EP3705677 - TRANSMISSION FOR AN ARCHITECTURAL-STRUCTURE COVERING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.09.2023 Database last updated on 08.11.2024 | |
Former | The patent has been granted Status updated on 30.09.2022 | ||
Former | Grant of patent is intended Status updated on 19.05.2022 | ||
Former | Request for examination was made Status updated on 19.03.2021 | ||
Former | The application has been published Status updated on 07.08.2020 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Hunter Douglas Inc. 1 Blue Hill Plaza Pearl River New York NY 10965 / US | [2020/37] | Inventor(s) | 01 /
SPRAY, Jeffrey L. c/o Hunter Doulgas Industries BV 2 Piekstraat PO Box 5072 3008 AB Rotterdam / NL | 02 /
SCHWANDT, Mark c/o Hunter Doulgas Industries BV 2 Piekstraat PO Box 5072 3008 AB Rotterdam / NL | 03 /
MISCHO, Paul D. c/o Hunter Doulgas Industries BV 2 Piekstraat PO Box 5072 3008 AB Rotterdam / NL | [2020/37] | Representative(s) | J A Kemp LLP 80 Turnmill Street London EC1M 5QU / GB | [2022/44] |
Former [2020/37] | J A Kemp LLP 14 South Square Gray's Inn London WC1R 5JJ / GB | Application number, filing date | 20160735.5 | 03.03.2020 | [2020/37] | Priority number, date | US201962813886P | 05.03.2019 Original published format: US 201962813886 P | [2020/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP3705677 | Date: | 09.09.2020 | Language: | EN | [2020/37] | Type: | A3 Search report | No.: | EP3705677 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Type: | B1 Patent specification | No.: | EP3705677 | Date: | 02.11.2022 | Language: | EN | [2022/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.08.2020 | Classification | IPC: | E06B9/322 | [2020/37] | CPC: |
E06B9/322 (EP);
E06B9/24 (US);
F16H57/0025 (US);
F16H9/02 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/16] |
Former [2020/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | GETRIEBE FÜR EINE ABDECKUNG EINER ARCHITEKTONISCHEN STRUKTUR | [2020/37] | English: | TRANSMISSION FOR AN ARCHITECTURAL-STRUCTURE COVERING | [2020/37] | French: | TRANSMISSION POUR UN REVÊTEMENT DE STRUCTURE ARCHITECTURALE | [2020/37] | Examination procedure | 21.01.2021 | Observations by third parties | 11.03.2021 | Examination requested [2021/16] | 11.03.2021 | Date on which the examining division has become responsible | 08.04.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 28.05.2021 | Amendment by applicant (claims and/or description) | 20.05.2022 | Communication of intention to grant the patent | 20.09.2022 | Fee for grant paid | 20.09.2022 | Fee for publishing/printing paid | 20.09.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.08.2023 | No opposition filed within time limit [2023/41] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 28.05.2021 | Request for further processing filed | 28.05.2021 | Full payment received (date of receipt of payment) Request granted | 07.06.2021 | Decision despatched | Fees paid | Renewal fee | 17.02.2022 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 02.11.2022 | AT | 02.11.2022 | CZ | 02.11.2022 | DK | 02.11.2022 | EE | 02.11.2022 | ES | 02.11.2022 | FI | 02.11.2022 | HR | 02.11.2022 | IT | 02.11.2022 | LT | 02.11.2022 | LV | 02.11.2022 | MC | 02.11.2022 | PL | 02.11.2022 | RO | 02.11.2022 | RS | 02.11.2022 | SE | 02.11.2022 | SI | 02.11.2022 | SK | 02.11.2022 | SM | 02.11.2022 | NO | 02.02.2023 | GR | 03.02.2023 | IS | 02.03.2023 | PT | 02.03.2023 | IE | 03.03.2023 | LU | 03.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | FR | 31.03.2023 | LI | 31.03.2023 | [2024/26] |
Former [2024/11] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
IE | 03.03.2023 | ||
LU | 03.03.2023 | ||
BE | 31.03.2023 | ||
CH | 31.03.2023 | ||
FR | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/09] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
IE | 03.03.2023 | ||
LU | 03.03.2023 | ||
CH | 31.03.2023 | ||
LI | 31.03.2023 | ||
Former [2024/08] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
IE | 03.03.2023 | ||
LU | 03.03.2023 | ||
Former [2024/02] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
LU | 03.03.2023 | ||
Former [2023/51] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/48] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/38] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/37] | AL | 02.11.2022 | |
AT | 02.11.2022 | ||
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/35] | AT | 02.11.2022 | |
CZ | 02.11.2022 | ||
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/34] | AT | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/33] | AT | 02.11.2022 | |
DK | 02.11.2022 | ||
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/25] | AT | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
PL | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/23] | AT | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/22] | AT | 02.11.2022 | |
ES | 02.11.2022 | ||
FI | 02.11.2022 | ||
LT | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/20] | LT | 02.11.2022 | |
NO | 02.02.2023 | Documents cited: | Search | [AD]US6536503 (ANDERSON RICHARD [US], et al) [AD] 1-15 * figures 64-66 * * column 25, line 66 - column 26, line 26 *; | [A]WO2005009875 (HUNTER DOUGLAS [US], et al) [A] 1-15 * figures 138-145 ** page 77, line 19 - page 80, line 9 * | by applicant | US6536503 | other | US6283192 | US6536503 |