| EP3680356 - WROUGHT ALUMINUM ALLOY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.01.2023 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 04.02.2022 | ||
| Former | Grant of patent is intended Status updated on 23.11.2021 | ||
| Former | Examination is in progress Status updated on 16.04.2021 | ||
| Former | Request for examination was made Status updated on 12.06.2020 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Korea Automotive Technology Institute 303 Pungse-ro Pungse-myeon Dongnam-gu Cheonan-si, Chungcheongnam-do 31214 / KR | [2020/29] | Inventor(s) | 01 /
SUNG, Si Young 117-1503, 68, Tongjeong 3-ro Dongnam-gu Cheonan-si 31204 Chungcheongnam-do / KR | 02 /
HAN, Beom Suck 117-2304, 36, Gwongwang-ro 260beon-gil Suwon-si 16532 Gyeonggi-do / KR | 03 /
KIM, Se Hoon 104-605, 68, Tongjeong 3-ro Dongnam-gu Cheonan-si 31204 Chungcheongnam-do / KR | 04 /
SHIN, Jae Hyuk No. 306, 5-26, Tongjeong 8-ro Dongnam-gu Cheonan-si 31208 Chungcheongnam-do / KR | 05 /
KIM, Jin Pyeong 214-504, 769-28, Pungse-ro Dongnam-gu Cheonan-si 31202 Chungcheongnam-do / KR | [2020/29] | Representative(s) | Shearman, James Ward Marks & Clerk LLP 15 Fetter Lane London EC4A 1BW / GB | [2020/29] | Application number, filing date | 20157510.7 | 03.04.2017 | [2020/29] | Priority number, date | KR20160040972 | 04.04.2016 Original published format: KR 20160040972 | KR20160136665 | 20.10.2016 Original published format: KR 20160136665 | [2020/29] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3680356 | Date: | 15.07.2020 | Language: | EN | [2020/29] | Type: | B1 Patent specification | No.: | EP3680356 | Date: | 09.03.2022 | Language: | EN | [2022/10] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 27.03.2020 | Classification | IPC: | C22C21/10 | [2020/29] | CPC: |
C22C21/10 (EP,CN,US);
C22F1/053 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/29] | Title | German: | ALUMINIUMKNETLEGIERUNG | [2020/29] | English: | WROUGHT ALUMINUM ALLOY | [2020/29] | French: | ALLIAGE D'ALUMINIUM CORROYÉ | [2020/29] | Examination procedure | 14.02.2020 | Examination requested [2020/29] | 24.12.2020 | Amendment by applicant (claims and/or description) | 19.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2021 | Reply to a communication from the examining division | 24.11.2021 | Communication of intention to grant the patent | 01.02.2022 | Fee for grant paid | 01.02.2022 | Fee for publishing/printing paid | 01.02.2022 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP17164614.4 / EP3239313 | Opposition(s) | 12.12.2022 | No opposition filed within time limit [2023/07] | Fees paid | Renewal fee | 14.02.2020 | Renewal fee patent year 03 | 14.02.2020 | Renewal fee patent year 04 | 15.04.2021 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.04.2017 | AL | 09.03.2022 | AT | 09.03.2022 | CY | 09.03.2022 | CZ | 09.03.2022 | DK | 09.03.2022 | EE | 09.03.2022 | ES | 09.03.2022 | FI | 09.03.2022 | HR | 09.03.2022 | IT | 09.03.2022 | LT | 09.03.2022 | LV | 09.03.2022 | MC | 09.03.2022 | MK | 09.03.2022 | MT | 09.03.2022 | NL | 09.03.2022 | RO | 09.03.2022 | RS | 09.03.2022 | SE | 09.03.2022 | SI | 09.03.2022 | SK | 09.03.2022 | SM | 09.03.2022 | TR | 09.03.2022 | IE | 03.04.2022 | LU | 03.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | BG | 09.06.2022 | GB | 09.06.2022 | NO | 09.06.2022 | GR | 10.06.2022 | IS | 09.07.2022 | PT | 11.07.2022 | [2024/44] |
| Former [2024/29] | HU | 03.04.2017 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| TR | 09.03.2022 | ||
| IE | 03.04.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| GB | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2024/25] | HU | 03.04.2017 | |
| AL | 09.03.2022 | ||
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 03.04.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| GB | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2024/23] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| MK | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 03.04.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| GB | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2024/20] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CY | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 03.04.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| GB | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/35] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| IT | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 03.04.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| GB | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/27] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 03.04.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| GB | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/20] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| IE | 03.04.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/10] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SI | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| LU | 03.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/09] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| LU | 03.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/08] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| LU | 03.04.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/07] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| DK | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/06] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| MC | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2023/01] | AL | 09.03.2022 | |
| AT | 09.03.2022 | ||
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/51] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| IS | 09.07.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/49] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SK | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/48] | AT | 09.03.2022 | |
| CZ | 09.03.2022 | ||
| EE | 09.03.2022 | ||
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/47] | AT | 09.03.2022 | |
| ES | 09.03.2022 | ||
| FI | 09.03.2022 | ||
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RO | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| SM | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| PT | 11.07.2022 | ||
| Former [2022/44] | FI | 09.03.2022 | |
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| NL | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/39] | FI | 09.03.2022 | |
| HR | 09.03.2022 | ||
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/36] | HR | 09.03.2022 | |
| LT | 09.03.2022 | ||
| LV | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| GR | 10.06.2022 | ||
| Former [2022/35] | HR | 09.03.2022 | |
| LT | 09.03.2022 | ||
| RS | 09.03.2022 | ||
| SE | 09.03.2022 | ||
| BG | 09.06.2022 | ||
| NO | 09.06.2022 | ||
| Former [2022/33] | LT | 09.03.2022 | |
| NO | 09.06.2022 | Documents cited: | Search | [A] US2013146183 (MIYATA YUKIMASA et al.) | [A] WO2008003506 (ALERIS ALUMINIUM KOBLENZ GMBH et al.) [A] 1-4 * paragraphs [0006] - [0010] - [0014] - [0029]; table 1 * | [A] JPS59118865 (KOBE STEEL LTD et al.) [A] 1-4 * page 8 - page 9; claims 1,2 * | [A] JPS62130255 (KOBE STEEL LTD et al.) [A] 1-4 * table 1 * | [A] JPS62250149 (KOBE STEEL LTD et al.) [A] 1-4 * abstract * | [A] WO2015141647 (KOBE STEEL LTD et al.) [A] 1-4 * abstract * | [A] JP2015061948 (KOBE STEEL LTD et al.) [A] 1-4 * table 1 * | [A] JP2014062284 (KOBE STEEL LTD et al.) [A] 1-4 * table 1 * | by applicant | EP17164614 |