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
LU | 10.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/49] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
LU | 10.02.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/48] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
CH | 28.02.2023 | ||
LI | 28.02.2023 | ||
Former [2023/44] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
MC | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/34] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
DK | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/30] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
NL | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/29] | AL | 28.09.2022 | |
AT | 28.09.2022 | ||
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/26] | AT | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
PL | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
IS | 28.01.2023 | ||
PT | 30.01.2023 | ||
Former [2023/23] | AT | 28.09.2022 | |
CZ | 28.09.2022 | ||
EE | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SK | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/22] | AT | 28.09.2022 | |
CZ | 28.09.2022 | ||
ES | 28.09.2022 | ||
FI | 28.09.2022 | ||
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RO | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
PT | 30.01.2023 | ||
Former [2023/20] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
SM | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
Former [2023/10] | FI | 28.09.2022 | |
HR | 28.09.2022 | ||
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | ||
GR | 29.12.2022 | ||
Former [2023/09] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
LV | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | ||
Former [2023/08] | FI | 28.09.2022 | |
LT | 28.09.2022 | ||
RS | 28.09.2022 | ||
SE | 28.09.2022 | ||
NO | 28.12.2022 | Documents cited: | Search | [A]US2017050588 (HAMMERSCHMIDT DIRK [DE]) [A] 1-13 * paragraph [0002] - paragraph [0005] ** paragraph [0017] - paragraph [0049]; figure 1 *; | [A]US2017220502 (KESSLER MARTIN [US], et al) [A] 1-13 * the whole document * |