blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3866356

EP3866356 - METHOD OF MEASURING A TOTAL RADIATED POWER OF A DEVICE UNDER TEST AS WELL AS TEST SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.06.2024
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  21.07.2023
FormerGrant of patent is intended
Status updated on  28.03.2023
FormerRequest for examination was made
Status updated on  04.02.2022
FormerThe application has been published
Status updated on  16.07.2021
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): SI
published on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Rohde & Schwarz GmbH & Co. KG
Mühldorfstrasse 15
81671 München / DE
[2021/33]
Inventor(s)01 / Abadie, Vincent
c/o Rohde & Schwarz GmbH & Co. KG
Mühldorfstrasse 15
81671 Munich / DE
 [2021/33]
Representative(s)Prinz & Partner mbB
Patent- und Rechtsanwälte
Rundfunkplatz 2
80335 München / DE
[2021/33]
Application number, filing date20157712.917.02.2020
[2021/33]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3866356
Date:18.08.2021
Language:EN
[2021/33]
Type: B1 Patent specification 
No.:EP3866356
Date:23.08.2023
Language:EN
[2023/34]
Search report(s)(Supplementary) European search report - dispatched on:EP04.08.2020
ClassificationIPC:H04B17/10
[2021/33]
CPC:
H04B17/102 (EP,US); H04B17/20 (CN); H04M1/24 (CN);
H04W24/06 (US); H04W88/02 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IS,   IT,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2023/34]
Former [2022/10]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
Former [2021/33]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR MESSUNG DER TOTALEN STRAHLUNGSLEISTUNG EINES PRÜFLINGS SOWIE PRÜFSYSTEM[2021/33]
English:METHOD OF MEASURING A TOTAL RADIATED POWER OF A DEVICE UNDER TEST AS WELL AS TEST SYSTEM[2021/33]
French:PROCÉDÉ DE MESURE DE LA PUISSANCE TOTALE RAYONNÉE D'UN DISPOSITIF SOUS TEST AINSI QU'UN SYSTÈME DE TEST[2021/33]
Examination procedure01.02.2022Amendment by applicant (claims and/or description)
01.02.2022Examination requested  [2022/10]
01.02.2022Date on which the examining division has become responsible
29.03.2023Communication of intention to grant the patent
28.06.2023Receipt of the translation of the claim(s)
19.07.2023Fee for grant paid
19.07.2023Fee for publishing/printing paid
Opposition(s)24.05.2024No opposition filed within time limit [2024/31]
Fees paidRenewal fee
16.02.2022Renewal fee patent year 03
15.02.2023Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT23.08.2023
CZ23.08.2023
DK23.08.2023
EE23.08.2023
ES23.08.2023
FI23.08.2023
HR23.08.2023
IT23.08.2023
LT23.08.2023
LV23.08.2023
NL23.08.2023
PL23.08.2023
RO23.08.2023
RS23.08.2023
SE23.08.2023
SI23.08.2023
SK23.08.2023
SM23.08.2023
NO23.11.2023
GR24.11.2023
IS23.12.2023
PT26.12.2023
[2024/36]
Former [2024/26]AT23.08.2023
CZ23.08.2023
DK23.08.2023
EE23.08.2023
ES23.08.2023
FI23.08.2023
HR23.08.2023
IT23.08.2023
LT23.08.2023
LV23.08.2023
NL23.08.2023
PL23.08.2023
RO23.08.2023
RS23.08.2023
SE23.08.2023
SK23.08.2023
SM23.08.2023
NO23.11.2023
GR24.11.2023
IS23.12.2023
PT26.12.2023
Former [2024/23]AT23.08.2023
CZ23.08.2023
DK23.08.2023
EE23.08.2023
ES23.08.2023
FI23.08.2023
HR23.08.2023
LT23.08.2023
LV23.08.2023
NL23.08.2023
PL23.08.2023
RO23.08.2023
RS23.08.2023
SE23.08.2023
SK23.08.2023
SM23.08.2023
NO23.11.2023
GR24.11.2023
IS23.12.2023
PT26.12.2023
Former [2024/22]AT23.08.2023
CZ23.08.2023
DK23.08.2023
FI23.08.2023
HR23.08.2023
LT23.08.2023
LV23.08.2023
NL23.08.2023
PL23.08.2023
RO23.08.2023
RS23.08.2023
SE23.08.2023
SM23.08.2023
NO23.11.2023
GR24.11.2023
IS23.12.2023
PT26.12.2023
Former [2024/20]AT23.08.2023
FI23.08.2023
HR23.08.2023
LT23.08.2023
LV23.08.2023
NL23.08.2023
PL23.08.2023
RS23.08.2023
SE23.08.2023
SM23.08.2023
NO23.11.2023
GR24.11.2023
IS23.12.2023
PT26.12.2023
Former [2024/10]AT23.08.2023
FI23.08.2023
HR23.08.2023
LT23.08.2023
LV23.08.2023
NL23.08.2023
PL23.08.2023
RS23.08.2023
SE23.08.2023
NO23.11.2023
GR24.11.2023
IS23.12.2023
PT26.12.2023
Former [2024/09]AT23.08.2023
FI23.08.2023
LT23.08.2023
NL23.08.2023
SE23.08.2023
NO23.11.2023
GR24.11.2023
IS23.12.2023
Former [2024/08]LT23.08.2023
NL23.08.2023
NO23.11.2023
GR24.11.2023
Documents cited:Search[Y]WO2015085087  (DB NETWORKS INC [US]) [Y] 3,4 * paragraph [0244] *;
 [XYI]WO2019096802  (FRAUNHOFER GES FORSCHUNG [DE]) [X] 1,5-8,12,14 * figures 3b,4a * * page 6, line 11 - page 7, line 29 * * page 11, line 8 - line 13 * * page 8, line 28 - page 10, line 15 * * page 12, line 34 - page 15, line 30 * * page 18, line 33 - page 20, line 15 * * page 21, line 1 - page 22, line 2 * * page 25, line 5 - page 31, line 2 * * page 40, line 12 - page 41, line 24 * * page 45, line 4 - page 46, line 18 * [Y] 2-4 [I] 9-11,13;
 [Y]US2019182855  (BABAEI ALIREZA [US], et al) [Y] 2 * paragraph [0211] *;
 [A]  - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; User Equipment (UE) conformance specification; Radio transmission and reception; Part 2: Range 2 Standalone (Release 16)", vol. RAN WG5, no. V16.2.0, (20200114), pages 1 - 479, 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 38.521-2, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: ftp://ftp.3gpp.org/Specs/archive/38_series/38.521-2/38521-2-g20.zip 38521-2-g20.doc, (20200114), XP051860782 [A] 1-14 * page 431 - page 436 *
 [A]  - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; 5GS; User Equipment (UE) conformance specification; Part 1: Common test environment (Release 16)", vol. RAN WG5, no. V16.2.0, (20200114), pages 1 - 920, 3GPP STANDARD; TECHNICAL SPECIFICATION; 3GPP TS 38.508-1, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: ftp://ftp.3gpp.org/Specs/archive/38_series/38.508-1/38508-1-g20.zip 38508-1-g20.doc, (20200114), XP051860780 [A] 1-14 * page 889 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.